Superior Road Striping, Inc.: IDOT bid record

Superior Road Striping, Inc. submitted 17 bids on Illinois DOT contracts in the data, from 11 JUN 2021 to 17 JAN 2025, and was the low bidder on 9 of them (53%). When it was not low, its total sat a median +5.0% above the low bid.

Owner
Illinois DOT
Low bid volume
$14,291,176
Latest bid
17 JAN 2025
Data through
18 SEP 2026
17Bids
9Low bids
53Win rate, percent
+5.0%Median gap to the low bid when not low, 4 bids

By year

YearBidsLow bidsWin rate
202122100%
20224250%
20235480%
20245120%
2025100%
Superior Road Striping, Inc., IDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Raised refl pavt MKR78100100EACH76 (86%)$27.00$48.00
Raised ref PVT MK rem78300200EACH75 (71%)$17.00$15.00
Replacement reflector78100300EACH75 (71%)$8.50$19.00
Superior Road Striping, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
RoadSafe Traffic Systems, Inc.82 of 8
Precision Pavement Markings Inc.53 of 5
Marking Specialists Corporation40 of 4
William Dunbar Construction LLC.44 of 4
The Final Connection, Inc.44 of 4
MYS, Incorporated44 of 4
Orlando Lawn Service, Inc.44 of 4
Prime Hydro Demolition Inc.44 of 4
A. C. Pavement Striping Co.30 of 3
Smith Maintenance Company22 of 2
Superior Road Striping, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
17 JAN 202561L03District 01Project Number: Njtk-202 / /, section 22-00557-00-SP2 of 3$547,7650.0%
14 JUN 202446631District 01Section D1 of 3$4,518,200Low, 6.0% under the second
08 MAR 202462U96District 01Section FAI6 of 6$527,040+309%
08 MAR 202462U98District 01Section FAI6 of 6$480,000+309%
08 MAR 202462V03District 01Section FAI7 of 7$355,200+309%
08 MAR 202462W07District 01Section FAI7 of 7$576,000+309%
17 NOV 202346606District 01Section D2 of 2$4,600,600+10%
16 JUN 202346624District 01Section D1 of 1$3,228,282Low
16 JUN 202346625District 01Section D1 of 1$851,082Low
16 JUN 202346626District 01Section D1 of 2$1,279,775Low, 2.0% under the second
16 JUN 202346627District 01Section D1 of 1$510,312Low
23 SEP 202246604District 01Section D1 of 2$1,669,973Low, 8.0% under the second
23 SEP 202246605District 01Section D2 of 4$507,100+1.0%
17 JUN 202246594District 01Section D1 of 2$1,443,259Low, 56% under the second
17 JUN 202246595District 01Section D3 of 5$3,581,600+41%
11 JUN 202146571District 01Section D-11 of 4$282,443Low, 76% under the second
11 JUN 202146573District 01Section D11 of 4$507,850Low, 77% under the second
Superior Road Striping, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy