IDOT contract 70D62 bid tabulation
Section (101)BR. Let by Illinois DOT on June 12, 2026, Edgar, District 05. 2 bids received; low bid $7,986,429 by William Charles Construction Company, LLC.
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 119
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | William Charles Construction Company, LLC | $7,986,429 | Low |
| 2 | Sangamo Construction Company | $8,768,622 | +10% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. William Charles Construction Company, LLC | 2. Sangamo Construction Company |
|---|---|---|---|---|---|
| 1 | HMA surf rem SPL (X4400196) | SY | 582 | $11.80 | $26.91 |
| 2 | HMA surf rem var DP (X4401198) | SY | 296 | $8.78 | $37.05 |
| 3 | Conc wearing surf 5 (X5030305) | SY | 253 | $275.00 | $184.46 |
| 4 | Prec bridge app slab (X5040100) | SF | 2,150 | $72.00 | $80.40 |
| 5 | Bar terminators (X5080530) | EACH | 512 | $42.00 | $31.44 |
| 6 | Pipe drain removal (X6010003) | LF | 362 | $11.00 | $23.88 |
| 7 | Fill inlets temporary (X6050222) | EACH | 14 | $800.00 | $2,278.49 |
| 8 | Remove inlet box (X6050700) | EACH | 10 | $800.00 | $1,078.56 |
| 9 | Centerln rum strip 8 (X6420112) | LF | 2,848 | $0.40 | $0.70 |
| 10 | Width restrict sign (X7200201) | LS | 1 | $3,600.00 | $3,830.29 |
| 11 | Construction layout (Z0013798) | LS | 1 | $75,000 | $70,046 |
| 12 | Pavt crackng & seatng (Z0037000) | SY | 2,633 | $10.00 | $7.28 |
| 13 | Permnt bench marks (Z0038700) | EACH | 1 | $1,500.00 | $150.86 |
| 14 | RR prot liability ins (Z0048665) | LS | 1 | $50,000 | $20,581 |
| 15 | Trainees (Z0076600) | HR | 2,000 | $0.80 | $0.80 |
| 16 | Trainees TPG (Z0076604) | HR | 2,000 | $15.00 | $15.00 |
| 17 | Earth excavation (20200100) | CY | 485 | $80.00 | $143.45 |
| 18 | Furnished excavation (20400800) | CY | 2,815 | $60.00 | $101.18 |
| 19 | Gran embank spec (21000300) | TON | 1,402 | $85.00 | $88.71 |
| 20 | Seeding CL 2A (25000210) | ACRE | 3 | $2,395.00 | $2,527.73 |
| 21 | Nitrogen fert nutr (25000400) | LB | 270 | $1.70 | $1.79 |
| 22 | Phosphorus fert nutr (25000500) | LB | 270 | $1.70 | $1.79 |
| 23 | Potassium fert nutr (25000600) | LB | 270 | $1.70 | $1.79 |
| 24 | Mulch method 2 (25100115) | ACRE | 3 | $1,595.00 | $1,683.39 |
| 25 | Temp eros contr seed (28000250) | LB | 1,200 | $10.00 | $3.71 |
| 26 | Temp ditch checks (28000305) | LF | 690 | $16.00 | $25.07 |
| 27 | Perimeter eros bar (28000400) | LF | 4,336 | $3.75 | $7.23 |
| 28 | Inlet & pipe protect (28000500) | EACH | 4 | $300.00 | $451.88 |
| 29 | Stab subbase 4 (31200100) | SY | 231 | $230.00 | $238.31 |
| 30 | Agg surf course TY B (40200800) | TON | 115 | $95.00 | $60.45 |
| 31 | Bit matls PR CT (40600275) | LB | 5,948 | $1.61 | $1.69 |
| 32 | Bit matls tack CT (40600290) | LB | 8,975 | $3.90 | $6.07 |
| 33 | Long joint sealant (40600370) | LF | 3,069 | $9.00 | $9.50 |
| 34 | Matl transfer device (40600405) | TON | 2,668 | $0.01 | $8.39 |
| 35 | Temporary ramp (40600990) | SY | 99 | $100.00 | $78.63 |
| 36 | HMA BC IL-19.0 N50 (40603080) | TON | 1,214 | $178.12 | $207.76 |
| 37 | P HMA BC IL19.0 N50 (40603230) | TON | 478 | $197.78 | $251.03 |
| 38 | P HMA SC IL-9.5 D N50 (40604160) | TON | 1,334 | $239.66 | $241.00 |
| 39 | Bit matls tack CT (40800029) | LB | 262 | $2.04 | $13.03 |
| 40 | Incidental HMA surf (40800050) | TON | 49 | $792.03 | $657.53 |
| 41 | Welded wire reinf (42000060) | SY | 264 | $18.00 | $20.44 |
| 42 | PVT con PCC BR app SL (42000080) | SY | 264 | $260.00 | $235.69 |
| 43 | Pavement rem (44000100) | SY | 457 | $40.00 | $76.74 |
| 44 | HMA surf rem 3 (44000161) | SY | 3,798 | $10.18 | $13.83 |
| 45 | HMA surf rem 8 (44000182) | SY | 1,454 | $14.03 | $20.95 |
| 46 | Curb rem (44000300) | LF | 4,082 | $5.00 | $1.68 |
| 47 | Paved SHLD removal (44004250) | SY | 6,302 | $16.00 | $15.36 |
| 48 | Agg wedge SHLD type B (48102100) | TON | 118 | $188.75 | $71.32 |
| 49 | HMA shoulders 6 1/2 (48203023) | SY | 3,473 | $66.32 | $76.83 |
| 50 | HMA shoulders (48203100) | TON | 652 | $169.18 | $217.10 |
| 51 | Rem exist struct (50100100) | EACH | 1 | $260,000 | $508,530 |
| 52 | Pipe culvert remov (50105220) | LF | 234 | $40.00 | $26.03 |
| 53 | Protective shield (50157300) | SY | 326 | $120.00 | $1.00 |
| 54 | Structure excavation (50200100) | CY | 277 | $90.00 | $42.09 |
| 55 | Conc struct (50300225) | CY | 313.30 | $1,500.00 | $1,549.16 |
| 56 | Conc sup-STR (50300255) | CY | 398.50 | $1,800.00 | $2,117.47 |
| 57 | BR deck grooving (50300260) | SY | 1,210 | $16.00 | $11.93 |
| 58 | Protective coat (50300300) | SY | 1,546 | $3.00 | $3.62 |
| 59 | F & E struct steel (50500105) | LS | 1 | $1,523,500 | $1,644,295 |
| 60 | Stud shear connectors (50500505) | EACH | 4,914 | $4.00 | $4.19 |
| 61 | Reinf bars, epoxy CTD (50800205) | LB | 123,750 | $2.20 | $1.73 |
| 62 | Bar splicers (50800515) | EACH | 1,022 | $36.00 | $42.09 |
| 63 | Slope wall 4 (51100100) | SY | 987 | $235.00 | $232.93 |
| 64 | Fur STL pile HP12X63 (51201610) | LF | 1,999 | $130.00 | $134.21 |
| 65 | Driving piles (51202305) | LF | 1,999 | $1.00 | $0.03 |
| 66 | Test pile ST HP12X63 (51203610) | EACH | 4 | $15,000 | $10,333 |
| 67 | Pile shoes (51204650) | EACH | 32 | $150.00 | $244.26 |
| 68 | Name plates (51500100) | EACH | 1 | $1,500.00 | $1,059.72 |
| 69 | Pref JT strip seal (52000110) | LF | 104 | $315.00 | $339.56 |
| 70 | Anchor bolts 1 (52100520) | EACH | 48 | $140.00 | $105.86 |
| 71 | Temp SHT piling (52200010) | SF | 1,343 | $65.00 | $62.81 |
| 72 | Geotex retain wall (52200600) | SF | 1,199 | $48.00 | $88.26 |
| 73 | HMA surface RM (deck) (53004556) | SY | 384 | $15.26 | $19.00 |
| 74 | P cul CL D 2 24 (542D1069) | LF | 252 | $80.00 | $79.71 |
| 75 | End sections 24 (54213459) | EACH | 4 | $1,100.00 | $516.65 |
| 76 | Metal FL end sec 12" (54262712) | EACH | 18 | $375.00 | $557.33 |
| 77 | Granular backfill STR (58600101) | CY | 213 | $120.00 | $96.73 |
| 78 | Geocomposite wall DR (59100100) | SY | 110 | $40.00 | $31.19 |
| 79 | Conc HDWL for P drain (60100060) | EACH | 12 | $500.00 | $315.67 |
| 80 | Pipe drains 6 (60100915) | LF | 512 | $46.00 | $40.18 |
| 81 | Pipe drains 12 (60100945) | LF | 879 | $53.00 | $42.04 |
| 82 | Pipe underdr T 2 6 (60108206) | LF | 230 | $36.00 | $50.70 |
| 83 | P undr for struct 4 (60146304) | LF | 193 | $25.00 | $39.33 |
| 84 | Conc curb TB (60600605) | LF | 4,015 | $52.00 | $44.76 |
| 85 | Conc thrust blocks (61000050) | EACH | 18 | $1,000.00 | $656.52 |
| 86 | TY E inlet box 610001 (61000115) | EACH | 18 | $4,500.00 | $7,601.89 |
| 87 | SPBGR TY A 6FT posts (63000001) | LF | 13 | $67.25 | $42.22 |
| 88 | Traf bar term T6 (63100085) | EACH | 4 | $5,100.00 | $6,678.72 |
| 89 | TR bar TRM T1 SPL tan (63100167) | EACH | 1 | $4,575.00 | $3,905.05 |
| 90 | Guardrail remov (63200310) | LF | 25 | $24.10 | $10.55 |
| 91 | Rem RE-E SPBGR TY A (63301210) | LF | 3,663 | $22.50 | $26.39 |
| 92 | Rem RE-E T B term T1 (63301990) | EACH | 3 | $3,750.00 | $2,638.55 |
| 93 | Shoulder rum strip 8 (64200108) | LF | 5,572 | $0.85 | $1.65 |
| 94 | Non SPL waste disposl (66900200) | CY | 614 | $50.00 | $40.23 |
| 95 | Soil disposal analy (66900530) | EACH | 2 | $1,750.00 | $1,899.76 |
| 96 | Reg sub P-const plan (66901001) | LS | 1 | $2,300.00 | $3,166.26 |
| 97 | Reg sub F con report (66901003) | LS | 1 | $2,300.00 | $1,055.42 |
| 98 | Reg sub mon (66901006) | CAL DAY | 22 | $1,250.00 | $1,424.82 |
| 99 | Engr field office B (67000500) | CAL MO | 14 | $3,500.00 | $2,951.57 |
| 100 | Mobilization (67100100) | LS | 1 | $475,000 | $517,349 |
| 101 | Traf cont-prot 701321 (70100405) | EACH | 1 | $60,000 | $32,795 |
| 102 | Traf cont-prot 701201 (70100450) | LS | 1 | $15,000 | $11,036 |
| 103 | Traf cont-prot 701306 (70100460) | LS | 1 | $15,000 | $4,236.01 |
| 104 | Temp BR traf signals (70106500) | EACH | 1 | $75,000 | $52,771 |
| 105 | Changeable message SN (70107025) | CAL DAY | 28 | $200.00 | $204.28 |
| 106 | Short term pavt mking (70300100) | LF | 1,792 | $5.00 | $3.54 |
| 107 | SHRT TRM pavt MK rem (70300150) | SF | 598 | $3.00 | $3.31 |
| 108 | Temp PVT MK line 4 - paint (70300221) | LF | 11,174 | $0.42 | $0.44 |
| 109 | Temp conc barrier (70400100) | LF | 2,050 | $55.25 | $53.44 |
| 110 | Pin temp conc barrier (70400125) | EACH | 910 | $16.75 | $30.41 |
| 111 | Rel temp conc barrier (70400200) | LF | 2,050 | $6.45 | $9.68 |
| 112 | Imp attn temp NRD TL3 (70600250) | EACH | 2 | $7,500.00 | $11,195 |
| 113 | Imp attn rel NRD TL3 (70600350) | EACH | 1 | $1,500.00 | $1,610.61 |
| 114 | Terminal marker - DA (72501000) | EACH | 1 | $42.00 | $52.77 |
| 115 | Paint PVT MK line 4 (78001110) | LF | 4,465 | $0.55 | $0.58 |
| 116 | Raised refl pavt MKR (78100100) | EACH | 59 | $101.00 | $106.60 |
| 117 | Barr wall ref type C (78200011) | EACH | 164 | $10.00 | $13.22 |
| 118 | Raised ref PVT MK rem (78300200) | EACH | 47 | $100.00 | $33.03 |
| 119 | PVT MKG rem WTR blast (78300202) | SF | 1,489 | $5.00 | $5.28 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.