IDOT contract 91653 bid tabulation
Bloomington, section 24-00360-01-PV. Let by Illinois DOT on August 1, 2025, Mclean, District 05. 1 bid received; low bid $16,110,130 by Rowe Construction, a div of UCM, Inc..
- Owner
- Illinois DOT
- Letting
- 01 AUG 2025
- Pay items
- 234
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rowe Construction, a div of UCM, Inc. | $16,110,130 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rowe Construction, a div of UCM, Inc. |
|---|---|---|---|---|
| 1 | PVC casing pipe 18 (XX005106) | LF | 310 | $278.20 |
| 2 | Mailbx rem & reinstl (XX005569) | EACH | 5 | $800.39 |
| 3 | Water serv ins 1 comp (XX006243) | EACH | 4 | $4,975.50 |
| 4 | SS DI T1 10 (XX006281) | LF | 246 | $160.50 |
| 5 | Conc C&G outlet SP (XX006529) | EACH | 6 | $1,445.14 |
| 6 | SS DI 14 (XX008532) | LF | 138 | $203.30 |
| 7 | SS DI 16 (XX008533) | LF | 100 | $214.00 |
| 8 | Water main abandoned (XX008839) | LS | 1 | $26,750 |
| 9 | D I water main SPL (XX008959) | LF | 230 | $321.00 |
| 10 | Concrete collar (XX008979) | EACH | 11 | $2,996.00 |
| 11 | Concrete pad (X0321313) | EACH | 5 | $5,350.00 |
| 12 | D I WM 12 RJ pipe (X1200078) | LF | 2,516 | $262.15 |
| 13 | San sew ser com (X1200310) | LF | 6 | $17,120 |
| 14 | Conc wall remov (X5012506) | LF | 26 | $432.07 |
| 15 | Dewatering struct N1 (X5021508) | EACH | 1 | $12,840 |
| 16 | DI WM 6 RJ (X5610024) | LF | 189 | $160.50 |
| 17 | WM line stop 8 (X5610748) | EACH | 2 | $12,840 |
| 18 | WM line stop 12 (X5610752) | EACH | 4 | $18,190 |
| 19 | Diwm 8 diam rest JT (X5610900) | LF | 56 | $256.80 |
| 20 | Water serv relocate (X5620108) | EACH | 1 | $58,850 |
| 21 | Conn to EX W main 6 (X5630706) | EACH | 2 | $2,140.00 |
| 22 | Conn to EX W main 8 (X5630708) | EACH | 1 | $12,840 |
| 23 | Conn to EX W main 12 (X5630712) | EACH | 2 | $14,980 |
| 24 | Inlets SPL W/SPL F&G (X6020076) | EACH | 66 | $4,863.01 |
| 25 | Manhole special (X6020084) | EACH | 1 | $20,806 |
| 26 | Man TA 7D SPL F&G (X6020290) | EACH | 1 | $20,271 |
| 27 | Man TA 4 dia SPL F&G (X6022230) | EACH | 4 | $7,538.01 |
| 28 | Man san 4 dia T1F CL (X6022810) | EACH | 3 | $14,338 |
| 29 | Man TA 5 dia SPL F&G (X6022930) | EACH | 2 | $11,390 |
| 30 | Inlets TA W/SPL F&G (X6023508) | EACH | 10 | $4,328.01 |
| 31 | Man TA 6 dia SPL F&G (X6024090) | EACH | 1 | $15,135 |
| 32 | Sanitary manhole adj (X6026050) | EACH | 6 | $1,605.00 |
| 33 | San man reconst (X6026051) | EACH | 2 | $2,461.00 |
| 34 | San manhole SPL (X6026055) | EACH | 2 | $14,213 |
| 35 | Comb CC&G TM SPL (X6061815) | LF | 135 | $95.00 |
| 36 | Flex delineators (X6350108) | EACH | 1 | $593.03 |
| 37 | Fence removal (X6640104) | LF | 434 | $16.48 |
| 38 | Traf cont & prot SPL (X7010216) | LS | 1 | $300,000 |
| 39 | Ped push-button SPL (X8800101) | EACH | 8 | $2,339.35 |
| 40 | Evp system (X8870300) | EACH | 1 | $15,750 |
| 41 | W A vid veh det sys com (X8891202) | EACH | 1 | $34,132 |
| 42 | Temp sidewalk (Z0007430) | SF | 1,000 | $8.78 |
| 43 | Construction layout (Z0013798) | LS | 1 | $175,000 |
| 44 | Detour signing (Z0016702) | LS | 1 | $21,379 |
| 45 | RR prot liability ins (Z0048665) | LS | 1 | $13,134 |
| 46 | SS 1 wat MN 12 (Z0056648) | LF | 257 | $158.36 |
| 47 | SS 1 wat MN 15 (Z0056650) | LF | 18 | $164.78 |
| 48 | SS 2 wat MN 12 (Z0056668) | LF | 35 | $224.70 |
| 49 | San sew 8 (Z0056900) | LF | 412 | $126.26 |
| 50 | San sew 12 (Z0057100) | LF | 203 | $428.00 |
| 51 | Trainees (Z0076600) | HR | 2,000 | $0.80 |
| 52 | Trainees TPG (Z0076604) | HR | 2,000 | $15.00 |
| 53 | Tree remov 6-15 (20100110) | UNIT | 220 | $26.75 |
| 54 | Tree remov over 15 (20100210) | UNIT | 648 | $42.80 |
| 55 | Tree remov acres (20100500) | ACRE | 1 | $15,000 |
| 56 | Earth excavation (20200100) | CY | 19,748 | $52.78 |
| 57 | Rem & disp uns matl (20201200) | CY | 2,144 | $55.25 |
| 58 | Trench backfill (20800150) | CY | 3,062 | $171.20 |
| 59 | Gran embank spec (21000300) | TON | 4,394 | $67.19 |
| 60 | Geotech fab F/GR stab (21001000) | SY | 5,501 | $6.34 |
| 61 | Topsoil F & P 4 (21101615) | SY | 20,050 | $19.04 |
| 62 | Topsoil F & P 6 (21101625) | SY | 2,492 | $26.63 |
| 63 | Seeding CL 1A (25000110) | ACRE | 4.75 | $5,000.00 |
| 64 | Nitrogen fert nutr (25000400) | LB | 429 | $3.21 |
| 65 | Phosphorus fert nutr (25000500) | LB | 429 | $3.21 |
| 66 | Potassium fert nutr (25000600) | LB | 429 | $3.21 |
| 67 | Mulch method 2 (25100115) | ACRE | 4.75 | $5,000.00 |
| 68 | Turf reinf mat (25100900) | SY | 90 | $10.70 |
| 69 | Temp eros contr seed (28000250) | LB | 950 | $7.34 |
| 70 | Temp ditch checks (28000305) | LF | 630 | $15.09 |
| 71 | Perimeter eros bar (28000400) | LF | 2,001 | $5.50 |
| 72 | Inlet & pipe protect (28000500) | EACH | 14 | $218.53 |
| 73 | Inlet filters (28000510) | EACH | 112 | $267.28 |
| 74 | Stone riprap CL A3 (28100105) | SY | 8 | $201.42 |
| 75 | Stone riprap CL A4 (28100107) | SY | 149 | $149.62 |
| 76 | Filter fabric (28200200) | SY | 149 | $8.33 |
| 77 | Agg subgrade impr 12 (30300112) | SY | 26,802 | $45.73 |
| 78 | Sub gran mat B 4 (31101200) | SY | 728 | $19.99 |
| 79 | Agg base cse B 5 (35101700) | SY | 3,688 | $20.52 |
| 80 | Agg base cse B 6 (35101800) | SY | 186 | $33.82 |
| 81 | Agg base cse B 8 (35102000) | SY | 718 | $35.70 |
| 82 | PCC bse cse 7 1/2 (35300210) | SY | 552 | $80.35 |
| 83 | Agg surf course TY B (40200800) | TON | 295 | $109.76 |
| 84 | Aggregate-temp access (40201000) | TON | 150 | $78.35 |
| 85 | Bit matls PR CT (40600275) | LB | 70,340 | $0.01 |
| 86 | Bit matls tack CT (40600290) | LB | 9,961 | $3.50 |
| 87 | P bit matls tack CT (40600295) | LB | 5,239 | $3.50 |
| 88 | Long joint sealant (40600370) | LF | 20,538 | $4.50 |
| 89 | HMA surf rem butt JT (40600982) | SY | 153 | $47.29 |
| 90 | Temporary ramp (40600990) | SY | 63 | $55.43 |
| 91 | HMA BC IL-19.0 N50 (40603080) | TON | 927 | $160.00 |
| 92 | HMA BC IL-19.0 N70 (40603085) | TON | 7,005 | $160.00 |
| 93 | P HMA BC IL-4.75 N50 (40603200) | TON | 23 | $275.00 |
| 94 | P HMA BC IL19.0 N70 (40603235) | TON | 2,522 | $195.00 |
| 95 | HMA SC IL-9.5 C N50 (40604050) | TON | 735 | $182.00 |
| 96 | P SC SMA 9.5 E N80 (40605024) | TON | 2,608 | $210.00 |
| 97 | Incidental HMA surf (40800050) | TON | 130 | $275.00 |
| 98 | Protective coat (42001300) | SY | 4,139 | $0.01 |
| 99 | PCC driveway pavt 6 (42300200) | SY | 191 | $130.00 |
| 100 | PCC driveway pavt 8 (42300400) | SY | 1,072 | $140.00 |
| 101 | PCC driveway pavt 10 (42300600) | SY | 131 | $170.00 |
| 102 | PC conc sidewalk 6 (42400300) | SF | 24,116 | $20.54 |
| 103 | Detectable warnings (42400800) | SF | 254 | $47.47 |
| 104 | Pavement rem (44000100) | SY | 11,679 | $23.21 |
| 105 | Drive pavement rem (44000200) | SY | 737 | $31.36 |
| 106 | Comb curb gutter rem (44000500) | LF | 765 | $18.37 |
| 107 | Sidewalk rem (44000600) | SF | 3,570 | $12.05 |
| 108 | CL C patch T2 10 (44201353) | SY | 12 | $410.14 |
| 109 | CL D patch T2 6 (44201717) | SY | 13 | $334.11 |
| 110 | Aggregate SHLDS B 6 (48101500) | SY | 269 | $40.95 |
| 111 | Pipe culvert remov (50105220) | LF | 489 | $86.40 |
| 112 | PRC flar end sec 12 (54213657) | EACH | 6 | $1,605.00 |
| 113 | PRC flar end sec 15 (54213660) | EACH | 6 | $1,712.00 |
| 114 | PRC flar end sec 18 (54213663) | EACH | 3 | $2,140.00 |
| 115 | PRC flar end sec 24 (54213669) | EACH | 3 | $2,782.00 |
| 116 | PRC flar end sec 36 (54213681) | EACH | 1 | $3,745.00 |
| 117 | PRCF end S EL eqrs 18 (54214713) | EACH | 12 | $2,247.00 |
| 118 | PRCF end S EL eqrs 42 (54214737) | EACH | 4 | $6,848.00 |
| 119 | Storm sew CL A 1 12 (550A0050) | LF | 1,269 | $92.02 |
| 120 | Storm sew CL A 1 15 (550A0070) | LF | 493 | $98.44 |
| 121 | Storm sew CL A 1 18 (550A0090) | LF | 206 | $128.40 |
| 122 | Storm sew CL A 1 21 (550A0110) | LF | 116 | $162.64 |
| 123 | Storm sew CL A 1 24 (550A0120) | LF | 423 | $186.18 |
| 124 | Storm sew CL A 1 30 (550A0140) | LF | 360 | $214.00 |
| 125 | Storm sew CL A 1 36 (550A0160) | LF | 429 | $219.35 |
| 126 | Storm sew CL A 2 12 (550A0340) | LF | 323 | $96.30 |
| 127 | Storm sew CL A 2 15 (550A0360) | LF | 326 | $102.72 |
| 128 | Storm sew CL A 2 18 (550A0380) | LF | 518 | $133.75 |
| 129 | Storm sew CL A 2 21 (550A0400) | LF | 156 | $166.92 |
| 130 | Storm sew CL A 2 24 (550A0410) | LF | 1,658 | $190.46 |
| 131 | Storm sew CL A 2 30 (550A0430) | LF | 376 | $219.35 |
| 132 | SS CL A 1 eqrs 18 (550A4000) | LF | 170 | $203.30 |
| 133 | SS CL A 1 eqrs 42 (550A4700) | LF | 216 | $428.00 |
| 134 | Storm sewer rem 8 (55100300) | LF | 211 | $48.15 |
| 135 | Storm sewer rem 12 (55100500) | LF | 55 | $58.85 |
| 136 | Storm sewer rem 15 (55100700) | LF | 168 | $74.90 |
| 137 | Storm sewer rem 18 (55100900) | LF | 403 | $85.60 |
| 138 | Storm sewer rem 24 (55101200) | LF | 468 | $90.95 |
| 139 | Water valves 8 (56105000) | EACH | 3 | $3,745.00 |
| 140 | Water valves 12 (56105200) | EACH | 19 | $6,420.00 |
| 141 | Tap valve & sleeve 6 (56108800) | EACH | 1 | $9,630.00 |
| 142 | Water valves adjust (56109210) | EACH | 2 | $749.00 |
| 143 | Fire hydnts to BE rem (56400500) | EACH | 7 | $1,284.00 |
| 144 | Fire hydrants (56400600) | EACH | 4 | $9,630.00 |
| 145 | Fire hyd W/aux V & VB (56400820) | EACH | 8 | $12,840 |
| 146 | Contr low-streng matl (59300100) | CY | 2,883.60 | $272.85 |
| 147 | Pipe underdr T 2 6 (60108206) | LF | 8,480 | $42.80 |
| 148 | Pipe underdrain 8 SP (60108300) | LF | 154 | $64.20 |
| 149 | Man TA 4 dia T1F OL (60218300) | EACH | 18 | $7,150.82 |
| 150 | Man TA 4 dia T1F CL (60218400) | EACH | 2 | $7,150.83 |
| 151 | Man TA 5 dia T1F OL (60221000) | EACH | 4 | $10,896 |
| 152 | Man TA 5 dia T1F CL (60221100) | EACH | 2 | $10,896 |
| 153 | Man TA 6 dia T1F CL (60223800) | EACH | 2 | $14,855 |
| 154 | Man TA 7 dia T1F OL (60224445) | EACH | 2 | $20,098 |
| 155 | Man TA 8 dia T1F OL (60224457) | EACH | 1 | $28,230 |
| 156 | Man TA 8 dia T1F CL (60224459) | EACH | 2 | $28,230 |
| 157 | Inlets TB T1F OL (60240210) | EACH | 3 | $4,689.82 |
| 158 | VV reconst (60266100) | EACH | 1 | $53,500 |
| 159 | Remov manholes (60500040) | EACH | 4 | $2,033.00 |
| 160 | Remov inlets (60500060) | EACH | 5 | $1,070.00 |
| 161 | Comb CC&G TB6.06 (60603500) | LF | 257 | $85.00 |
| 162 | Comb CC&G TB6.12 (60603800) | LF | 79 | $100.00 |
| 163 | Comb CC&G TB6.18 (60604400) | LF | 9,102 | $68.00 |
| 164 | Comb CC&G TY B-6.24 (60605000) | LF | 113 | $85.00 |
| 165 | Comb CC&G TM2.06 (60608250) | LF | 119 | $95.00 |
| 166 | Conc median surf 4 (60618300) | SF | 250 | $15.67 |
| 167 | Conc med TSB6.06 (60619200) | SF | 239 | $27.09 |
| 168 | Conc med TSB6.12 (60619600) | SF | 137 | $30.89 |
| 169 | Explor trench 52 (61100500) | LF | 50 | $107.00 |
| 170 | Misc concrete (61100605) | CY | 2 | $2,140.00 |
| 171 | Storm sew prot A 4 (61101005) | LF | 100 | $48.15 |
| 172 | Storm sew prot A 6 (61101007) | LF | 100 | $53.50 |
| 173 | Storm sew prot A 8 (61101009) | LF | 100 | $58.85 |
| 174 | Storm sew prot A 10 (61101011) | LF | 100 | $64.20 |
| 175 | FLD tile jun vault 2D (61133100) | EACH | 4 | $3,745.00 |
| 176 | FLD tile jun vault 3D (61133200) | EACH | 4 | $4,280.00 |
| 177 | Storm sewer spec 8 (61140000) | LF | 468 | $72.76 |
| 178 | Wov W fence 4 (66500105) | LF | 289 | $53.50 |
| 179 | Fur erect row markers (66600105) | EACH | 1 | $621.48 |
| 180 | Non SPL waste disposl (66900200) | CY | 1,638 | $40.00 |
| 181 | Soil disposal analy (66900530) | EACH | 4 | $1,070.00 |
| 182 | Reg sub P-const plan (66901001) | LS | 1 | $3,210.00 |
| 183 | Reg sub F con report (66901003) | LS | 1 | $1,070.00 |
| 184 | Reg sub mon (66901006) | CAL DAY | 9 | $963.00 |
| 185 | Engr field office B (67000500) | CAL MO | 20 | $3,000.00 |
| 186 | Mobilization (67100100) | LS | 1 | $725,000 |
| 187 | Changeable message SN (70107025) | CAL DAY | 60 | $160.50 |
| 188 | Temp PVT MK LTR & sym paint (70300211) | SF | 64 | $3.21 |
| 189 | Temp PVT MK line 4 - paint (70300221) | LF | 19,885 | $0.34 |
| 190 | Temp PVT MK line 24 - paint (70300281) | LF | 527 | $3.75 |
| 191 | Temp PVT MK LTR & sym T4 tape (70307100) | SF | 62 | $0.01 |
| 192 | Temp PVT MK L4 T4 tape (70307120) | LF | 20,561 | $0.01 |
| 193 | Temp PVT MK L24 T4 tape (70307210) | LF | 26 | $0.01 |
| 194 | Sign panel T1 (72000100) | SF | 133 | $55.92 |
| 195 | Sign panel T2 (72000200) | SF | 70 | $121.59 |
| 196 | Teles STL sin support (72800100) | LF | 231 | $34.24 |
| 197 | THPL PVT MK LTR & sym (78000100) | SF | 680 | $4.49 |
| 198 | THPL PVT MK line 6 (78000400) | LF | 15,875 | $1.10 |
| 199 | THPL PVT MK line 8 (78000500) | LF | 829 | $1.47 |
| 200 | THPL PVT MK line 12 (78000600) | LF | 699 | $2.20 |
| 201 | THPL PVT MK line 24 (78000650) | LF | 247 | $4.82 |
| 202 | Mod ureth PM LTR-sym (78009000) | SF | 63 | $21.40 |
| 203 | Mod ureth PM line 4 (78009004) | LF | 810 | $6.85 |
| 204 | PVT MKG rem grinding (78300201) | SF | 572 | $8.56 |
| 205 | PVT MKG rem WTR blast (78300202) | SF | 20 | $253.59 |
| 206 | Serv install TY A (80500100) | EACH | 1 | $5,421.56 |
| 207 | Undrgrd C galvs 2 (81028200) | LF | 80 | $107.19 |
| 208 | Undrgrd C PVC 2 (81028350) | LF | 270 | $45.61 |
| 209 | Undrgrd C PVC 3 (81028370) | LF | 68 | $65.82 |
| 210 | Undrgrd C PVC 4 (81028390) | LF | 333 | $75.92 |
| 211 | Handhole PCC (81400700) | EACH | 3 | $6,177.45 |
| 212 | DBL handhole PCC (81400720) | EACH | 1 | $9,800.52 |
| 213 | Fac T5 cab (85700300) | EACH | 1 | $40,879 |
| 214 | Uninter power sup STD (86200200) | EACH | 1 | $13,549 |
| 215 | Transceiver - fib opt (86400100) | EACH | 1 | $6,014.54 |
| 216 | Elcbl C signal 14 3C (87301225) | LF | 2,738 | $4.89 |
| 217 | Elcbl C signal 14 5C (87301245) | LF | 1,968 | $6.55 |
| 218 | Elcbl C signal 14 7C (87301255) | LF | 1,568 | $8.21 |
| 219 | Elcbl C serv 6 3C (87301815) | LF | 86 | $61.05 |
| 220 | Elcbl C egrdc 6 1C (87301900) | LF | 806 | $23.29 |
| 221 | TS post A 16 (87502700) | EACH | 6 | $3,095.24 |
| 222 | S maa & P 42 (87700250) | EACH | 1 | $24,512 |
| 223 | S maa & P 44 (87700260) | EACH | 2 | $25,212 |
| 224 | S maa & P 50 (87700290) | EACH | 1 | $31,891 |
| 225 | Conc FDN TY A (87800100) | LF | 18 | $535.96 |
| 226 | Conc FDN TY C (87800150) | LF | 3 | $860.15 |
| 227 | Conc FDN TY E 36D (87800415) | LF | 54 | $1,335.84 |
| 228 | Drill EX handhole (87900200) | EACH | 2 | $1,870.18 |
| 229 | SH LED 1F 3S mam (88030020) | EACH | 8 | $1,598.45 |
| 230 | SH LED 1F 3S BM (88030050) | EACH | 2 | $1,452.82 |
| 231 | SH LED 1F 4S BM (88030070) | EACH | 4 | $1,747.68 |
| 232 | SH LED 1F 4S mam (88030080) | EACH | 4 | $1,857.15 |
| 233 | Ped SH LED 2F BM CDT (88102747) | EACH | 8 | $2,482.71 |
| 234 | TS backplate louvered (88200110) | EACH | 18 | $559.10 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of August 1, 2025. Compiled by Mirage Metrics.