Haier Plumbing and Heating, Inc.: IDOT bid record
Haier Plumbing and Heating, Inc. submitted 13 bids on Illinois DOT contracts in the data, from 11 JUN 2021 to 13 JUN 2025, and was the low bidder on 8 of them (62%). When it was not low, its total sat a median +28% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $8,094,920
- Latest bid
- 13 JUN 2025
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 2 | 1 | 50% |
| 2023 | 6 | 4 | 67% |
| 2024 | 3 | 2 | 67% |
| 2025 | 2 | 1 | 50% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 08 | 11 | 7 | 64% |
| District 09 | 2 | 1 | 50% |
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Korte and Luitjohan Contractors, Inc. | 4 | 0 of 4 |
| Davinroy Mechanical Contractor, Inc. | 3 | 2 of 3 |
| Stutz Excavating, Inc. | 1 | 1 of 1 |
| RCS Construction, Inc. | 1 | 0 of 1 |
| Lake Contracting, Inc. | 1 | 1 of 1 |
| Electrico, Inc. | 1 | 0 of 1 |
| Hank's Excavating & Landscaping, Inc. | 1 | 1 of 1 |
| CSD Environmental Services, Inc. | 1 | 0 of 1 |
| Layne Christensen Company | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 13 JUN 2025 | 76F82 | District 08 | Section 82-4PS-4,(Z-1)PS-3,29PS-3,27PS-1 | 1 of 1 | $614,950 | Low |
| 13 JUN 2025 | 76U34 | District 08 | Section 29PS-3 | 2 of 3 | $152,000 | +100% |
| 14 JUN 2024 | 76T38 | District 08 | Section DIST | 1 of 1 | $135,590 | Low |
| 14 JUN 2024 | 76T47 | District 08 | Section 82-1-I | 2 of 4 | $179,455 | +44% |
| 26 APR 2024 | 76T64 | District 08 | Section 82-1-PS-8 | 1 of 2 | $590,000 | Low, 1.0% under the second |
| 16 JUN 2023 | 76L48 | District 08 | Section 60-7PS-2 | 2 of 3 | $187,812 | +3.0% |
| 16 JUN 2023 | 76P08 | District 08 | Section (Z-1)PS-2,29PS-2 | 1 of 1 | $2,785,320 | Low |
| 16 JUN 2023 | 76T12 | District 08 | Section 82-1-PS-6 | 1 of 3 | $346,610 | Low, 2.0% under the second |
| 10 MAR 2023 | 76R51 | District 08 | Section DIST | 1 of 2 | $180,000 | Low, 31% under the second |
| 20 JAN 2023 | 78958 | District 09 | Section (28-5)PS-1 | 1 of 1 | $3,343,253 | Low |
| 20 JAN 2023 | 78962 | District 09 | Section (28-2-1)(I-2)RA | 2 of 2 | $442,675 | +2.0% |
| 11 JUN 2021 | 76M36 | District 08 | Section 60-8PS-2 | 2 of 3 | $69,959 | +28% |
| 11 JUN 2021 | 76N41 | District 08 | Section (Z-1)PS-1,29PS-1 | 1 of 1 | $99,197 | Low |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.