IDOT contract 61M08 bid tabulation

Lake Bluff, section 18-00039-00-PV. Let by Illinois DOT on January 16, 2026, Lake, District 01. 5 bids received; low bid $3,131,134 by Campanella and Sons, Inc..

Owner
Illinois DOT
Letting
16 JAN 2026
Pay items
146
Data through
18 SEP 2026

Bidders

IDOT contract 61M08: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Campanella and Sons, Inc.2. Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc.3. Everlast Blacktop Inc.4. A Lamp Concrete Contractors, Inc.5. Martam Construction Incorporated
1T-carya cord 1-1/2 (A2002612)EACH2$425.00$1,086.25$1,000.00$425.00$467.50
2T-celtis occid 2 (A2002916)EACH1$400.00$481.25$770.00$400.00$440.00
3T-gymnocla dio 2 (A2005016)EACH1$450.00$508.75$880.00$450.00$495.00
4T-quercus alba 2 (A2006416)EACH1$450.00$536.25$880.00$450.00$495.00
5T-quercus bicol 2 (A2006516)EACH1$450.00$508.75$880.00$450.00$495.00
6T-quercus macr 2 (A2006716)EACH1$450.00$508.75$920.00$450.00$495.00
7T-cercis can TF 2 (B2001116)EACH3$470.00$536.25$950.00$470.00$517.00
8T-cornus kousa 5' (B2010165)EACH2$275.00$412.50$550.00$275.00$302.50
9Weed contr pre-EM GRN (K0029634)LB50$5.00$20.00$22.00$5.00$5.50
10Rem & rein bric paver (X0327611)SF350$15.00$16.00$33.00$30.00$16.50
11San service replcmnt (X1200016)EACH5$6,500.00$7,950.00$6,800.00$4,800.00$4,102.27
12Power pedestals (X1400088)EACH2$4,925.00$2,986.96$3,285.66$2,986.96$3,492.81
13Explor trench SPL (X2130010)LF200$70.00$10.00$40.00$10.00$108.41
14Temp access- priv ent (X4021000)EACH39$570.63$900.00$300.00$400.00$1,052.77
15Temp access- road (X4023000)EACH11$1,141.28$2,050.00$300.00$765.00$1,052.77
16Retaining wall remov (X5220102)LF166$10.17$21.00$50.00$17.00$46.96
17D I WTR MN fittings (X5610004)LB500$20.00$9.00$20.00$27.50$23.24
18WM line stop 6 (X5610746)EACH1$14,884$10,500$10,000$11,500$15,886
19WM line stop 8 (X5610748)EACH1$15,184$10,700$12,000$11,800$17,536
20WM line stop 12 (X5610752)EACH1$19,104$13,700$13,000$15,700$21,661
21Non-pres conn EX WM (X5610804)EACH2$3,287.09$6,600.00$11,900$4,600.00$4,580.69
22WTR SVC repl 1.5 long (X5620104)EACH23$6,500.00$6,700.00$5,900.00$8,400.00$9,421.64
23Cut & cap EX 6 WM (X5630006)EACH7$3,729.09$3,000.00$8,000.00$2,000.00$2,387.36
24Rem EX water valve (X5630405)EACH2$1,334.66$5,200.00$5,000.00$3,200.00$1,347.46
25Rem fire hyd/valv ass (X5640160)EACH1$1,107.60$1,050.00$8,500.00$1,900.00$1,347.43
26Pipe drains 6 SPL (X6011705)LF100$35.00$44.00$200.00$91.00$224.37
27Sanitary manhole adj (X6026050)EACH8$1,695.77$1,200.00$1,250.00$1,100.00$1,390.08
28Valve box removed (X6026632)EACH1$252.05$250.00$500.00$265.00$898.32
29Traf cont & prot SPL (X7010216)LS1$26,000$130,000$143,967$281,000$179,339
30Temp info signing (X7200061)SF52$25.00$25.00$16.00$15.00$27.50
31Lighting unit comp SP (X8250500)EACH4$25,001$5,671.02$6,238.12$5,671.02$6,631.41
32Det loop repl (X8860105)LF24$307.20$90.63$99.69$90.63$105.98
33Temp TR signal timing (X8900104)EACH8$1,695.00$495.00$544.50$495.00$578.83
34Construction layout (Z0013798)LS1$25,000$90,000$20,000$22,500$24,750
35Dust control watering (Z0019600)UNIT19$75.80$100.00$100.00$10.00$3,595.46
36Storm sew WM req 12 (Z0056608)LF358$157.40$175.00$172.00$215.00$351.57
37Trainees (Z0076600)HR500$0.80$0.80$0.80$0.80$0.80
38Trainees TPG (Z0076604)HR500$15.00$15.00$15.00$15.00$15.00
39Tree remov 6-15 (20100110)UNIT88$35.00$40.00$45.00$35.00$44.00
40Tree remov over 15 (20100210)UNIT49$55.00$45.00$50.00$55.00$49.50
41Temporary fence (20101000)LF250$5.00$5.00$5.00$1.00$5.50
42Tree trunk protection (20101100)EACH74$200.00$125.00$150.00$150.00$137.50
43Tree root pruning (20101200)EACH74$110.00$100.00$120.00$150.00$110.00
44Tree prun 1-10 (20101300)EACH30$75.00$50.00$60.00$75.00$55.00
45Tree prun over 10 (20101350)EACH44$220.00$150.00$170.00$220.00$165.00
46Earth excavation (20200100)CY3,822$60.00$59.50$45.00$68.25$55.75
47Rem & disp uns matl (20201200)CY674$60.00$60.00$48.00$51.00$65.78
48Trench backfill (20800150)CY1,362$70.00$0.01$62.00$10.00$99.75
49Geotech fab F/GR stab (21001000)SY5,722$2.39$2.75$2.00$1.35$2.98
50Topsoil exc & plac (21101505)CY1,381$0.01$0.01$28.00$15.00$35.91
51Topsoil F & P 6 (21101625)SY4,032$6.00$0.01$8.00$6.00$6.60
52Seeding CL 2A (25000210)ACRE2$4,840.00$2,500.00$2,700.00$4,840.00$5,324.00
53Nitrogen fert nutr (25000400)LB158$1.00$5.00$4.00$1.00$1.10
54Potassium fert nutr (25000600)LB158$1.00$5.00$4.00$1.00$1.10
55Erosion contr blanket (25100630)SY8,474$1.00$1.35$2.00$1.00$1.10
56Supple watering (25200200)UNIT1$500.00$1.00$2.00$500.00$550.00
57Temp eros contr seed (28000250)LB176$0.10$8.00$7.00$0.10$0.11
58Perimeter eros bar (28000400)LF400$3.00$8.00$6.00$1.00$3.30
59Inlet filters (28000510)EACH39$225.00$140.00$220.00$15.00$247.50
60Temp eros contr blank (28001100)SY8,474$0.10$1.00$1.00$0.10$0.11
61Agg subgrade improve (30300001)CY668$76.09$67.00$60.00$51.00$88.33
62Agg subgrade impr 12 (30300112)SY8,175$30.00$21.00$19.00$23.00$32.70
63Agg base cse B 4 (35101600)SY1,667$24.67$15.50$6.60$8.50$12.89
64Agg base cse B 8 (35102000)SY854$33.22$22.00$10.00$17.00$21.51
65Bit matls PR CT (40600275)LB18,400$0.01$0.01$0.01$0.01$0.01
66Bit matls tack CT (40600290)LB1,840$0.01$0.01$0.01$0.01$0.01
67Long joint sealant (40600370)LF2,598$3.40$3.40$6.00$2.35$3.86
68HMA surf rem butt JT (40600982)SY7$10.00$10.00$500.00$52.00$11.34
69HMA BC IL-19.0 N50 (40603080)TON5$300.00$300.00$500.00$266.00$340.16
70HMA SC IL-9.5 D N50 (40604060)TON144$226.00$226.00$93.75$186.00$256.25
71HMA pavt FD 6 (40701801)SY8,175$31.90$31.90$31.70$34.00$36.17
72PCC driveway pavt 6 (42300200)SY553$91.00$91.00$106.00$95.00$141.74
73PCC driveway pavt 8 (42300400)SY25$104.00$104.00$114.00$140.00$157.50
74PC conc sidewalk 5 (42400200)SF7,594$9.40$9.40$13.00$9.00$12.55
75PC conc sidewalk 6 (42400300)SF2,206$10.15$10.15$14.00$11.65$13.63
76Detectable warnings (42400800)SF360$25.00$25.00$69.00$35.00$51.50
77Pavement rem (44000100)SY8,175$11.50$16.00$12.00$14.00$17.46
78Drive pavement rem (44000200)SY1,432$10.54$13.00$18.00$12.00$31.97
79Comb curb gutter rem (44000500)LF5,572$3.19$5.50$8.20$7.00$8.87
80Sidewalk rem (44000600)SF8,612$1.09$1.50$1.90$1.90$3.16
81SS RG CL A 1 12 (550A2320)LF519$60.33$104.00$137.00$145.00$93.48
82SS RG CL A 1 18 (550A2340)LF160$77.26$115.00$139.00$170.00$115.10
83SS RG CL A 1 24 (550A2360)LF440$102.18$143.00$172.00$215.00$158.50
84SS RG CL A 2 12 (550A2520)LF30$64.66$110.00$159.00$170.00$103.53
85SS RG CL A 2 24 (550A2560)LF708$102.18$178.00$172.00$260.00$181.69
86Storm sewer rem 4 (55100100)LF63$13.35$20.00$40.00$21.05$8.31
87Storm sewer rem 6 (55100200)LF23$13.50$22.00$40.00$33.27$9.58
88Storm sewer rem 8 (55100300)LF1,278$17.35$22.00$40.00$23.39$10.04
89Storm sewer rem 10 (55100400)LF78$17.91$10.00$40.00$29.43$10.97
90Storm sewer rem 12 (55100500)LF88$18.51$24.00$40.00$24.21$11.62
91D I water main 6 (56103000)LF20$202.42$215.00$625.00$285.00$284.34
92Water valves 6 (56104900)EACH1$2,143.72$17,400$4,580.00$2,200.00$3,876.57
93Rem reloc wat main 12 (56107400)LF40$355.29$425.00$462.50$585.00$543.26
94Fire hydnts to BE adj (56400300)EACH6$2,241.49$2,750.00$1,800.00$2,200.00$2,515.04
95Fire hydrants (56400600)EACH1$9,295.95$12,000$11,000$11,600$14,148
96Pipe underdr T 2 4 (60108204)LF530$25.66$37.00$52.00$62.00$38.26
97CB TA 4 dia T8G (60200805)EACH1$4,097.30$3,800.00$4,700.00$5,000.00$5,212.68
98CB TA 4 dia T11F&G (60201105)EACH4$4,488.24$4,200.00$4,200.00$5,425.00$5,600.24
99CB TA 5 dia T11F&G (60204805)EACH2$7,217.96$5,900.00$5,650.00$7,125.00$7,244.54
100CB TC T1F OL (60206905)EACH1$2,601.33$2,400.00$3,000.00$3,300.00$2,415.46
101CB TC T11F&G (60207905)EACH14$2,809.09$2,600.00$3,000.00$3,300.00$2,662.05
102Man TA 4 dia T1F CL (60218400)EACH6$4,267.39$3,700.00$4,250.00$6,300.00$5,040.40
103Man TA 5 dia T1F CL (60221100)EACH8$7,631.66$6,100.00$5,650.00$8,000.00$6,832.46
104Man TA 6 dia T1F OL (60223700)EACH1$13,300$11,500$6,650.00$11,800$9,712.51
105Man TA 6 dia T11F&G (60224020)EACH2$13,509$11,000$6,650.00$11,800$9,959.11
106Inlets TA T1F OL (60234200)EACH1$1,932.53$2,100.00$3,000.00$3,325.00$2,284.66
107Inlets TA T11F&G (60236800)EACH6$2,141.77$2,150.00$3,000.00$3,325.00$2,531.24
108Inlets TB T1F OL (60240210)EACH2$2,961.50$3,000.00$3,000.00$4,050.00$4,095.17
109Inlets TB T11F&G (60240310)EACH1$2,779.29$3,100.00$3,000.00$4,500.00$4,341.76
110CB adj new T8G (60251200)EACH2$712.15$575.00$890.00$850.00$955.93
111CB adj new T11F&G (60251500)EACH2$1,810.77$1,200.00$900.00$1,300.00$1,343.48
112VV adj new T1F CL (60265900)EACH8$1,725.88$800.00$900.00$1,200.00$1,096.88
113Valve box adj (60266600)EACH29$466.65$600.00$500.00$590.00$677.50
114Remov manholes (60500040)EACH10$882.13$450.00$500.00$625.00$1,220.61
115Remov catch bas (60500050)EACH4$882.63$650.00$500.00$625.00$1,220.62
116Remov inlets (60500060)EACH8$625.35$325.00$500.00$325.00$1,074.60
117Comb CC&G TB6.12 (60603800)LF4,777$28.05$28.05$37.50$29.00$47.99
118Comb CC&G TY B-6.24 (60605000)LF795$41.65$41.65$41.50$48.50$66.08
119Conc thrust blocks (61000050)EACH1$3,310.63$1,590.13$300.00$430.00$2,336.52
120Non SPL waste disposl (66900200)CY1,679$82.00$75.00$80.00$75.00$90.81
121Soil disposal analy (66900530)EACH4$1,750.00$1,750.00$1,400.00$850.00$1,595.00
122Reg sub P-const plan (66901001)LS1$3,950.00$3,950.00$5,000.00$5,800.00$3,410.00
123Reg sub F con report (66901003)LS1$600.00$600.00$3,500.00$500.00$1,320.00
124Reg sub mon (66901006)CAL DAY100$675.00$675.00$1,350.00$100.00$660.00
125Engr field office A (67000400)CAL MO8$4,000.00$5,200.00$3,500.00$3,000.00$5,450.21
126Mobilization (67100100)LS1$57,000$196,500$181,934$214,000$253,355
127Changeable message SN (70107025)CAL DAY180$28.00$28.00$28.00$1.00$30.80
128Short term pavt mking (70300100)LF2,054$0.75$0.75$1.00$0.01$0.85
129SHRT TRM pavt MK rem (70300150)SF632$2.00$3.21$2.00$0.01$2.36
130Temp PVT MK line 4 - paint (70300221)LF16,998$0.40$0.40$1.10$0.01$0.44
131Temp PVT MK line 6 - paint (70300241)LF2,499$0.80$0.80$1.10$0.01$0.88
132Temp PVT MK line 24 - paint (70300281)LF366$5.50$5.50$1.10$0.01$6.05
133Sign panel T1 (72000100)SF146$26.00$26.00$33.00$25.00$28.60
134Remov sin pan assy TA (72400100)EACH19$75.00$75.00$55.00$50.00$82.50
135Remov sin pan assy TB (72400200)EACH33$85.00$85.00$80.00$50.00$93.50
136Teles STL sin support (72800100)LF293$14.00$14.00$24.00$20.00$15.40
137THPL PVT MK line 4 (78000200)LF5,666$1.25$1.25$1.70$1.07$1.38
138THPL PVT MK line 6 (78000400)LF925$1.50$1.50$2.00$1.75$1.65
139THPL PVT MK line 12 (78000600)LF50$4.00$4.00$5.00$3.25$4.40
140THPL PVT MK line 24 (78000650)LF122$6.00$6.00$7.00$5.50$6.60
141Elect serv install (80400100)EACH2$5,558.00$5,613.92$6,175.31$5,613.92$6,564.65
142Elect util serv conn (80400200)LS1$5,000.00$5,000.00$5,000.00$5,000.00$5,000.00
143Undrgrd C galvs 3 (81028220)LF95$89.10$71.78$78.96$71.78$83.94
144Undrgrd C PVC 1 (81028320)LF240$31.30$30.39$33.43$30.39$35.54
145EC C XLP use 1C 8 (81702120)LF750$3.80$5.52$6.07$5.52$6.45
146Light pole FDN 24D (83600200)LF24$597.80$418.04$459.84$418.04$488.84
IDOT contract 61M08: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy