IDOT contract 61L92 bid tabulation

Lincolnwood, section 16-00061-00-LS. Let by Illinois DOT on November 7, 2025, Cook, District 01. 5 bids received; low bid $5,462,909 by Capitol Cement Co., Inc..

Owner
Illinois DOT
Letting
07 NOV 2025
Pay items
185
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Capitol Cement Co., Inc.$5,462,909Low
2Acura Inc.$5,488,0480.0%
3Alliance Contractors, Inc.$5,537,342+1.0%
4Everlast Blacktop Inc.$5,919,649+8.0%
5Martam Construction Incorporated$6,328,409+16%
IDOT contract 61L92: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Capitol Cement Co., Inc.2. Acura Inc.3. Alliance Contractors, Inc.4. Everlast Blacktop Inc.5. Martam Construction Incorporated
1T-gled tri 2.5 (A2004622)EACH12$250.00$1,085.00$494.00$1,000.00$513.76
2T-syrg RT IS TF 2-1/2 (B2006320)EACH17$250.00$1,085.00$456.00$1,000.00$474.24
3P PL ornament T gal P (K0012990)UNIT3$250.00$2,600.00$2,625.00$3,000.00$2,730.00
4Shrub removal (K0026830)EACH46$10.00$30.00$50.00$20.00$52.00
5Mulch placement 4 (K0036120)SY180$20.00$23.00$11.00$45.00$11.44
6Planter curb (XX005735)LF334$60.00$60.00$44.15$79.00$44.99
7Modular conc paver SP (XX005845)SF2,533$48.00$48.00$37.00$26.50$62.44
8C I tree grates (XX005878)EACH36$4,500.00$10,000$6,795.00$9,000.00$8,480.20
9Water serv ins 1 comp (XX006243)EACH5$7,500.00$5,000.00$9,172.00$8,800.00$5,400.00
10Ped act CRSS warn sys (XX007021)EACH1$23,200$23,333$23,333$25,000$25,278
11Plant soil, F & P 24" (XX007980)SY2,040$25.00$34.00$61.00$120.00$63.44
12T-ulmus pros elm 2.5 (XX009734)EACH10$1,250.00$1,100.00$479.00$1,200.00$498.16
13PVC con T 3 (S40) (X0324478)LF35$41.00$36.36$36.36$39.00$39.39
14TV inspect of sewer (X0325207)LF1,600$10.00$7.00$6.60$5.00$6.86
15PVC con T 2 (S40) (X0325531)LF290$10.50$39.38$39.38$49.00$42.66
16CC TPX 2-1/C6 1-1/CG (X0326326)LF1,825$8.00$9.04$9.04$10.00$9.79
17Washout basin (X0326806)LS1$4,000.00$5,000.00$3,250.00$2,000.00$4,956.01
18Trash receptacles (X0327997)EACH6$2,000.00$2,500.00$1,805.00$4,500.00$2,521.44
19Brick pavers (X0540000)SF4,203$37.00$37.00$36.00$30.00$51.00
20Valve vaults abandon (X1200015)EACH1$1,000.00$1,000.00$500.00$800.00$1,326.16
21Luminaire SPL (X1400202)EACH10$2,520.00$1,984.88$1,984.88$2,200.00$2,150.32
22Luminaire LED special (X1400238)EACH10$1,270.00$1,119.76$1,119.76$1,400.00$1,213.09
23Trench backfill SPL (X2080250)CY670$55.00$55.00$93.00$88.00$115.23
24TR & bkfill W screen (X2080251)LF1,760$11.50$12.49$12.49$15.00$13.53
25Topsoil F & P 4 SPL (X2110104)SY821$12.00$6.00$12.00$6.00$12.48
26Temp access- com ent (X4022000)EACH6$1,000.00$1,000.00$725.00$3,500.00$1,105.63
27Temporary sidewalk (X4240114)SF2,559$5.00$10.00$15.00$15.00$14.37
28Detectable warn SPL (X4240800)SF184$38.50$60.00$50.00$69.00$88.00
29HMA surf rem var DP (X4401198)SY9,222$6.55$6.00$6.10$4.80$6.47
30Cur-in-PL pipe LNR 8 (X5430208)LF136$46.71$300.00$175.00$317.60$292.12
31SS DI T1 8 (X5504002)LF301$155.00$200.00$331.00$175.00$219.01
32D I WTR MN fittings (X5610004)LB1,120$10.00$11.00$13.00$15.00$14.26
33Cut & cap EX 6 WM (X5630006)EACH2$4,000.00$5,000.00$4,480.00$8,500.00$2,200.00
34Conn to EX W main 6 (X5630706)EACH1$6,500.00$5,000.00$8,713.00$8,000.00$3,988.52
35Conn to EX W main 8 (X5630708)EACH1$7,500.00$7,500.00$8,773.00$8,000.00$4,080.73
36CB TA 4D T1FOL (X6022505)EACH2$6,250.00$7,500.00$11,524$5,000.00$5,322.71
37Inlets TA T1F OL SPL (X6023204)EACH3$4,250.00$3,500.00$3,129.00$2,952.00$3,300.00
38VV removed (X6026622)EACH1$500.00$1,000.00$1,572.00$500.00$639.58
39Comb CC&G TBV.12 (X6060045)LF1,658$55.00$55.00$80.10$39.00$37.90
40Traf cont & prot SPL (X7010216)LS1$129,400$192,500$465,514$522,515$493,235
41Temp info signing (X7200061)SF52$17.00$25.00$15.00$38.00$15.60
42Elect serv install SP (X8040102)EACH1$2,310.00$2,988.08$2,988.08$3,500.00$3,237.14
43Elect serv connect (X8040305)LS1$914.00$5,412.16$5,412.16$5,900.00$5,863.26
44HD handhole SPL (X8140210)EACH1$6,600.00$5,600.48$5,600.48$6,100.00$6,067.28
45Lighting unit comp SP (X8250500)EACH10$11,400$8,119.28$8,119.28$9,000.00$8,796.02
46Light controller SPL (X8250505)EACH1$2,870.00$15,000$15,000$16,500$16,250
47Light contr FDN (X8250510)EACH1$3,190.00$4,512.16$4,512.16$4,000.00$4,888.25
48Light pole FDN SPL (X8360110)LF48$363.00$426.91$426.91$460.00$462.49
49Light pole FDN 24D SP (X8360210)LF50$749.00$333.76$333.76$340.00$361.58
50Light pole FDN 24D OS (X8360215)LF70$460.00$426.91$426.91$465.00$462.49
51Maint ST LTG sys (X8400104)LS1$22,400$5,418.24$5,418.24$5,900.00$5,869.85
52Rem EX lighting systm (X8440128)LS1$17,300$10,836$10,836$13,000$11,740
53Illuminated sign SPL (X8910050)EACH2$7,560.00$6,946.56$6,946.56$7,400.00$7,525.56
54Benches (Z0003850)EACH9$2,800.00$3,000.00$1,940.00$4,500.00$3,663.42
55Bicycle racks (Z0003855)EACH6$1,000.00$900.00$955.00$3,900.00$1,395.23
56Clean EX man/hand (Z0010614)EACH2$1,480.00$1,065.04$500.00$800.00$520.00
57Clean EX inlets (Z0010615)EACH2$500.00$500.00$500.00$800.00$520.00
58Construction layout (Z0013798)LS1$140,000$75,000$16,500$50,000$17,160
59SS 1 wat MN 8 (Z0056644)LF119$155.00$200.00$293.00$190.00$210.55
60Temp pavement (Z0062456)SY50$75.00$120.00$250.00$300.00$157.18
61Conc retain wall rem (Z0075498)CY85$199.00$100.00$75.00$650.00$128.00
62Trainees (Z0076600)HR500$0.80$0.80$0.80$0.80$0.80
63Trainees TPG (Z0076604)HR500$15.00$15.00$15.00$15.00$15.00
64Tree remov 6-15 (20100110)UNIT255$23.00$45.00$30.00$45.00$31.20
65Tree remov over 15 (20100210)UNIT235$31.00$60.00$45.00$45.00$46.80
66Temporary fence (20101000)LF1,086$10.00$5.00$3.00$2.00$3.12
67Tree trunk protection (20101100)EACH10$150.00$150.00$150.00$200.00$156.00
68Tree root pruning (20101200)EACH15$150.00$150.00$124.00$180.00$128.96
69Tree prun 1-10 (20101300)EACH11$65.00$100.00$75.00$1.00$78.00
70Tree prun over 10 (20101350)EACH4$185.00$200.00$125.00$1.00$130.00
71Earth excavation (20200100)CY4,330$99.00$35.00$10.00$55.00$79.60
72Rem & disp uns matl (20201200)CY138$99.00$55.00$50.00$55.00$82.06
73Geotech fab F/GR stab (21001000)SY894$6.00$4.50$3.00$6.00$3.80
74Sodding salt tolerant (25200110)SY823$15.00$14.00$15.00$9.00$15.60
75Supple watering (25200200)UNIT48$100.00$85.00$0.01$1.00$0.01
76Inlet filters (28000510)EACH51$150.00$200.00$25.00$160.00$225.68
77Agg subgrade improve (30300001)CY299$50.00$36.00$80.00$60.00$79.67
78Sub gran mat B (31101100)CY2,528$50.00$60.00$72.50$52.00$70.16
79Sub gran mat B 2 (31101180)SY1,591$2.00$7.00$4.00$4.00$5.35
80PCC bse cse 10 (35300500)SY1,301$120.00$90.00$119.00$91.00$99.30
81PCC base cse W 10 (35400500)SY1,852$120.00$90.00$119.00$91.00$99.30
82Bit matls tack CT (40600290)LB11,603$0.01$1.00$0.01$0.01$0.01
83Long joint sealant (40600370)LF9,540$3.26$2.00$3.70$3.00$3.92
84Mix CR JTS flangewys (40600400)TON8$410.51$500.00$850.00$500.00$901.00
85P HMA BC IL-4.75 N50 (40603200)TON689$186.71$176.00$132.75$189.00$140.72
86HMA SC IL-9.5 D N70 (40604062)TON147$171.32$200.00$154.00$210.00$163.24
87P HMA SC SMA 9.5 F N80 (40605026)TON1,079$175.10$176.00$152.00$178.00$161.12
88Incidental HMA surf (40800050)TON384$177.03$200.00$159.00$135.00$168.54
89Protective coat (42001300)SY300$1.00$0.01$5.50$3.00$2.56
90PCC driveway pavt 8 (42300400)SY814$100.00$85.00$128.70$106.00$162.00
91PC conc sidewalk 5 (42400200)SF18,618$14.00$12.00$11.55$13.00$13.41
92PC conc sidewalk 6 (42400300)SF370$15.00$13.00$12.60$14.00$14.05
93PC conc sidewalk 8 (42400410)SF2,350$16.00$15.00$13.90$12.50$18.77
94Pavement rem (44000100)SY2,971$40.00$25.00$25.00$12.00$26.44
95Drive pavement rem (44000200)SY764$35.00$20.00$25.00$16.00$18.00
96Comb curb gutter rem (44000500)LF3,562$6.00$7.00$15.00$8.90$9.70
97Sidewalk rem (44000600)SF30,633$4.00$2.00$3.00$2.00$3.17
98CL C patch T1 12 (44201373)SY150$140.00$210.00$90.00$120.00$251.16
99CL C patch T2 12 (44201377)SY150$140.00$180.00$90.00$120.00$248.72
100CL C patch T3 12 (44201381)SY200$140.00$170.00$90.00$120.00$247.50
101CL C patch T4 12 (44201383)SY305$140.00$165.00$90.00$120.00$245.06
102Storm sewer rem 6 (55100200)LF33$6.00$15.00$51.00$40.00$12.39
103Storm sewer rem 8 (55100300)LF86$8.00$15.00$51.00$40.00$12.39
104Storm sewer rem 12 (55100500)LF50$12.00$20.00$54.00$40.00$12.39
105D I water main 8 (56103100)LF360$275.00$300.00$227.00$141.00$205.09
106Water valves 8 (56105000)EACH2$10,000$5,000.00$3,885.00$5,200.00$4,001.73
107Fire hydnts to BE rem (56400500)EACH1$2,500.00$1,500.00$1,182.00$1,800.00$1,773.57
108Fire hyd W/aux V & VB (56400820)EACH1$10,500$12,500$10,843$11,000$12,900
109CB TA 4 dia T1F OL (60200105)EACH11$6,250.00$5,000.00$6,688.00$4,200.00$5,322.71
110Inlets TA T1F OL (60234200)EACH4$4,250.00$2,750.00$2,586.00$2,900.00$2,655.00
111VV TA 5 dia T1F CL (60248900)EACH2$4,500.00$7,500.00$8,149.00$5,500.00$5,667.97
112CB adjust (60250200)EACH10$1,000.00$900.00$650.00$650.00$1,705.50
113CB adj new T1F CL (60250500)EACH2$1,250.00$1,500.00$1,130.00$850.00$2,072.77
114CB reconst (60252800)EACH2$2,500.00$2,500.00$2,803.00$2,000.00$2,984.63
115CB cleaned (60255410)EACH2$1,000.00$750.00$500.00$500.00$520.00
116Man reconst (60257900)EACH2$2,500.00$3,500.00$2,803.00$2,000.00$2,984.63
117Inlets adjust (60260100)EACH12$1,000.00$900.00$650.00$600.00$1,279.12
118VV adjust (60265700)EACH3$1,000.00$900.00$825.00$600.00$1,705.50
119VV reconst (60266100)EACH4$2,000.00$5,000.00$2,803.00$2,000.00$2,558.25
120FR & lids adjust (60300305)EACH2$1,000.00$1,250.00$825.00$600.00$1,279.15
121Remov manholes (60500040)EACH2$1,250.00$750.00$1,647.00$400.00$639.56
122Remov catch bas (60500050)EACH4$1,000.00$500.00$1,647.00$400.00$639.57
123Remov inlets (60500060)EACH4$250.00$250.00$808.00$400.00$554.30
124Conc curb TB (60600605)LF2,531$52.00$75.00$41.25$59.00$44.00
125Comb CC&G TB6.12 (60603800)LF742$55.00$35.00$67.55$38.00$46.00
126Comb CC&G TM2.12 (60608300)LF1,038$53.00$35.00$65.80$38.00$45.00
127Conc median surf 4 (60618300)SF3,000$14.00$8.00$23.25$14.00$9.00
128Conc med TSB6.12 (60619600)SF900$20.00$21.00$23.25$22.00$35.73
129Non SPL waste disposl (66900200)CY2,350$29.00$90.00$69.50$72.00$128.54
130Soil disposal analy (66900530)EACH5$1,250.00$2,500.00$1,450.00$2,100.00$728.00
131Reg sub P-const plan (66901001)LS1$3,500.00$10,000$4,900.00$4,500.00$5,616.00
132Reg sub F con report (66901003)LS1$3,500.00$1,000.00$2,000.00$3,200.00$1,040.00
133Reg sub mon (66901006)CAL DAY60$150.00$1,650.00$1,250.00$1,250.00$728.00
134Engr field office A (67000400)CAL MO10$2,950.00$5,500.00$500.00$3,300.00$4,769.69
135Mobilization (67100100)LS1$359,000$329,298$329,000$346,178$379,705
136Changeable message SN (70107025)CAL DAY400$33.00$30.00$30.00$33.00$31.20
137Short term pavt mking (70300100)LF10,471$2.00$1.00$0.50$1.60$1.56
138SHRT TRM pavt MK rem (70300150)SF5,100$0.55$0.50$0.75$1.60$1.56
139Temp PVT MK LTR & sym paint (70300211)SF500$2.50$1.50$1.75$3.70$1.82
140Temp PVT MK line 4 - paint (70300221)LF8,000$0.40$0.52$1.40$0.70$1.46
141Temp PVT MK line 6 - paint (70300241)LF800$1.00$0.60$1.06$7.00$1.10
142Temp PVT MK line 24 - paint (70300281)LF2,300$2.00$1.50$1.00$4.00$1.04
143Sign panel T1 (72000100)SF316$24.00$27.00$30.00$33.00$31.20
144Remov sin pan assy TA (72400100)EACH38$150.00$45.00$105.00$250.00$109.20
145Teles STL sin support (72800100)LF410$20.00$17.00$18.00$22.00$18.72
146Metal post TY A (72900100)LF192$18.00$18.00$18.00$22.00$18.72
147Base tel STL sin supp (73100100)EACH41$260.00$225.00$110.00$660.00$114.40
148THPL PVT MK LTR & sym (78000100)SF271$7.00$6.00$5.75$6.60$5.98
149THPL PVT MK line 4 (78000200)LF4,144$2.00$0.92$1.35$1.10$1.40
150THPL PVT MK line 6 (78000400)LF816$3.25$1.50$1.72$2.00$1.79
151THPL PVT MK line 12 (78000600)LF1,140$4.00$3.00$3.32$3.30$3.45
152THPL PVT MK line 24 (78000650)LF668$6.00$6.00$5.75$6.60$5.98
153Raised refl pavt MKR (78100100)EACH434$38.00$46.75$35.60$55.00$37.02
154Raised ref PVT MK rem (78300200)EACH170$30.00$10.00$25.00$30.00$26.50
155PVT MKG rem WTR blast (78300202)SF1,000$3.25$3.85$4.50$7.00$4.68
156Elect serv install (80400100)EACH1$2,500.00$5,412.16$5,412.16$5,900.00$5,863.26
157Elect util serv conn (80400200)LS1$10,000$10,000$10,000$10,000$10,000
158Undrgrd C galvs 2 (81028200)LF398$49.00$29.46$29.46$31.00$31.92
159Undrgrd C galvs 2 1/2 (81028210)LF195$64.50$42.59$42.59$45.00$46.14
160Undrgrd C galvs 3 (81028220)LF30$84.00$56.72$56.72$61.00$61.45
161Undrgrd C galvs 4 (81028240)LF68$115.00$76.35$76.35$82.00$82.71
162Undrgrd C PVC 2 (81028350)LF1,785$16.50$25.00$25.00$27.00$27.08
163Undrgrd C CNC 1 1/4 (81028730)LF1,785$19.50$24.54$24.54$27.00$26.59
164Handhole (81400100)EACH2$3,280.00$3,849.12$3,849.12$4,100.00$4,169.94
165Handhole C conc (81400730)EACH1$1,750.00$1,488.80$1,488.80$1,650.00$1,612.89
166EC C XLP use 1C 8 (81702120)LF13,105$2.06$2.97$2.97$3.10$3.22
167EC C XLP use 1C 2 (81702150)LF400$8.00$6.95$6.95$7.80$7.53
168EC C XLP use 1C 2/0 (81702170)LF190$17.50$11.28$11.28$13.00$12.22
169LT cont basem 240V100 (82500350)EACH1$18,700$17,706$17,706$19,000$19,182
170LT P A 35MH 15DA (83001600)EACH10$8,200.00$8,140.24$8,140.24$9,000.00$8,818.73
171LP F M 15BC 8 5/8 X 7 (83600345)EACH7$1,250.00$1,890.80$1,890.80$2,200.00$2,048.40
172Rem pole FDN (84200804)EACH15$692.00$933.04$933.04$110.00$1,010.81
173Main EX TR sig instal (85000200)EACH2$3,760.00$10,830$10,830$13,000$11,733
174Elcbl C lead 14 1PR (87301305)LF843$2.45$5.13$5.13$5.75$5.56
175Elcbl C serv 6 2C (87301805)LF400$6.50$6.70$6.70$7.00$7.26
176Elcbl C serv 10 3C (87301885)LF1,073$5.50$5.86$5.86$7.00$6.35
177Elcbl C egrdc 6 1C (87301900)LF1,057$3.25$6.78$6.78$7.00$7.35
178TS post 16 (87501200)EACH1$2,390.00$2,160.48$2,160.48$2,250.00$2,340.55
179S maa & P 22 (87700150)EACH1$15,400$14,951$14,951$16,000$16,197
180S maa & P 26 (87700170)EACH1$15,800$15,283$15,283$17,500$16,557
181Conc FDN TY A (87800100)LF4$559.00$321.76$321.76$350.00$348.58
182Conc FDN TY E 30D (87800400)LF20$620.00$357.76$357.76$380.00$387.58
183Inductive loop detect (88500100)EACH2$182.00$166.80$166.80$200.00$180.71
184Det loop T1 (88600100)LF149$38.50$41.06$41.06$45.00$44.48
185Rebuild EX handhole (89502376)EACH1$2,500.00$2,712.08$2,712.08$3,000.00$2,938.14
IDOT contract 61L92: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of November 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy