IDOT contract 66T09 bid tabulation

Section (WS)PP-2. Let by Illinois DOT on June 12, 2026, Iroquois, District 03. 4 bids received; low bid $388,737 by Iroquois Paving Corporation.

Owner
Illinois DOT
Letting
12 JUN 2026
Pay items
22
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Iroquois Paving Corporation$388,737Low
2G. M. Sipes Construction, Inc.$438,215+13%
3SNC Construction, Inc.$457,590+18%
4Beniach Construction Co., Inc.$542,666+40%
IDOT contract 66T09: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Iroquois Paving Corporation2. G. M. Sipes Construction, Inc.3. SNC Construction, Inc.4. Beniach Construction Co., Inc.
1Traf cont & prot SPL (X7010216)LS1$5,000.00$0.01$7,114.26$3,500.00
2Dowel bar assembly (Z0017099)EACH10$0.01$100.00$205.24$225.00
3Welded wire reinf (44200050)SY1,722$0.01$0.01$13.86$20.00
4CL B patch T2 10 (44200970)SY752$190.00$215.00$157.82$233.00
5CL B patch T3 10 (44200974)SY741$190.00$210.00$158.03$223.00
6CL B patch T4 10 (44200976)SY229$200.00$210.00$173.98$212.00
7Dowel bars 1 1/2 (44201299)EACH1,554$0.01$10.00$26.68$17.00
8Saw cuts (44213200)LF5,452$0.01$0.01$2.82$0.01
9Tie bars 3/4 (44213204)EACH90$0.01$10.00$12.82$12.50
10Agg wedge SHLD type B (48102100)TON312$39.75$20.00$77.23$80.00
11Mobilization (67100100)LS1$10,000$20,000$31,099$26,600
12Epoxy PVT MK LTR-sym (78005100)SF316$14.25$11.00$11.30$10.85
13Epoxy PVT MK line 4 (78005110)LF2,133$1.80$1.70$2.23$2.14
14Epoxy PVT MK line 8 (78005140)LF1,322$3.25$3.00$4.47$4.29
15Epoxy PVT MK line 12 (78005150)LF238$4.75$4.50$5.65$5.42
16Epoxy PVT MK line 24 (78005180)LF60$8.50$8.00$10.17$9.76
17GRV RCSD PM LTR & sym (78011000)SF316$10.00$9.50$9.04$8.68
18GRV RCSD PVT MRKG 5 (78011025)LF2,133$1.60$1.50$2.14$2.06
19GRV RCSD PVT MRKG 9 (78011045)LF1,322$2.00$1.90$3.76$3.60
20GRV RCSD PVT MRKG 13 (78011065)LF242$2.60$2.50$4.52$4.34
21GRV RCSD PVT MRKG 25 (78011125)LF60$4.75$4.50$7.91$7.59
22PVT MKG rem WTR blast (78300202)SF1,637$4.50$4.20$3.42$3.28
IDOT contract 66T09: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy