IDOT contract 61M17 bid tabulation
Algonquin, section 22-00093-00-PV. Let by Illinois DOT on April 24, 2026, Kane, District 01. 6 bids received; low bid $3,694,062 by Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc..
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 135
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. | $3,694,062 | Low |
| 2 | Plote Construction, Inc. | $3,721,740 | +1.0% |
| 3 | Schroeder Asphalt Services, Inc. | $3,988,475 | +8.0% |
| 4 | Alliance Contractors, Inc. | $4,279,336 | +16% |
| 5 | A Lamp Concrete Contractors, Inc. | $4,297,973 | +16% |
| 6 | Martam Construction Incorporated | $4,510,343 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. | 2. Plote Construction, Inc. | 3. Schroeder Asphalt Services, Inc. | 4. Alliance Contractors, Inc. | 5. A Lamp Concrete Contractors, Inc. | 6. Martam Construction Incorporated |
|---|---|---|---|---|---|---|---|---|---|
| 1 | T-alnus rugosa 3.5 (A2002278) | EACH | 9 | $650.00 | $650.00 | $1,000.00 | $650.00 | $600.00 | $715.00 |
| 2 | T-catalpa spec 2-1/2 (A2002820) | EACH | 8 | $550.00 | $550.00 | $670.00 | $550.00 | $600.00 | $605.00 |
| 3 | T-ginkgo bil AG 2-1/2 (A2004514) | EACH | 4 | $900.00 | $900.00 | $670.00 | $900.00 | $900.00 | $990.00 |
| 4 | T-liqudamb styr 2 (A2005316) | EACH | 5 | $550.00 | $550.00 | $670.00 | $550.00 | $550.00 | $605.00 |
| 5 | T-taxodium dis 2-1/2 (A2007620) | EACH | 5 | $550.00 | $550.00 | $670.00 | $550.00 | $650.00 | $605.00 |
| 6 | T-cercis can TF 2-1/2 (B2001122) | EACH | 11 | $650.00 | $650.00 | $670.00 | $650.00 | $650.00 | $715.00 |
| 7 | T-cornus mas TF 2-1/2 (B2001422) | EACH | 11 | $650.00 | $650.00 | $670.00 | $650.00 | $650.00 | $715.00 |
| 8 | T-crat cru-I TF 2-1/2 (B2001620) | EACH | 13 | $600.00 | $600.00 | $670.00 | $600.00 | $600.00 | $660.00 |
| 9 | T-syring ret TF 2-1/2 (B2006220) | EACH | 12 | $600.00 | $600.00 | $670.00 | $600.00 | $625.00 | $660.00 |
| 10 | Relocate EX mailbox (X0327301) | EACH | 6 | $350.00 | $300.00 | $300.00 | $150.00 | $225.00 | $526.72 |
| 11 | Drainage weir (X1200001) | EACH | 1 | $57,500 | $55,000 | $54,000 | $49,033 | $57,275 | $48,870 |
| 12 | D I WM 12 RJ pipe (X1200078) | LF | 350 | $260.00 | $160.00 | $360.00 | $317.00 | $394.00 | $372.69 |
| 13 | WM qua cas pipe 20 (X1200311) | LF | 142 | $285.00 | $350.00 | $280.00 | $254.00 | $300.00 | $259.94 |
| 14 | WM qua cas pipe 16 (X1200345) | LF | 22 | $365.00 | $300.00 | $270.00 | $244.00 | $274.00 | $279.60 |
| 15 | Drop box no.1 (X5420201) | EACH | 1 | $9,500.00 | $10,000 | $8,400.00 | $7,653.00 | $8,550.00 | $14,360 |
| 16 | D I WTR MN fittings (X5610004) | LB | 3,293 | $7.00 | $6.00 | $16.50 | $15.00 | $1.00 | $17.02 |
| 17 | DI WM CL52 poly EN 8 (X5611108) | LF | 60 | $145.00 | $140.00 | $140.00 | $127.00 | $193.00 | $232.19 |
| 18 | DI WM CL52 poly EN 12 (X5611112) | LF | 2,315 | $155.00 | $165.00 | $193.00 | $176.00 | $218.00 | $214.04 |
| 19 | Conn to EX W main 8 (X5630708) | EACH | 2 | $4,800.00 | $4,500.00 | $5,300.00 | $4,803.00 | $4,500.00 | $5,928.63 |
| 20 | Conn to EX W main 12 (X5630712) | EACH | 2 | $5,250.00 | $6,500.00 | $7,100.00 | $6,387.00 | $5,000.00 | $8,145.18 |
| 21 | Connect EX pipe undr (X6010001) | EACH | 2 | $1,500.00 | $2,500.00 | $420.00 | $381.00 | $675.00 | $973.69 |
| 22 | P undr outlet ext 6 (X6010106) | EACH | 9 | $1,900.00 | $1,500.00 | $505.00 | $459.00 | $1,275.00 | $1,195.70 |
| 23 | Rem conc HDWL P DRNS (X6015000) | EACH | 4 | $500.00 | $1,500.00 | $358.00 | $322.00 | $175.00 | $427.15 |
| 24 | Rem rep C HDWL P undr (X6015015) | EACH | 6 | $1,200.00 | $1,500.00 | $1,040.00 | $941.00 | $1,100.00 | $1,038.59 |
| 25 | Sanitary manhole adj (X6026050) | EACH | 9 | $975.00 | $1,000.00 | $1,320.00 | $1,183.00 | $1,550.00 | $1,658.67 |
| 26 | Rustic rail fence (X6640624) | LF | 520 | $24.82 | $25.00 | $28.00 | $24.82 | $24.82 | $27.30 |
| 27 | Rustic rail fen rem (X6640625) | LF | 493 | $5.34 | $6.00 | $6.00 | $5.34 | $5.34 | $5.87 |
| 28 | Traf cont & prot SPL (X7010216) | LS | 1 | $35,000 | $45,000 | $52,000 | $35,000 | $185,650 | $234,332 |
| 29 | Temp info signing (X7200061) | SF | 103 | $15.00 | $15.00 | $16.80 | $15.00 | $35.00 | $16.50 |
| 30 | Construction layout (Z0013798) | LS | 1 | $45,000 | $35,000 | $36,000 | $29,900 | $29,900 | $49,500 |
| 31 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 |
| 32 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 33 | Undr connect to STR (Z0076870) | EACH | 28 | $475.00 | $1,000.00 | $109.00 | $920.00 | $700.00 | $1,324.64 |
| 34 | Tree trunk protection (20101100) | EACH | 20 | $300.00 | $125.00 | $85.00 | $350.00 | $125.00 | $137.50 |
| 35 | Tree root pruning (20101200) | EACH | 5 | $300.00 | $200.00 | $108.00 | $250.00 | $200.00 | $220.00 |
| 36 | Earth excavation (20200100) | CY | 4,798 | $27.75 | $30.00 | $49.50 | $20.00 | $38.00 | $33.58 |
| 37 | Rem & disp uns matl (20201200) | CY | 1,290 | $32.00 | $25.00 | $55.00 | $40.00 | $20.00 | $28.15 |
| 38 | Trench backfill (20800150) | CY | 363 | $64.00 | $75.00 | $94.50 | $85.00 | $50.00 | $60.48 |
| 39 | Geotech fab F/GR stab (21001000) | SY | 3,758 | $2.50 | $2.20 | $1.95 | $1.00 | $0.10 | $3.03 |
| 40 | Topsoil exc & plac (21101505) | CY | 3,711 | $22.00 | $35.00 | $32.00 | $25.00 | $20.00 | $21.91 |
| 41 | Seeding CL 1A (25000110) | ACRE | 1.25 | $2,200.00 | $2,200.00 | $3,850.00 | $2,200.00 | $12,100 | $2,420.00 |
| 42 | Seeding CL 2A (25000210) | ACRE | 3 | $2,500.00 | $2,500.00 | $3,400.00 | $2,500.00 | $12,100 | $2,750.00 |
| 43 | Seeding CL 4B (25000314) | ACRE | 0.50 | $5,100.00 | $5,100.00 | $6,700.00 | $5,100.00 | $12,100 | $5,610.00 |
| 44 | Nitrogen fert nutr (25000400) | LB | 383 | $1.00 | $1.00 | $3.00 | $1.00 | $1.00 | $1.10 |
| 45 | Potassium fert nutr (25000600) | LB | 383 | $1.00 | $1.00 | $3.00 | $1.00 | $1.00 | $1.10 |
| 46 | Erosion contr blanket (25100630) | SY | 22,990 | $1.30 | $1.30 | $1.40 | $1.30 | $2.25 | $1.43 |
| 47 | Supple watering (25200200) | UNIT | 6 | $1.00 | $1.00 | $1.10 | $1.00 | $200.00 | $1.10 |
| 48 | Temp eros contr seed (28000250) | LB | 950 | $1.00 | $1.00 | $2.30 | $1.00 | $0.10 | $1.10 |
| 49 | Temp ditch checks (28000305) | LF | 225 | $8.00 | $8.00 | $15.00 | $8.00 | $0.10 | $8.80 |
| 50 | Perimeter eros bar (28000400) | LF | 5,197 | $2.50 | $2.50 | $4.45 | $2.50 | $2.85 | $2.75 |
| 51 | Inlet & pipe protect (28000500) | EACH | 9 | $300.00 | $300.00 | $125.00 | $300.00 | $125.00 | $330.00 |
| 52 | Inlet filters (28000510) | EACH | 27 | $150.00 | $150.00 | $165.00 | $25.00 | $15.00 | $165.00 |
| 53 | Temp eros contr blank (28001100) | SY | 45,980 | $0.50 | $0.50 | $0.02 | $0.50 | $0.10 | $0.55 |
| 54 | Agg subgrade improve (30300001) | CY | 1,240 | $58.00 | $40.00 | $58.00 | $36.00 | $20.00 | $50.95 |
| 55 | Agg subgrade impr 12 (30300112) | SY | 15,031 | $18.00 | $14.00 | $19.00 | $26.00 | $18.00 | $16.28 |
| 56 | Agg base cse B 4 (35101600) | SY | 1,876 | $8.25 | $8.00 | $7.00 | $15.00 | $7.65 | $5.73 |
| 57 | Agg base cse B 6 (35101800) | SY | 2,717 | $14.25 | $12.00 | $12.00 | $18.00 | $12.60 | $8.66 |
| 58 | Agg base cse B 8 (35102000) | SY | 44 | $22.00 | $16.00 | $15.00 | $21.00 | $21.50 | $14.51 |
| 59 | Agg base cse B 10 (35102200) | SY | 1,675 | $18.65 | $18.00 | $17.00 | $24.00 | $18.00 | $14.35 |
| 60 | HMA base cse 6 (35501308) | SY | 178 | $88.45 | $110.00 | $45.00 | $88.45 | $88.45 | $103.20 |
| 61 | Aggregate-temp access (40201000) | TON | 200 | $35.50 | $10.00 | $28.00 | $20.00 | $1.00 | $30.00 |
| 62 | Bit matls PR CT (40600275) | LB | 39,348 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 63 | Bit matls tack CT (40600290) | LB | 4,115 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 64 | Long joint sealant (40600370) | LF | 6,244 | $2.91 | $4.25 | $3.25 | $2.91 | $2.77 | $3.40 |
| 65 | HMA surf rem butt JT (40600982) | SY | 11 | $58.00 | $225.00 | $10.00 | $58.00 | $58.00 | $67.67 |
| 66 | HMA BC IL-19.0 N70 (40603085) | TON | 5,050 | $77.80 | $83.00 | $87.00 | $77.80 | $77.80 | $90.78 |
| 67 | P HMA BC IL-4.75 N50 (40603200) | TON | 183 | $140.40 | $155.00 | $130.00 | $140.40 | $140.40 | $163.82 |
| 68 | HMA SC IL-9.5 D N50 (40604060) | TON | 327 | $134.75 | $130.00 | $110.00 | $134.75 | $134.75 | $157.22 |
| 69 | HMA SC IL-9.5 D N70 (40604062) | TON | 1,537 | $89.99 | $84.00 | $88.00 | $89.99 | $89.99 | $105.00 |
| 70 | Protective coat (42001300) | SY | 1,340 | $3.20 | $0.01 | $0.01 | $0.01 | $1.50 | $2.63 |
| 71 | PCC driveway pavt 6 (42300200) | SY | 33 | $82.00 | $125.00 | $94.00 | $80.00 | $113.50 | $145.77 |
| 72 | PCC driveway pavt 8 (42300400) | SY | 173 | $94.90 | $135.00 | $107.00 | $92.00 | $132.00 | $159.78 |
| 73 | PC conc sidewalk 5 (42400200) | SF | 16,888 | $7.80 | $9.00 | $9.55 | $8.15 | $7.75 | $12.00 |
| 74 | Detectable warnings (42400800) | SF | 347 | $40.00 | $35.00 | $34.50 | $30.00 | $30.00 | $70.74 |
| 75 | Pavement rem (44000100) | SY | 15,018 | $11.00 | $6.00 | $8.50 | $30.00 | $23.50 | $14.00 |
| 76 | HMA surf rem 2 1/2 (44000159) | SY | 3,237 | $5.06 | $5.00 | $4.50 | $5.06 | $5.06 | $5.90 |
| 77 | Drive pavement rem (44000200) | SY | 267 | $11.00 | $15.00 | $16.50 | $30.00 | $16.25 | $10.09 |
| 78 | Comb curb gutter rem (44000500) | LF | 5,370 | $3.75 | $4.00 | $9.00 | $20.00 | $3.65 | $8.00 |
| 79 | Sidewalk rem (44000600) | SF | 9,234 | $1.35 | $1.50 | $2.00 | $3.00 | $1.00 | $2.38 |
| 80 | CL D patch T1 6 (44201713) | SY | 45 | $54.70 | $100.00 | $65.00 | $54.70 | $54.70 | $63.82 |
| 81 | CL D patch T2 6 (44201717) | SY | 90 | $52.10 | $84.00 | $65.00 | $52.10 | $52.10 | $60.79 |
| 82 | CL D patch T3 6 (44201721) | SY | 119 | $52.10 | $83.00 | $62.00 | $52.10 | $52.10 | $60.79 |
| 83 | CL D patch T4 6 (44201723) | SY | 100 | $52.10 | $82.00 | $60.00 | $52.10 | $52.10 | $60.79 |
| 84 | Aggregate SHLDS B 6 (48101500) | SY | 1,107 | $20.31 | $10.00 | $19.00 | $30.00 | $14.00 | $23.70 |
| 85 | Pipe culvert remov (50105220) | LF | 312 | $30.00 | $50.00 | $34.35 | $31.00 | $15.00 | $12.82 |
| 86 | P cul CL A 1 24 (542A0229) | LF | 63 | $107.00 | $210.00 | $140.00 | $124.00 | $188.00 | $151.21 |
| 87 | P cul CL A 1 36 (542A0241) | LF | 128 | $152.00 | $220.00 | $202.00 | $183.00 | $261.00 | $181.57 |
| 88 | P cul CL C 1 15 (542C0220) | LF | 247 | $80.00 | $200.00 | $87.00 | $78.00 | $134.00 | $92.34 |
| 89 | PRC flar end sec 24 (54213669) | EACH | 3 | $2,950.00 | $3,000.00 | $3,450.00 | $3,122.00 | $4,675.00 | $1,973.48 |
| 90 | PRC flar end sec 36 (54213681) | EACH | 2 | $4,550.00 | $4,500.00 | $4,650.00 | $4,193.00 | $5,700.00 | $3,373.67 |
| 91 | Metal FL end sec 15" (54262715) | EACH | 10 | $625.00 | $180.00 | $890.00 | $806.00 | $1,200.00 | $599.93 |
| 92 | Storm sew CL A 1 12 (550A0050) | LF | 510 | $65.00 | $150.00 | $82.00 | $73.00 | $125.00 | $109.00 |
| 93 | Storm sew CL A 1 18 (550A0090) | LF | 125 | $88.00 | $190.00 | $105.00 | $95.00 | $146.00 | $111.42 |
| 94 | Storm sewer rem 12 (55100500) | LF | 407 | $33.00 | $1.00 | $27.00 | $24.00 | $1.00 | $12.82 |
| 95 | Storm sewer rem 15 (55100700) | LF | 4 | $26.00 | $1.00 | $30.25 | $27.00 | $50.00 | $64.08 |
| 96 | Water valves 12 (56105200) | EACH | 5 | $5,400.00 | $5,500.00 | $5,925.00 | $5,381.00 | $4,575.00 | $5,365.33 |
| 97 | Fire hydrants (56400600) | EACH | 4 | $12,200 | $8,000.00 | $11,100 | $10,009 | $11,375 | $11,531 |
| 98 | Pipe underdr T 1 6 (60108106) | LF | 220 | $42.00 | $45.00 | $49.00 | $50.00 | $37.00 | $28.91 |
| 99 | Pipe underdr T 2 4 (60108204) | LF | 4,614 | $29.00 | $33.00 | $40.00 | $40.00 | $31.00 | $24.40 |
| 100 | CB TA 4 dia T3F&G (60200305) | EACH | 10 | $4,000.00 | $5,000.00 | $2,550.00 | $4,528.00 | $5,800.00 | $4,750.54 |
| 101 | Man TA 4 dia T1F CL (60218400) | EACH | 2 | $4,800.00 | $7,500.00 | $5,100.00 | $4,588.00 | $6,725.00 | $4,223.81 |
| 102 | Inlets TA T3F&G (60235700) | EACH | 10 | $2,825.00 | $2,100.00 | $2,575.00 | $2,303.00 | $2,725.00 | $1,848.43 |
| 103 | Inlets TA T8G (60236200) | EACH | 1 | $2,050.00 | $2,300.00 | $1,980.00 | $1,760.00 | $2,425.00 | $1,480.04 |
| 104 | VV TA 5 dia T1F CL (60248900) | EACH | 5 | $5,400.00 | $5,000.00 | $7,850.00 | $7,103.00 | $7,300.00 | $6,146.47 |
| 105 | CB adjust (60250200) | EACH | 2 | $1,200.00 | $1,000.00 | $650.00 | $591.00 | $550.00 | $662.32 |
| 106 | Man adjust (60255500) | EACH | 12 | $1,300.00 | $1,100.00 | $735.00 | $671.00 | $550.00 | $662.32 |
| 107 | Remov manholes (60500040) | EACH | 2 | $800.00 | $100.00 | $850.00 | $788.00 | $625.00 | $883.10 |
| 108 | Remov catch bas (60500050) | EACH | 4 | $800.00 | $100.00 | $850.00 | $788.00 | $350.00 | $883.10 |
| 109 | Remov inlets (60500060) | EACH | 4 | $600.00 | $100.00 | $390.00 | $346.00 | $325.00 | $574.01 |
| 110 | Comb CC&G TB6.12 (60603800) | LF | 6,029 | $23.55 | $28.00 | $27.00 | $22.35 | $27.25 | $35.32 |
| 111 | Engr field office B (67000500) | CAL MO | 12 | $3,800.00 | $3,500.00 | $3,000.00 | $500.00 | $3,000.00 | $3,500.88 |
| 112 | Mobilization (67100100) | LS | 1 | $220,000 | $196,500 | $50,000 | $245,000 | $257,850 | $270,621 |
| 113 | Short term pavt mking (70300100) | LF | 10,141 | $1.00 | $0.10 | $2.00 | $0.25 | $0.25 | $2.20 |
| 114 | SHRT TRM pavt MK rem (70300150) | SF | 3,381 | $0.45 | $0.10 | $0.50 | $0.30 | $0.30 | $0.50 |
| 115 | Temp PVT MK LTR & sym paint (70300211) | SF | 328 | $1.00 | $1.00 | $1.20 | $1.00 | $0.01 | $1.10 |
| 116 | Temp PVT MK line 4 - paint (70300221) | LF | 16,080 | $0.30 | $0.30 | $0.35 | $0.30 | $0.01 | $0.33 |
| 117 | Temp PVT MK line 6 - paint (70300241) | LF | 1,411 | $0.40 | $0.40 | $0.45 | $0.40 | $0.01 | $0.44 |
| 118 | Temp PVT MK line 12 - paint (70300261) | LF | 1,255 | $1.00 | $1.00 | $1.12 | $1.00 | $0.01 | $1.10 |
| 119 | Temp PVT MK line 24 - paint (70300281) | LF | 111 | $2.00 | $2.00 | $2.24 | $2.00 | $0.01 | $2.20 |
| 120 | Sign panel T1 (72000100) | SF | 242 | $22.00 | $22.00 | $25.00 | $22.00 | $30.00 | $24.20 |
| 121 | Remov sign panel T1 (72400310) | SF | 137 | $15.00 | $15.00 | $16.80 | $15.00 | $10.00 | $16.50 |
| 122 | Reloc sign panel T1 (72400710) | SF | 13 | $15.00 | $15.00 | $16.80 | $15.00 | $15.00 | $16.50 |
| 123 | Teles STL sin support (72800100) | LF | 633 | $19.00 | $19.00 | $21.30 | $19.00 | $20.00 | $20.90 |
| 124 | Metal post TY A (72900100) | LF | 48 | $18.00 | $18.00 | $20.20 | $18.00 | $25.00 | $19.80 |
| 125 | THPL PVT MK LTR & sym (78000100) | SF | 328 | $5.25 | $5.25 | $5.88 | $5.25 | $6.20 | $5.78 |
| 126 | THPL PVT MK line 4 (78000200) | LF | 16,080 | $1.08 | $1.08 | $1.21 | $1.08 | $1.05 | $1.19 |
| 127 | THPL PVT MK line 6 (78000400) | LF | 1,411 | $1.55 | $1.55 | $1.75 | $1.55 | $1.55 | $1.71 |
| 128 | THPL PVT MK line 12 (78000600) | LF | 1,255 | $2.32 | $2.32 | $2.60 | $2.32 | $3.10 | $2.55 |
| 129 | THPL PVT MK line 24 (78000650) | LF | 111 | $5.25 | $5.25 | $5.88 | $5.25 | $6.20 | $5.78 |
| 130 | GRV RCSD PM LTR & sym (78011000) | SF | 328 | $1.10 | $1.10 | $1.25 | $1.10 | $2.30 | $1.21 |
| 131 | GRV RCSD PVT MRKG 5 (78011025) | LF | 10,744 | $0.50 | $0.50 | $0.56 | $0.50 | $0.50 | $0.55 |
| 132 | GRV RCSD PVT MRKG 7 (78011035) | LF | 1,411 | $0.75 | $0.75 | $0.84 | $0.75 | $0.65 | $0.83 |
| 133 | GRV RCSD PVT MRKG 13 (78011065) | LF | 1,255 | $0.90 | $0.90 | $1.05 | $0.90 | $1.25 | $0.99 |
| 134 | GRV RCSD PVT MRKG 25 (78011125) | LF | 111 | $1.10 | $1.10 | $1.25 | $1.10 | $2.40 | $1.21 |
| 135 | PVT MKG rem WTR blast (78300202) | SF | 7,817 | $1.25 | $1.25 | $1.40 | $1.25 | $1.00 | $1.38 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.