IDOT contract 66R57 bid tabulation
Section (116)PP. Let by Illinois DOT on June 13, 2025, Ford, District 03. 5 bids received; low bid $479,131 by G. M. Sipes Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 8
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | G. M. Sipes Construction, Inc. | $479,131 | Low |
| 2 | A & R Mechanical Service, Inc. | $520,414 | +9.0% |
| 3 | Beniach Construction Co., Inc. | $576,708 | +20% |
| 4 | Kinney Contractors, Inc. | $650,614 | +36% |
| 5 | SNC Construction, Inc. | $811,262 | +69% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. G. M. Sipes Construction, Inc. | 2. A & R Mechanical Service, Inc. | 3. Beniach Construction Co., Inc. | 4. Kinney Contractors, Inc. | 5. SNC Construction, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Temp info signing (X7200061) | SF | 42 | $0.01 | $36.75 | $50.00 | $30.00 | $56.01 |
| 2 | Welded wire reinf (44200050) | SY | 255 | $5.00 | $14.08 | $17.00 | $17.00 | $21.38 |
| 3 | CL B patch T2 12 (44200994) | SY | 1,407 | $270.00 | $227.75 | $305.00 | $269.00 | $368.12 |
| 4 | CL B patch T3 12 (44200998) | SY | 255 | $270.00 | $208.08 | $308.00 | $265.00 | $343.53 |
| 5 | Dowel bars 1 1/4 (44201298) | EACH | 3,344 | $0.01 | $17.71 | $14.00 | $24.00 | $22.38 |
| 6 | Saw cuts (44213200) | LF | 8,235 | $0.01 | $2.05 | $0.01 | $3.00 | $4.36 |
| 7 | Mobilization (67100100) | LS | 1 | $23,000 | $9,365.13 | $12,000 | $34,000 | $44,687 |
| 8 | Traf cont-prot 701336 (70100600) | LS | 1 | $6,000.00 | $56,306 | $3,700.00 | $60,000 | $42,482 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.