IDOT contract 70H61 bid tabulation
Section (240B)BR-1. Let by Illinois DOT on February 27, 2026, Champaign, District 05. 2 bids received; low bid $414,045 by Stark Excavating, Inc..
- Owner
- Illinois DOT
- Letting
- 27 FEB 2026
- Pay items
- 14
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Stark Excavating, Inc. | $414,045 | Low |
| 2 | Sangamo Construction Company | $515,950 | +25% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Stark Excavating, Inc. | 2. Sangamo Construction Company |
|---|---|---|---|---|---|
| 1 | Rem EX PPC deck beams (X5010010) | SF | 795 | $80.00 | $100.32 |
| 2 | Conc wearing surf rem (X5030275) | SY | 119 | $0.01 | $206.92 |
| 3 | Conc wearing surf 5 (X5030305) | SY | 119 | $465.00 | $280.29 |
| 4 | Rem & RE-E EX BR rail (X5091742) | LF | 265 | $150.00 | $152.32 |
| 5 | Detour signing (X7200203) | LS | 1 | $10,000 | $11,086 |
| 6 | Construction layout (Z0013798) | LS | 1 | $1,300.00 | $3,840.24 |
| 7 | Protective coat (50300300) | SY | 119 | $6.00 | $4.89 |
| 8 | P P conc DK BM 21 DP (50400405) | SF | 795 | $220.00 | $302.77 |
| 9 | Reinf bars, epoxy CTD (50800205) | LB | 1,530 | $4.00 | $3.51 |
| 10 | Mechanical splicers (50800530) | EACH | 268 | $40.00 | $58.58 |
| 11 | STR rep con DP = < 5 (53212754) | SF | 102 | $185.00 | $200.12 |
| 12 | Engr field office B (67000500) | CAL MO | 3 | $2,100.00 | $2,663.78 |
| 13 | Mobilization (67100100) | LS | 1 | $24,825 | $30,441 |
| 14 | Changeable message SN (70107025) | CAL DAY | 14 | $115.00 | $123.44 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.