IDOT contract 74705 bid tabulation
Section (58-63HVB)BR. Let by Illinois DOT on June 12, 2026, Macon, District 07. 3 bids received; low bid $18,795,822 by William Charles Construction Company, LLC.
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 115
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | William Charles Construction Company, LLC | $18,795,822 | Low |
| 2 | Sangamo Construction Company | $18,955,053 | +1.0% |
| 3 | Freesen, a div of UCM, Inc. | $20,695,113 | +10% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. William Charles Construction Company, LLC | 2. Sangamo Construction Company | 3. Freesen, a div of UCM, Inc. |
|---|---|---|---|---|---|---|
| 1 | Seeding CL 2 SPL (X2501000) | ACRE | 0.75 | $4,500.00 | $10,410 | $10,369 |
| 2 | Temp pavt removal (X4400110) | SY | 270 | $73.00 | $52.71 | $18.80 |
| 3 | BR deck grooving long (X5030250) | SY | 3,329 | $18.00 | $8.63 | $11.36 |
| 4 | Conc wearing surf 5 (X5030305) | SY | 873 | $225.00 | $126.88 | $275.18 |
| 5 | Prec bridge app slab (X5040100) | SF | 7,531 | $66.00 | $69.85 | $61.81 |
| 6 | Bar terminators (X5080530) | EACH | 1,246 | $36.00 | $25.37 | $27.77 |
| 7 | Drainage scuppr DS-11 (X5230174) | EACH | 8 | $3,000.00 | $2,264.62 | $3,152.55 |
| 8 | Fill exist culverts (X6050208) | CY | 10 | $500.00 | $747.15 | $410.47 |
| 9 | TC-prot 701402 SPL (X7010208) | EACH | 2 | $55,000 | $125,168 | $101,152 |
| 10 | Detour signing (X7200203) | LS | 1 | $6,700.00 | $7,891.64 | $12,705 |
| 11 | Temp raised pavt MKR (X7810400) | EACH | 672 | $55.00 | $26.36 | $42.00 |
| 12 | RRPM reflector removl (X7830050) | EACH | 21 | $35.00 | $15.70 | $17.36 |
| 13 | Diamond grind BR sec (Z0029090) | SY | 4,301 | $25.00 | $12.68 | $16.14 |
| 14 | RR prot liability ins (Z0048665) | LS | 1 | $60,000 | $32,538 | $32,297 |
| 15 | Prot reset survey MRK (Z0049799) | EACH | 2 | $2,500.00 | $559.29 | $780.27 |
| 16 | Temp pavement (Z0062456) | SY | 270 | $184.00 | $138.10 | $138.41 |
| 17 | Temp support system (Z0073400) | EACH | 4 | $12,000 | $3,697.98 | $6,695.10 |
| 18 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 | $0.80 |
| 19 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 | $15.00 |
| 20 | Earth excavation (20200100) | CY | 101 | $130.00 | $58.25 | $121.37 |
| 21 | Trench backfill (20800150) | CY | 1,573 | $130.00 | $134.37 | $136.72 |
| 22 | Temp eros contr seed (28000250) | LB | 117 | $14.00 | $4.07 | $7.62 |
| 23 | Temp ditch checks (28000305) | LF | 58 | $24.00 | $25.91 | $67.26 |
| 24 | Perimeter eros bar (28000400) | LF | 2,271 | $8.00 | $7.21 | $10.35 |
| 25 | Inlet & pipe protect (28000500) | EACH | 2 | $180.00 | $216.83 | $489.32 |
| 26 | P bit matls tack CT (40600295) | LB | 2,964 | $1.26 | $1.33 | $1.26 |
| 27 | Long joint sealant (40600370) | LF | 1,552 | $24.81 | $26.15 | $24.81 |
| 28 | HMA surf rem butt JT (40600982) | SY | 72 | $35.00 | $11.86 | $7.86 |
| 29 | PCC surf rem butt JT (40600985) | SY | 23 | $50.00 | $19.39 | $12.31 |
| 30 | Temporary ramp (40600990) | SY | 1,115 | $35.00 | $49.29 | $23.35 |
| 31 | P HMA BC IL-9.5FG N90 (40603219) | TON | 373 | $425.94 | $449.03 | $425.94 |
| 32 | P HMA SC IL-9.5 D N90 (40604164) | TON | 429 | $398.42 | $420.02 | $398.42 |
| 33 | PVT con PCC BR app SL (42000080) | SY | 551 | $345.00 | $248.40 | $400.97 |
| 34 | Pavement rem (44000100) | SY | 5,606 | $36.00 | $22.93 | $20.33 |
| 35 | HMA surf rem 2 (44000157) | SY | 3,709 | $12.00 | $13.09 | $17.65 |
| 36 | Aggregate SHLDS B 4 (48101498) | SY | 265 | $45.00 | $20.53 | $23.71 |
| 37 | HMA shoulders 8 (48203029) | SY | 433 | $196.34 | $206.98 | $196.34 |
| 38 | HMA shoulders (48203100) | TON | 156 | $325.59 | $343.24 | $325.59 |
| 39 | PCC shoulders 11 3/4 (48300615) | SY | 4,648 | $130.00 | $133.87 | $140.29 |
| 40 | Rem exist struct N1 (50100300) | EACH | 1 | $435,250 | $554,302 | $661,869 |
| 41 | Rem exist struct N2 (50100400) | EACH | 1 | $452,000 | $606,167 | $661,869 |
| 42 | Slope wall remov (50104650) | SY | 2,980 | $21.00 | $24.13 | $43.83 |
| 43 | Pipe culvert remov (50105220) | LF | 714 | $75.00 | $102.80 | $33.59 |
| 44 | Protective shield (50157300) | SY | 2,415 | $42.00 | $1.00 | $109.38 |
| 45 | Structure excavation (50200100) | CY | 825 | $77.00 | $47.46 | $88.31 |
| 46 | Conc struct (50300225) | CY | 851.30 | $0.01 | $722.37 | $1,580.35 |
| 47 | Conc sup-STR (50300255) | CY | 1,277.40 | $2,400.00 | $1,944.71 | $2,061.37 |
| 48 | Protective coat (50300300) | SY | 5,177 | $2.65 | $3.32 | $5.38 |
| 49 | F & E struct steel (50500105) | LS | 1 | $6,655,000 | $6,374,875 | $6,463,081 |
| 50 | Stud shear connectors (50500505) | EACH | 22,610 | $5.20 | $4.61 | $4.46 |
| 51 | Reinf bars, epoxy CTD (50800205) | LB | 467,610 | $2.00 | $1.67 | $1.92 |
| 52 | Bar splicers (50800515) | EACH | 2,412 | $45.00 | $40.53 | $34.92 |
| 53 | Mechanical splicers (50800530) | EACH | 484 | $135.00 | $83.43 | $84.47 |
| 54 | Slope wall 4 (51100100) | SY | 2,768 | $250.00 | $185.51 | $244.29 |
| 55 | Fur M S pile 14X0.312 (51200959) | LF | 5,831 | $49.00 | $116.09 | $120.06 |
| 56 | Fur M S pile 16X0.375 (51200963) | LF | 2,805 | $65.00 | $145.22 | $140.73 |
| 57 | Driving piles (51202305) | LF | 8,636 | $0.01 | $0.02 | $0.01 |
| 58 | Test pile met shells (51203200) | EACH | 6 | $15,000 | $11,597 | $27,725 |
| 59 | Name plates (51500100) | EACH | 2 | $1,250.00 | $1,019.79 | $1,621.85 |
| 60 | Pref JT strip seal (52000110) | LF | 263 | $275.00 | $254.19 | $268.25 |
| 61 | Anchor bolts 1 (52100520) | EACH | 76 | $144.00 | $115.91 | $117.20 |
| 62 | Anchor bolts 1 1/4 (52100530) | EACH | 38 | $211.00 | $146.91 | $152.69 |
| 63 | Temp SHT piling (52200010) | SF | 2,680 | $0.01 | $38.00 | $40.85 |
| 64 | Temp soil reten systm (52200020) | SF | 1,876 | $0.01 | $1.00 | $31.34 |
| 65 | Drainage system for structures (52318802) | LS | 1 | $44,000 | $29,580 | $41,511 |
| 66 | P cul CL A 2 36 (542A1081) | LF | 361 | $292.00 | $273.46 | $481.81 |
| 67 | P cul CL A 3 36 (542A1921) | LF | 343 | $306.00 | $283.16 | $457.32 |
| 68 | PRC flar end sec 36 (54213681) | EACH | 4 | $3,350.00 | $2,685.84 | $4,271.59 |
| 69 | Storm sewer rem 15 (55100700) | LF | 377 | $59.00 | $31.57 | $42.40 |
| 70 | Granular backfill STR (58600101) | CY | 600 | $145.00 | $102.05 | $122.23 |
| 71 | Concrete sealer (58700300) | SF | 1,848 | $3.00 | $2.77 | $4.33 |
| 72 | Geocomposite wall DR (59100100) | SY | 290 | $54.00 | $26.27 | $49.84 |
| 73 | P undr for struct 4 (60146304) | LF | 424 | $38.00 | $30.07 | $93.78 |
| 74 | Remov inlets (60500060) | EACH | 13 | $900.00 | $390.97 | $613.22 |
| 75 | SPBGR TY A 6FT posts (63000001) | LF | 938 | $36.00 | $63.23 | $58.80 |
| 76 | Traf bar term T2 (63100045) | EACH | 2 | $2,300.00 | $2,523.64 | $2,415.00 |
| 77 | Traf bar term T6 (63100085) | EACH | 6 | $4,900.00 | $9,060.23 | $7,875.00 |
| 78 | TR bar TRM T1 SPL tan (63100167) | EACH | 4 | $4,300.00 | $5,271.06 | $5,250.00 |
| 79 | Guardrail remov (63200310) | LF | 1,403 | $7.00 | $5.27 | $5.25 |
| 80 | R&R rail elem EX GDRL (63300575) | LF | 270 | $24.00 | $33.73 | $33.60 |
| 81 | Rem RE-E SPBGR TY A (63301210) | LF | 1,055 | $27.00 | $29.79 | $23.10 |
| 82 | Rem RE-E T B term T1 (63301990) | EACH | 4 | $3,800.00 | $2,108.42 | $2,100.00 |
| 83 | Rem RE-E T B term T2 (63302000) | EACH | 2 | $2,200.00 | $1,897.58 | $1,890.00 |
| 84 | Rem RE-E T B term T6 (63302700) | EACH | 6 | $3,900.00 | $2,846.37 | $2,835.00 |
| 85 | Shoulder rum strip 16 (64200116) | LF | 1,300 | $6.91 | $9.30 | $12.79 |
| 86 | Engr field office A (67000400) | CAL MO | 18 | $4,500.00 | $2,827.41 | $4,592.32 |
| 87 | Mobilization (67100100) | LS | 1 | $1,125,000 | $1,118,348 | $772,182 |
| 88 | Traf cont-prot 701401 (70100205) | EACH | 4 | $5,500.00 | $17,158 | $10,400 |
| 89 | Traf cont-prot 701421 (70100310) | LS | 1 | $100.00 | $46,369 | $12,776 |
| 90 | Traf cont-prot 701422 (70100315) | EACH | 2 | $15,750 | $52,765 | $28,264 |
| 91 | Traf cont-prot 701411 (70100420) | EACH | 2 | $1,250.00 | $5,845.42 | $4,856.25 |
| 92 | Traf cont-prot 701451 (70100820) | LS | 1 | $2,250.00 | $3,379.03 | $6,247.50 |
| 93 | Pavt MK blkout tape 5 (70107005) | LF | 5,441 | $2.50 | $2.37 | $2.15 |
| 94 | Pavt MK blkout tape 7 (70107007) | LF | 1,312 | $4.00 | $2.90 | $3.15 |
| 95 | Pavt MK blkout tape 9 (70107009) | LF | 981 | $5.00 | $3.16 | $4.10 |
| 96 | Changeable message SN (70107025) | CAL DAY | 56 | $100.00 | $117.79 | $105.00 |
| 97 | Short term pavt mking (70300100) | LF | 1,744 | $3.00 | $1.82 | $1.53 |
| 98 | SHRT TRM pavt MK rem (70300150) | SF | 4,204 | $8.25 | $3.02 | $2.31 |
| 99 | Temp PVT MK line 4 - paint (70300221) | LF | 34,802 | $0.60 | $0.84 | $0.61 |
| 100 | Temp PVT MK line 6 - paint (70300241) | LF | 490 | $1.00 | $2.11 | $1.05 |
| 101 | Temp PVT MK line 8 - paint (70300251) | LF | 480 | $2.00 | $4.22 | $2.10 |
| 102 | Temp conc barrier (70400100) | LF | 1,600 | $55.00 | $66.87 | $59.15 |
| 103 | Rel temp conc barrier (70400200) | LF | 1,063 | $48.00 | $9.02 | $3.66 |
| 104 | Imp attn temp NRD TL3 (70600250) | EACH | 2 | $9,500.00 | $10,247 | $12,611 |
| 105 | Imp attn rel NRD TL3 (70600350) | EACH | 2 | $1,300.00 | $1,489.39 | $2,132.45 |
| 106 | Terminal marker - DA (72501000) | EACH | 4 | $50.00 | $73.80 | $73.50 |
| 107 | Pref PL PM TD STD L 6 (78004630) | LF | 3,474 | $5.60 | $8.43 | $5.81 |
| 108 | Pref PL PM TD STD L 8 (78004640) | LF | 480 | $7.00 | $12.65 | $7.26 |
| 109 | GRV RCSD PVT MRKG 7 (78011035) | LF | 3,474 | $3.50 | $3.16 | $3.41 |
| 110 | GRV RCSD PVT MRKG 9 (78011045) | LF | 480 | $5.00 | $6.33 | $3.68 |
| 111 | Raised refl pavt MKR (78100100) | EACH | 33 | $120.00 | $368.97 | $78.05 |
| 112 | Grdrail ref type A (78200005) | EACH | 19 | $25.00 | $10.54 | $10.50 |
| 113 | Barr wall ref type C (78200011) | EACH | 32 | $60.00 | $10.54 | $26.65 |
| 114 | Raised ref PVT MK rem (78300200) | EACH | 22 | $68.00 | $12.07 | $47.32 |
| 115 | PVT MKG rem WTR blast (78300202) | SF | 13,042 | $1.50 | $3.16 | $1.42 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.