Duce Construction Company: IDOT bid record
Duce Construction Company submitted 13 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 31 JUL 2026, and was the low bidder on 2 of them (15%). When it was not low, its total sat a median +23% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $1,728,500
- Latest bid
- 31 JUL 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 4 | 0 | 0% |
| 2022 | 3 | 1 | 33% |
| 2023 | 4 | 1 | 25% |
| 2026 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Perimeter eros bar | 28000400 | LF | 10 | 6 (60%) | $2.88 | $3.50 |
| Earth excavation | 20200100 | CY | 8 | 4 (50%) | $45.00 | $48.00 |
| Comb curb gutter rem | 44000500 | LF | 8 | 4 (50%) | $19.88 | $11.61 |
| Temp eros contr seed | 28000250 | LB | 8 | 4 (50%) | $5.00 | $5.00 |
| Sidewalk rem | 44000600 | SF | 10 | 3 (30%) | $3.00 | $3.00 |
| Inlet & pipe protect | 28000500 | EACH | 7 | 3 (43%) | $173.00 | $200.00 |
| Nitrogen fert nutr | 25000400 | LB | 8 | 2 (25%) | $2.75 | $3.00 |
| Potassium fert nutr | 25000600 | LB | 8 | 2 (25%) | $2.75 | $3.00 |
| Phosphorus fert nutr | 25000500 | LB | 8 | 2 (25%) | $2.75 | $3.00 |
| Inlet filters | 28000510 | EACH | 5 | 2 (40%) | $210.00 | $180.20 |
| Comb CC&G TB6.12 | 60603800 | LF | 5 | 2 (40%) | $74.00 | $42.50 |
| Furnished excavation | 20400800 | CY | 5 | 2 (40%) | $56.00 | $36.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Stark Excavating, Inc. | 10 | 8 of 10 |
| Feutz Contractors, Inc. | 6 | 4 of 6 |
| Cross Construction, Inc. | 3 | 1 of 3 |
| A & R Mechanical Service, Inc. | 2 | 1 of 2 |
| Big O Services, LLC | 2 | 1 of 2 |
| White Construction LLC | 2 | 0 of 2 |
| Kinney Contractors, Inc. | 2 | 2 of 2 |
| G. M. Sipes Construction, Inc. | 2 | 0 of 2 |
| Mid-Illinois Concrete and Excavation, Inc. | 1 | 0 of 1 |
| Otto Baum Company, Inc. | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 31 JUL 2026 | 70G29 | District 05 | Section RA | 2 of 3 | $4,494,900 | +40% |
| 16 JAN 2026 | 91642 | District 05 | City Of Champaign, section 19-00314-00-PV | 4 of 4 | $11,333,000 | +34% |
| 16 JUN 2023 | 70581 | District 05 | Section 4BR | 1 of 2 | $1,337,000 | Low, 10% under the second |
| 28 APR 2023 | 70G22 | District 05 | Section (32)I | 3 of 4 | $337,297 | +4.0% |
| 28 APR 2023 | 91629 | District 05 | Bement, section 22-00103-00-SW | 2 of 2 | $198,750 | +28% |
| 20 JAN 2023 | 91616 | District 05 | Project Number: Pl10-830 / /, section 22-P4003-00-BT | 2 of 3 | $529,670 | +23% |
| 29 APR 2022 | 91614 | District 05 | Project Number: Ba04-565 / /, section 20-00115-00-BT | 1 of 4 | $391,500 | Low, 1.0% under the second |
| 11 MAR 2022 | 70F60 | District 05 | Section D5 | 2 of 4 | $236,954 | +4.0% |
| 11 MAR 2022 | 91615 | District 05 | Project Number: 7Whj-314 / /, section 17-F3000-02-BT | 3 of 3 | $1,382,000 | +47% |
| 05 NOV 2021 | 70905 | District 05 | Section 121BR | 3 of 4 | $1,487,553 | +11% |
| 05 NOV 2021 | 91613 | District 05 | Savoy, section 20-00008-00-BT | 3 of 5 | $1,327,300 | +12% |
| 11 JUN 2021 | 91605 | District 05 | Project Number: 9W09-286 / /, section 08-F3000-04-BT | 3 of 3 | $406,840 | +44% |
| 15 JAN 2021 | 91586 | District 05 | Project Number: 8Uru-930 / /, section 18-00213-00-PV | 4 of 6 | $563,800 | +21% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.