IDOT contract 91756 bid tabulation
Normal, section 20-00271-01-PV. Let by Illinois DOT on June 13, 2025, Mclean, District 05. 1 bid received; low bid $1,506,116 by Rowe Construction, a div of UCM, Inc..
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 98
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rowe Construction, a div of UCM, Inc. | $1,506,116 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rowe Construction, a div of UCM, Inc. |
|---|---|---|---|---|
| 1 | Spare ful act cont SP (X0323071) | EACH | 1 | $12,100 |
| 2 | Rem & RE vid cam & EQ (X0326836) | EACH | 1 | $5,500.00 |
| 3 | Timber railing (X2300023) | LF | 115 | $162.06 |
| 4 | Temp access- FLD ent (X4024000) | EACH | 1 | $1,620.15 |
| 5 | Remov EX flar end sec (X5427602) | EACH | 1 | $437.61 |
| 6 | Inlets SPL W/SPL F&G (X6020076) | EACH | 1 | $2,812.55 |
| 7 | Engr FLD off A SPL (X6700410) | CAL MO | 12 | $3,647.72 |
| 8 | Traf cont & prot SPL (X7010216) | LS | 1 | $70,000 |
| 9 | Conduit splice (X8100105) | EACH | 1 | $962.50 |
| 10 | Undrgrd C HDPE 4 dia (X8108242) | LF | 248 | $71.50 |
| 11 | Handhole to BE adjust (X8140115) | EACH | 1 | $6,600.00 |
| 12 | Fac T4 cab SPL (X8570226) | EACH | 1 | $45,100 |
| 13 | Ethernet switch (X8710103) | EACH | 1 | $4,675.00 |
| 14 | APS ext bracket (X8760002) | EACH | 2 | $605.00 |
| 15 | Accessible ped signal (X8760200) | EACH | 6 | $3,300.00 |
| 16 | Rem EX TR cont & cab (X8950105) | EACH | 1 | $1,925.00 |
| 17 | Construction layout (Z0013798) | LS | 1 | $25,000 |
| 18 | RR prot liability ins (Z0048665) | LS | 1 | $55,691 |
| 19 | Tree remov acres (20100500) | ACRE | 0.25 | $42,900 |
| 20 | Earth excavation (20200100) | CY | 907 | $84.56 |
| 21 | Furnished excavation (20400800) | CY | 108 | $122.04 |
| 22 | Trench backfill (20800150) | CY | 7 | $114.06 |
| 23 | Geotech fab F/GR stab (21001000) | SY | 174 | $10.36 |
| 24 | Topsoil F & P 4 (21101615) | SY | 2,274 | $18.18 |
| 25 | Seeding CL 1A (25000110) | ACRE | 0.50 | $7,700.00 |
| 26 | Nitrogen fert nutr (25000400) | LB | 45 | $4.40 |
| 27 | Phosphorus fert nutr (25000500) | LB | 45 | $4.40 |
| 28 | Potassium fert nutr (25000600) | LB | 45 | $4.40 |
| 29 | Mulch method 2 (25100115) | ACRE | 0.50 | $7,370.00 |
| 30 | Erosion contr blanket (25100630) | SY | 2,274 | $3.30 |
| 31 | Temp eros contr seed (28000250) | LB | 232 | $5.53 |
| 32 | Temp ditch checks (28000305) | LF | 16 | $22.50 |
| 33 | Perimeter eros bar (28000400) | LF | 766 | $4.13 |
| 34 | Inlet & pipe protect (28000500) | EACH | 6 | $256.36 |
| 35 | Inlet filters (28000510) | EACH | 4 | $307.99 |
| 36 | Sub gran mat B (31101000) | TON | 119 | $93.41 |
| 37 | Sub gran mat B 12 (31101810) | SY | 1,749 | $49.32 |
| 38 | Stab subbase HMA 4 (31200500) | SY | 1,749 | $45.44 |
| 39 | Agg base cse B 6 (35101800) | SY | 279 | $38.15 |
| 40 | Agg surf cse A 6 (40200500) | SY | 511 | $43.01 |
| 41 | Bit matls PR CT (40600275) | LB | 4,062 | $1.44 |
| 42 | Bit matls tack CT (40600290) | LB | 1,030 | $3.08 |
| 43 | Long joint sealant (40600370) | LF | 268 | $40.63 |
| 44 | HMA BC IL-19.0 N50 (40603080) | TON | 235 | $225.00 |
| 45 | P HMA BC IL19.0 N50 (40603230) | TON | 427 | $225.00 |
| 46 | HMA SC IL-9.5 C N50 (40604050) | TON | 33 | $400.00 |
| 47 | P HMA SC IL-9.5 D N50 (40604160) | TON | 171 | $200.00 |
| 48 | Protective coat (42001300) | SY | 454 | $0.01 |
| 49 | PC conc sidewalk 6 (42400300) | SF | 2,310 | $27.00 |
| 50 | Detectable warnings (42400800) | SF | 191 | $61.17 |
| 51 | Pavement rem (44000100) | SY | 1,670 | $51.53 |
| 52 | Comb curb gutter rem (44000500) | LF | 710 | $19.04 |
| 53 | CL D patch T2 13 (44201803) | SY | 44 | $348.48 |
| 54 | Pipe culvert remov (50105220) | LF | 34 | $38.61 |
| 55 | PRC flar end sec 24 (54213669) | EACH | 1 | $2,130.68 |
| 56 | Storm sew CL A 1 12 (550A0050) | LF | 6 | $113.12 |
| 57 | Storm sew CL A 1 24 (550A0120) | LF | 42 | $188.41 |
| 58 | Water valves adjust (56109210) | EACH | 2 | $571.70 |
| 59 | Conc HDWL for P drain (60100060) | EACH | 2 | $624.66 |
| 60 | Pipe underdrain 4 SP (60108100) | LF | 24 | $34.75 |
| 61 | Pipe underdr T 1 4 (60108104) | LF | 608 | $25.12 |
| 62 | Man TA 5 dia T1F CL (60221100) | EACH | 1 | $5,577.49 |
| 63 | Rem inlet- main flow (60500090) | EACH | 1 | $875.23 |
| 64 | Comb CC&G TB6.18 (60604400) | LF | 674 | $75.00 |
| 65 | Comb CC&G TB6.18 VWGF (60604900) | LF | 32 | $402.47 |
| 66 | Non SPL waste disposl (66900200) | CY | 740 | $63.41 |
| 67 | Soil disposal analy (66900530) | EACH | 2 | $1,650.00 |
| 68 | Reg sub P-const plan (66901001) | LS | 1 | $2,200.00 |
| 69 | Reg sub F con report (66901003) | LS | 1 | $2,200.00 |
| 70 | Reg sub mon (66901006) | CAL DAY | 2 | $1,094.50 |
| 71 | Mobilization (67100100) | LS | 1 | $90,000 |
| 72 | Sign panel T1 (72000100) | SF | 60 | $56.10 |
| 73 | Rem & rel sign panel asmbly TA (72400205) | EACH | 1 | $770.00 |
| 74 | Teles STL sin support (72800100) | LF | 104 | $35.20 |
| 75 | THPL PVT MK LTR & sym (78000100) | SF | 396 | $10.45 |
| 76 | THPL PVT MK line 6 (78000400) | LF | 2,126 | $2.70 |
| 77 | THPL PVT MK line 8 (78000500) | LF | 23 | $3.58 |
| 78 | THPL PVT MK line 12 (78000600) | LF | 24 | $5.37 |
| 79 | THPL PVT MK line 24 (78000650) | LF | 164 | $10.73 |
| 80 | Polyurea PM T2 LTR-SY (78008300) | SF | 116 | $31.13 |
| 81 | Polyurea PM T2 LN 6 (78008330) | LF | 471 | $15.62 |
| 82 | Polyurea PM T2 LN 12 (78008350) | LF | 64 | $31.90 |
| 83 | PVT MKG rem WTR blast (78300202) | SF | 850 | $7.70 |
| 84 | Undrgrd C PVC 2 (81028350) | LF | 91 | $44.00 |
| 85 | Main EX TR sig instal (85000200) | EACH | 1 | $12,100 |
| 86 | Uninter power sup STD (86200200) | EACH | 1 | $15,400 |
| 87 | Elcbl C tracer 14 1C (87300925) | LF | 161 | $7.70 |
| 88 | Elcbl C signal 14 3C (87301225) | LF | 2,480 | $8.25 |
| 89 | Elcbl C railrd 14 3C (87301750) | LF | 161 | $19.80 |
| 90 | Elcbl C serv 6 2C (87301805) | LF | 103 | $20.90 |
| 91 | Elcbl C egrdc 6 1C (87301900) | LF | 122 | $13.20 |
| 92 | TS post A 11 (87502650) | EACH | 4 | $2,750.00 |
| 93 | TS post A 16 (87502700) | EACH | 1 | $3,575.00 |
| 94 | Conc FDN TY A (87800100) | LF | 12 | $770.00 |
| 95 | Drill EX handhole (87900200) | EACH | 6 | $495.00 |
| 96 | Ped SH LED 1F BM CDT (88102717) | EACH | 6 | $1,650.00 |
| 97 | Reloc EX sig head (89500100) | EACH | 2 | $660.00 |
| 98 | Mod EX contr FDN (89502215) | EACH | 1 | $5,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.