IDOT contract 61K87 bid tabulation

Maywood, section 19-00140-00-FP. Let by Illinois DOT on January 17, 2025, Cook, District 01. 8 bids received; low bid $4,773,174 by Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc..

Owner
Illinois DOT
Letting
17 JAN 2025
Pay items
123
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc.$4,773,174Low
2Lindahl Brothers, Inc.$5,110,354+7.0%
3Acqua Contractors Corp$5,150,000+8.0%
4K-Five Construction Corporation$5,210,355+9.0%
5Martam Construction Incorporated$5,400,070+13%
6R. W. Dunteman Company$5,742,558+20%
7Plote Construction, Inc.$6,081,000+27%
8Acura Inc.$6,806,994+43%
IDOT contract 61K87: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc.2. Lindahl Brothers, Inc.3. Acqua Contractors Corp4. K-Five Construction Corporation5. Martam Construction Incorporated6. R. W. Dunteman Company
1Prun safety/equip CLR (K1004595)LS1$6,400.00$3,100.00$6,781.00$3,300.00$12,480$6,400.00
2Temporary access walk (XX002948)EACH40$300.00$50.00$276.00$179.00$292.20$136.99
3San sew service 6 (XX003803)LF380$84.00$65.00$165.00$65.00$190.00$65.00
4Restrained joint 8" (XX006227)EACH90$155.00$1.00$45.00$1.00$104.93$1.00
5Restrained joint 6" (XX006228)EACH25$122.00$1.00$40.00$1.00$103.45$1.00
6SS DI T1 10 (XX006281)LF625$145.00$155.00$160.00$155.00$155.09$155.00
7PVC CS pipe repl 10" (XX006448)LF150$185.00$325.00$245.00$325.00$280.20$325.00
8PVC CS pipe repl 12" (XX006449)LF350$193.00$125.00$250.00$125.00$291.54$125.00
9PVC CS pipe repl 15" (XX006450)LF30$234.00$25.00$300.00$25.00$382.58$25.00
1010" X 6" PVC sew con (XX006451)EACH7$1,575.00$100.00$2,100.00$100.00$3,377.78$100.00
1112 X 6 PVC sew con SP (XX006816)EACH26$2,045.00$150.00$2,200.00$150.00$3,690.68$150.00
12E con to EX LT sys (XX006834)EACH2$1,000.00$609.46$645.72$966.53$1,064.10$550.00
13EL conn EX LT cabinet (XX009695)EACH2$1,367.30$763.81$809.00$1,367.30$1,505.32$850.00
14RD CB 4 dia T1F OL (XX009696)EACH18$3,900.00$8,500.00$4,000.00$8,500.00$5,416.17$9,500.00
15RD man ST 4DIA T1F CL (XX009697)EACH7$4,500.00$8,500.00$5,100.00$8,500.00$4,900.22$9,500.00
16RD man ST 6DIA T1F CL (XX009698)EACH4$12,350$25,000$14,500$25,000$9,928.74$30,000
17RD man SN 4DIA T1F CL (XX009699)EACH8$7,200.00$8,500.00$7,500.00$8,500.00$5,732.40$9,500.00
18Pres test & disinfect (X1200230)LS1$7,650.00$7,500.00$2,649.00$7,500.00$8,840.00$7,500.00
19GR stab geosynthetic (X2100106)SY8,500$7.15$5.13$5.14$6.45$7.28$5.47
20Explor trench SPL (X2130010)LF150$40.00$15.00$385.40$15.00$78.59$15.00
21Temp access- priv ent (X4021000)EACH16$935.00$100.00$373.00$898.96$431.91$284.69
22Temp access- road (X4023000)EACH4$2,700.00$369.75$373.00$0.01$863.82$348.68
23Detectable warn SPL (X4240800)SF400$40.00$45.00$32.00$40.00$31.20$40.25
24D I WTR MN fittings (X5610004)LB3,000$6.80$0.01$3.00$0.01$9.73$0.01
25WM line stop 6 (X5610746)EACH7$8,200.00$2,000.00$6,000.00$2,000.00$5,835.15$2,000.00
26WM line stop 8 (X5610748)EACH8$8,400.00$3,000.00$6,500.00$3,000.00$6,355.16$3,000.00
27Water serv LN 1 bored (X5620096)EACH32$3,700.00$4,500.00$4,000.00$4,500.00$4,746.80$4,500.00
28Water serv LN 2 bored (X5620101)EACH14$5,400.00$8,000.00$7,000.00$8,000.00$7,114.73$8,000.00
29Cut & cap EX 6 WM (X5630006)EACH4$2,100.00$3,500.00$2,500.00$3,500.00$1,443.18$3,500.00
30Cut & cap EX 8 WM (X5630008)EACH2$2,225.00$3,500.00$2,500.00$3,500.00$1,524.72$3,500.00
31Conn to EX W main 6 (X5630706)EACH1$4,300.00$8,500.00$7,500.00$8,500.00$3,694.51$8,500.00
32Conn to EX W main 8 (X5630708)EACH5$4,500.00$8,500.00$8,500.00$8,500.00$3,798.67$8,500.00
33Connect EX manhole (X6020399)EACH2$4,500.00$1,000.00$2,500.00$1,000.00$1,873.30$1,000.00
34Rem EX valve & vault (X6024132)EACH7$875.00$250.00$300.00$250.00$1,256.36$250.00
35Comb CC&G TB6.12 SPL (X6064200)LF4,900$39.00$37.90$46.85$33.00$44.72$37.79
36Traf cont & prot SPL (X7010216)LS1$329,000$50,000$311,447$316,325$364,290$323,674
37Rem RE-erect EX sign (X7240600)EACH10$160.00$300.00$318.00$350.00$520.00$500.00
38Stab constr entrance (Z0013797)SY200$25.00$35.31$25.00$9.00$21.76$23.84
39Drainage STR removed (Z0018700)EACH48$700.00$250.00$300.00$250.00$418.79$250.00
40Dust control watering (Z0019600)UNIT100$35.00$143.70$600.00$100.00$87.97$68.02
41Temp info signing (Z0030850)SF225$15.00$20.00$21.00$16.00$16.64$30.00
42Maint lighting sys (Z0033028)CAL MO8$1,025.00$1,218.93$1,300.00$1,021.53$1,124.65$1,250.00
43RR track remov (Z0048900)LF2,800$10.00$26.00$5.00$43.75$1.00$43.10
44Temp pavement (Z0062456)SY600$35.00$25.00$30.00$25.00$29.42$65.00
45Steel casings 16 (Z0067500)LF126$325.00$300.00$100.00$300.00$326.32$300.00
46Trainees (Z0076600)HR1,000$0.80$0.80$0.80$0.80$0.80$0.80
47Trainees TPG (Z0076604)HR1,000$15.00$15.00$15.00$15.00$15.00$15.00
48Tree trunk protection (20101100)EACH40$220.00$220.00$233.00$95.00$104.00$220.00
49Tree root pruning (20101200)EACH40$120.00$96.00$127.00$100.00$156.00$120.00
50Earth excavation (20200100)CY4,600$0.01$49.00$28.00$54.45$50.69$42.77
51Rem & disp uns matl (20201200)CY1,650$49.00$49.00$30.00$27.00$47.54$51.55
52Trench backfill (20800150)CY3,300$0.01$1.00$35.00$1.00$74.50$1.00
53Geotech fab F/GR stab (21001000)SY2,200$2.50$1.25$1.95$5.00$3.19$3.98
54Topsoil F & P 4 (21101615)SY4,800$9.00$6.00$6.35$5.98$6.24$6.00
55Nitrogen fert nutr (25000400)LB60$5.00$3.00$5.30$5.00$3.12$3.00
56Phosphorus fert nutr (25000500)LB60$5.00$3.00$5.30$5.00$3.12$3.00
57Potassium fert nutr (25000600)LB60$5.00$3.00$5.30$5.00$3.12$3.00
58Sodding (25200100)SY4,800$13.50$10.00$14.30$13.50$10.40$10.00
59Supple watering (25200200)UNIT2,000$0.01$0.01$0.01$0.01$0.01$0.01
60Inlet filters (28000510)EACH41$350.00$166.00$183.00$165.00$172.64$166.00
61Agg subgrade improve (30300001)CY1,650$66.00$52.00$60.00$22.00$54.00$51.97
62Agg subgrade impr 12 (30300112)SY8,500$24.00$24.00$16.00$20.00$16.00$17.01
63Agg base cse B 9 (35102100)SY600$18.00$46.54$25.00$40.00$15.00$33.06
64Aggregate-temp access (40201000)TON500$18.00$35.00$21.00$14.35$30.00$52.93
65Bit matls tack CT (40600290)LB4,000$0.01$0.01$0.01$0.01$0.01$1.40
66Long joint sealant (40600370)LF5,400$5.83$4.99$4.24$5.61$6.06$6.12
67HMA surf rem butt JT (40600982)SY150$34.95$20.00$1.06$5.00$36.35$29.90
68HMA BC IL-19.0 N50 (40603080)TON3,400$100.62$87.00$78.51$76.00$104.64$88.30
69HMA SC IL-9.5 D N50 (40604060)TON1,100$113.40$89.00$90.39$87.00$117.94$100.34
70Incidental HMA surf (40800050)TON100$157.10$215.00$238.39$250.00$163.38$240.34
71PCC PVT 8 (42000300)SY60$110.00$110.00$103.00$110.00$100.20$110.60
72Protective coat (42001300)SY5,000$0.01$1.75$0.53$0.01$0.52$1.55
73PCC driveway pavt 7 (42300300)SY800$98.00$85.00$102.00$82.00$92.40$73.41
74PC conc sidewalk 5 (42400200)SF29,000$10.50$9.00$8.32$8.95$7.75$10.44
75Detectable warnings (42400800)SF30$40.00$35.00$32.00$40.00$31.20$45.00
76Pavement rem (44000100)SY8,500$14.15$20.00$9.00$13.26$17.15$14.47
77Drive pavement rem (44000200)SY1,050$13.00$16.75$18.00$5.00$15.10$37.24
78Comb curb gutter rem (44000500)LF4,900$5.00$7.60$10.00$12.23$5.80$13.14
79Sidewalk rem (44000600)SF29,000$1.25$1.95$2.00$2.22$2.20$3.11
80SS RG CL A 3 24 (550A2760)LF80$235.00$185.00$225.00$185.00$175.65$185.00
81Storm sew CL B 2 10 (550B0330)LF100$185.00$95.00$164.00$95.00$97.92$125.00
82Storm sew CL B 2 12 (550B0340)LF1,425$140.00$120.00$140.00$120.00$88.70$135.00
83D I water main 6 (56103000)LF80$141.00$170.00$160.00$170.00$138.08$170.00
84D I water main 8 (56103100)LF2,550$172.00$185.00$147.00$185.00$142.04$195.00
85Water valves 8 (56105000)EACH8$3,150.00$7,500.00$2,935.00$7,500.00$3,121.26$8,500.00
86Water serv line 1 (56200300)LF36$275.00$3,500.00$2,335.00$3,500.00$400.00$3,500.00
87Water serv line 2 (56200700)LF11$350.00$6,250.00$4,905.00$6,250.00$425.00$6,250.00
88Adj san sewer 8 less (56300100)LF600$84.00$5.00$150.00$5.00$80.00$5.00
89Fire hydnts to BE rem (56400500)EACH7$1,300.00$500.00$500.00$500.00$1,377.51$500.00
90Fire hyd W/aux V & VB (56400820)EACH7$8,300.00$12,500$8,000.00$12,500$9,741.68$12,500
91Inlets TA T1F OL (60234200)EACH14$2,250.00$3,000.00$1,826.00$3,000.00$1,560.17$3,000.00
92VV TA 4 dia T1F CL (60248700)EACH8$3,500.00$7,500.00$3,795.00$7,500.00$3,933.93$7,500.00
93Man adjust (60255500)EACH3$800.00$1,000.00$1,750.00$1,000.00$628.19$1,000.00
94Man reconst (60257900)EACH5$1,550.00$3,000.00$2,000.00$3,000.00$1,380.98$3,000.00
95FR & lids T1 CL (60406100)EACH6$675.00$650.00$400.00$650.00$605.39$650.00
96Conc curb TB (60600605)LF150$45.00$45.00$33.50$45.00$30.11$39.71
97Non SPL waste disposl (66900200)CY1,250$0.01$105.00$95.00$84.72$94.90$106.92
98Soil disposal analy (66900530)EACH8$800.00$995.00$1,250.00$1,170.00$1,341.60$1,465.00
99Reg sub P-const plan (66901001)LS1$2,500.00$3,000.00$3,700.00$3,400.00$5,096.00$2,700.00
100Reg sub F con report (66901003)LS1$1,500.00$1,500.00$530.00$500.00$1,040.00$2,500.00
101Reg sub mon (66901006)CAL DAY40$420.00$720.00$745.00$700.00$1,196.00$998.00
102Mobilization (67100100)LS1$275,000$300,000$312,000$313,186$324,004$326,994
103Changeable message SN (70107025)CAL DAY210$28.00$40.00$42.00$30.00$31.20$30.00
104Short term pavt mking (70300100)LF2,500$1.00$2.50$1.06$1.11$2.00$1.75
105SHRT TRM pavt MK rem (70300150)SF1,500$1.00$2.00$2.12$2.22$2.00$2.25
106Temp PVT MK LTR & sym paint (70300211)SF100$1.50$1.35$1.43$1.00$1.04$3.00
107Temp PVT MK line 4 - paint (70300221)LF2,500$0.50$0.45$0.48$0.30$0.31$0.50
108Temp PVT MK line 6 - paint (70300241)LF500$0.75$0.70$0.74$1.00$1.04$0.75
109Temp PVT MK line 12 - paint (70300261)LF250$1.00$1.35$1.40$2.00$2.08$1.50
110Temp PVT MK line 24 - paint (70300281)LF200$2.00$2.70$2.86$3.00$3.12$3.00
111Sign panel T1 (72000100)SF325$38.00$25.00$26.50$25.00$26.00$39.50
112Teles STL sin support (72800100)LF480$11.00$15.00$16.00$17.00$17.68$19.50
113Metal post TY B (72900200)LF215$13.00$14.00$15.00$17.00$17.68$12.50
114THPL PVT MK line 4 (78000200)LF4,100$0.75$0.75$1.06$0.75$1.46$0.85
115THPL PVT MK line 6 (78000400)LF180$1.45$1.45$3.75$1.45$1.87$1.50
116THPL PVT MK line 12 (78000600)LF1,050$2.85$2.85$4.10$2.85$3.12$2.95
117THPL PVT MK line 24 (78000650)LF200$5.50$5.50$6.62$5.50$5.72$5.75
118PVT MKG rem WTR blast (78300202)SF500$4.50$6.00$6.36$6.50$6.76$5.50
119Undrgrd C galvs 2 (81028200)LF625$31.81$61.42$65.00$31.81$35.02$72.00
120Handhole (81400100)EACH2$3,781.79$2,784.39$2,950.00$3,781.79$4,163.54$5,500.00
121UD 2#6 #8G xlpuse 1 (81603040)LF4,600$18.15$18.23$19.31$18.15$19.98$36.00
122Reloc EX LT unit (84400105)EACH2$939.03$1,778.06$1,884.00$939.03$1,033.82$4,800.00
123Remov EX handhole (89502380)EACH2$1,166.91$667.65$707.00$1,166.91$1,284.70$500.00
IDOT contract 61K87: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way