Electrico, Inc. submitted 46 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 12 JUN 2026, and was the low bidder on 35 of them (76%). When it was not low, its total sat a median +7.0% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $27,824,152
- Latest bid
- 12 JUN 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 11 | 4 | 36% |
| 2022 | 11 | 10 | 91% |
| 2023 | 7 | 6 | 86% |
| 2024 | 7 | 6 | 86% |
| 2025 | 5 | 5 | 100% |
| 2026 | 5 | 4 | 80% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 08 | 45 | 34 | 76% |
| District 09 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Apprent electrician | X0327496 | HR | 9 | 9 (100%) | $0.01 | $0.01 |
| Remov EX conc FDN | 89502385 | EACH | 6 | 6 (100%) | $300.00 | $635.00 |
| Arrowboard trailr MNT | X0327500 | HR | 6 | 6 (100%) | $0.01 | $0.01 |
| Main EX TR sig instal | 85000200 | EACH | 10 | 5 (50%) | $575.00 | $2,600.00 |
| Reloc sign panel T1 | 72400710 | SF | 6 | 5 (83%) | $22.50 | $25.00 |
| Trainees TPG | Z0076604 | HR | 5 | 5 (100%) | $15.00 | $15.00 |
| SH LED 1F 3S mam | 88030020 | EACH | 5 | 5 (100%) | $600.00 | $959.80 |
| TS backplate ret-refl | 88200510 | EACH | 5 | 5 (100%) | $125.00 | $302.01 |
| Fac T4 cab | 85700200 | EACH | 7 | 4 (57%) | $18,500 | $26,500 |
| Rem EX TR cont & cab | X8950105 | EACH | 7 | 4 (57%) | $250.00 | $1,005.00 |
| Soil disposal analy | 66900530 | EACH | 7 | 3 (43%) | $1,450.00 | $1,470.00 |
| Elcbl C signal 14 5C | 87301245 | LF | 7 | 3 (43%) | $2.90 | $2.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Wissehr Electric, Inc. | 26 | 7 of 26 |
| Gerstner Electric, Inc. | 10 | 3 of 10 |
| J. Ranck Electric, Inc. | 2 | 0 of 2 |
| Pyramid Electrical Contractors, Inc. | 1 | 0 of 1 |
| F. W. Electric, Inc. | 1 | 0 of 1 |
| Haier Plumbing and Heating, Inc. | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 JUN 2026 | 76U96 | District 08 | Section DIST | 1 of 1 | $2,003,468 | Low |
| 12 JUN 2026 | 76U98 | District 08 | Section DIST | 1 of 1 | $573,010 | Low |
| 12 JUN 2026 | 76V13 | District 08 | Section DIST | 2 of 2 | $3,025,900 | +64% |
| 24 APR 2026 | 76U53 | District 08 | Section DIST | 1 of 1 | $2,846,040 | Low |
| 16 JAN 2026 | 76U89 | District 08 | Section DIST | 1 of 1 | $243,879 | Low |
| 01 AUG 2025 | 76R28 | District 08 | Section DIST | 1 of 1 | $1,935,305 | Low |
| 01 AUG 2025 | 76R61 | District 08 | Section DIST | 1 of 1 | $558,010 | Low |
| 01 AUG 2025 | 76T74 | District 08 | Section 60-7L,60-6L | 1 of 3 | $1,999,091 | Low, 22% under the second |
| 25 APR 2025 | 76T79 | District 08 | Section D8 | 1 of 1 | $1,923,315 | Low |
| 17 JAN 2025 | 76T49 | District 08 | Section DIST | 1 of 2 | $1,030,879 | Low, 10% under the second |
| 20 SEP 2024 | 76T72 | District 08 | Section DIST | 1 of 1 | $183,003 | Low |
| 14 JUN 2024 | 76T62 | District 08 | Section DIST | 1 of 1 | $1,627,506 | Low |
| 14 JUN 2024 | 76T63 | District 08 | Section DIST | 1 of 1 | $421,036 | Low |
| 26 APR 2024 | 76T45 | District 08 | Section DIST | 2 of 3 | $370,643 | +7.0% |
| 26 APR 2024 | 76T53 | District 08 | Section DIST | 1 of 3 | $263,300 | Low, 4.0% under the second |
| 26 APR 2024 | 76T55 | District 08 | Section DIST | 1 of 1 | $1,753,628 | Low |
| 08 MAR 2024 | 76R84 | District 08 | Section D8 | 1 of 1 | $546,454 | Low |
| 22 SEP 2023 | 76R55 | District 08 | Section DIST | 1 of 1 | $169,753 | Low |
| 16 JUN 2023 | 76R00 | District 08 | Section 82-2L-1 | 1 of 1 | $932,109 | Low |
| 16 JUN 2023 | 76R01 | District 08 | Section 82-4L-1 | 1 of 1 | $862,601 | Low |
| 16 JUN 2023 | 76R52 | District 08 | Section DIST | 1 of 1 | $1,529,701 | Low |
| 16 JUN 2023 | 76R54 | District 08 | Section DIST | 1 of 1 | $428,536 | Low |
| 10 MAR 2023 | 76R51 | District 08 | Section DIST | 2 of 2 | $236,433 | +31% |
| 10 MAR 2023 | 76R88 | District 08 | Section DIST | 1 of 1 | $1,181,335 | Low |
| 23 SEP 2022 | 76P97 | District 08 | Section DIST | 1 of 2 | $48,508 | Low, 30% under the second |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.