Central Sweeping of Illinois, LLC: IDOT bid record
Central Sweeping of Illinois, LLC submitted 13 bids on Illinois DOT contracts in the data, from 19 JAN 2024 to 24 APR 2026, and was the low bidder on 11 of them (85%).
- Owner
- Illinois DOT
- Low bid volume
- $32,852,746
- Latest bid
- 24 APR 2026
- Data through
- 18 SEP 2026
13Bids
11Low bids
85Win rate, percent
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 5 | 5 | 100% |
| 2025 | 7 | 6 | 86% |
| 2026 | 1 | 0 | 0% |
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. | 2 | 0 of 2 |
| RoadSafe Traffic Systems, Inc. | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 24 APR 2026 | 80C91 | District 01 | Section 2025-2128-SWP(EXPNT) | 2 of 2 | $8,740,000 | +48% |
| 07 NOV 2025 | 80B69 | District 01 | 2 of 2 | $4,623,115 | 0.0% | |
| 07 NOV 2025 | 80B70 | District 01 | 1 of 1 | $2,013,220 | Low | |
| 07 NOV 2025 | 80B71 | District 01 | 1 of 1 | $4,010,755 | Low | |
| 07 NOV 2025 | 80B72 | District 01 | 1 of 1 | $1,303,855 | Low | |
| 07 MAR 2025 | 62W55 | District 01 | Section 2023-SWP-006(AM) | 1 of 1 | $11,515,816 | Low |
| 07 MAR 2025 | 62X90 | District 01 | Section 2024-SWP-008(VAR) | 1 of 2 | $2,728,800 | Low, 28% under the second |
| 07 MAR 2025 | 62X91 | District 01 | Section 2024-SWP-009(VAR) | 1 of 1 | $1,982,600 | Low |
| 08 MAR 2024 | 62U68 | District 01 | Section 2022 | 1 of 1 | $1,476,500 | Low |
| 08 MAR 2024 | 62W19 | District 01 | Section 2023-SWP-001-(DP) | 1 of 1 | $1,601,000 | Low |
| 08 MAR 2024 | 62W35 | District 01 | Section 2023-SWP-002(W) | 1 of 1 | $1,326,875 | Low |
| 19 JAN 2024 | 62W36 | District 01 | Section 2023-SWP-003(NC) | 1 of 2 | $2,653,175 | Low, 105% under the second |
| 19 JAN 2024 | 62W37 | District 01 | Section 2023-SWP-004(SC) | 1 of 1 | $2,240,150 | Low |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.