IDOT contract 68J14 bid tabulation
Section D4. Let by Illinois DOT on August 1, 2025, Fulton, District 04. 4 bids received; low bid $2,366,430 by Freesen, a div of UCM, Inc..
- Owner
- Illinois DOT
- Letting
- 01 AUG 2025
- Pay items
- 57
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Freesen, a div of UCM, Inc. | $2,366,430 | Low |
| 2 | Stark Excavating, Inc. | $2,499,743 | +6.0% |
| 3 | Brandt Construction Co. | $2,693,250 | +14% |
| 4 | Laverdiere Construction, Inc. | $3,053,691 | +29% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Freesen, a div of UCM, Inc. | 2. Stark Excavating, Inc. | 3. Brandt Construction Co. | 4. Laverdiere Construction, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Surface filler SPL (X0326444) | GAL | 4 | $1,725.49 | $1,200.00 | $1,500.00 | $1,510.00 |
| 2 | Clean app slab drain (X1300003) | EACH | 4 | $349.65 | $375.00 | $2,500.00 | $2,000.00 |
| 3 | Pavt removal SPL (X4404400) | SY | 129 | $56.53 | $165.00 | $40.00 | $80.00 |
| 4 | Protective coat SPL (X5030550) | SY | 668 | $66.48 | $46.00 | $60.00 | $24.00 |
| 5 | GDRL agg eros cont (Z0001002) | TON | 943 | $127.57 | $95.00 | $105.00 | $69.00 |
| 6 | BR deck scar 3/4 (Z0012130) | SY | 2,456 | $78.23 | $84.00 | $120.00 | $78.00 |
| 7 | BR DK mic C ovl 2 1/4 (Z0012162) | SY | 2,456 | $143.80 | $170.00 | $180.00 | $203.00 |
| 8 | Construction layout (Z0013798) | LS | 1 | $7,577.54 | $16,250 | $15,000 | $11,500 |
| 9 | Polymer concrete (Z0041895) | CF | 10.30 | $1,678.54 | $1,500.00 | $4,500.00 | $1,066.00 |
| 10 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 | $0.80 | $0.80 |
| 11 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 | $15.00 | $15.00 |
| 12 | Exc & GR EX shoulder (20200600) | UNIT | 18 | $3,577.42 | $1,650.00 | $2,300.00 | $3,935.00 |
| 13 | Agg subgrade impr 12 (30300112) | SY | 721 | $109.03 | $56.00 | $77.00 | $125.00 |
| 14 | P bit matls tack CT (40600295) | LB | 2,585 | $7.74 | $8.75 | $1.00 | $9.00 |
| 15 | HMA surf rem butt JT (40600982) | SY | 1,860 | $58.40 | $65.00 | $45.00 | $65.00 |
| 16 | Temporary ramp (40600990) | SY | 297 | $69.50 | $75.00 | $105.00 | $90.00 |
| 17 | P HMA BC IL-9.5 N50 (40603205) | TON | 145.10 | $885.75 | $1,000.00 | $665.00 | $1,019.00 |
| 18 | P HMA SC IL-9.5 D N50 (40604160) | TON | 156.50 | $833.07 | $950.00 | $665.00 | $958.00 |
| 19 | Curb rem (44000300) | LF | 240 | $12.22 | $30.00 | $60.00 | $25.00 |
| 20 | Paved SHLD removal (44004250) | SY | 721 | $88.34 | $38.00 | $45.00 | $102.00 |
| 21 | CL D patch T4 13 (44201809) | SY | 132 | $507.04 | $600.00 | $765.00 | $634.00 |
| 22 | HMA shoulders 8 (48203029) | SY | 721 | $206.08 | $235.00 | $170.00 | $250.00 |
| 23 | BR deck grooving (50300260) | SY | 2,317 | $14.23 | $12.50 | $8.50 | $15.00 |
| 24 | Protective coat (50300300) | SY | 2,459 | $4.61 | $6.00 | $12.00 | $5.00 |
| 25 | Inlets adjust (60260100) | EACH | 10 | $1,457.00 | $2,000.00 | $3,100.00 | $1,257.00 |
| 26 | Conc curb TB (60600605) | LF | 240 | $68.43 | $100.00 | $95.00 | $73.00 |
| 27 | SPBGR TY A 6FT posts (63000001) | LF | 2,439 | $33.60 | $37.00 | $35.00 | $40.00 |
| 28 | Traf bar term T6 (63100085) | EACH | 16 | $3,570.00 | $3,800.00 | $3,820.00 | $4,250.00 |
| 29 | TR bar TRM T1 SPL tan (63100167) | EACH | 14 | $2,835.00 | $3,000.00 | $3,035.00 | $3,375.00 |
| 30 | TR bar TRM T1 SPL FLR (63100169) | EACH | 2 | $2,835.00 | $3,000.00 | $3,035.00 | $3,375.00 |
| 31 | Guardrail remov (63200310) | LF | 3,428 | $8.08 | $6.75 | $15.00 | $17.00 |
| 32 | Engr field office A (67000400) | CAL MO | 12 | $3,583.06 | $2,500.00 | $4,000.00 | $3,350.00 |
| 33 | Mobilization (67100100) | LS | 1 | $106,188 | $149,980 | $140,000 | $280,000 |
| 34 | Traf cont-prot 701321 (70100405) | EACH | 4 | $10,500 | $15,000 | $9,000.00 | $10,000 |
| 35 | Traf cont-prot 701201 (70100450) | LS | 1 | $997.50 | $1,200.00 | $10.00 | $30,160 |
| 36 | Traf cont-prot 701306 (70100460) | LS | 1 | $997.50 | $1,075.00 | $10.00 | $3,800.00 |
| 37 | Traf cont-prot 701326 (70100500) | LS | 1 | $997.50 | $2,550.00 | $10.00 | $4,800.00 |
| 38 | TR cont surveillance (70103815) | CAL DAY | 240 | $1.51 | $0.01 | $400.00 | $0.01 |
| 39 | Temp BR traf signals (70106500) | EACH | 4 | $18,644 | $17,500 | $35,000 | $50,000 |
| 40 | Temp rumble strips (70106700) | EACH | 24 | $914.04 | $1,500.00 | $1,100.00 | $1,200.00 |
| 41 | Changeable message SN (70107025) | CAL DAY | 56 | $78.75 | $150.00 | $140.00 | $174.00 |
| 42 | Short term pavt mking (70300100) | LF | 593 | $1.69 | $2.75 | $2.25 | $4.00 |
| 43 | SHRT TRM pavt MK rem (70300150) | SF | 199 | $5.08 | $2.75 | $4.50 | $2.00 |
| 44 | Temp PVT MK L4 T4 tape (70307120) | LF | 8,670 | $2.39 | $1.55 | $2.25 | $1.75 |
| 45 | Temp PVT MK L24 T4 tape (70307210) | LF | 192 | $15.73 | $10.75 | $5.50 | $11.00 |
| 46 | Temp conc barrier (70400100) | LF | 1,662.50 | $34.25 | $47.00 | $40.00 | $61.00 |
| 47 | Rel temp conc barrier (70400200) | LF | 1,662.50 | $3.78 | $9.00 | $15.00 | $18.00 |
| 48 | Imp attn temp NRN TL3 (70600251) | EACH | 8 | $6,841.01 | $5,775.00 | $1,685.00 | $4,400.00 |
| 49 | Imp attn rel NRN TL3 (70600352) | EACH | 8 | $919.52 | $1,200.00 | $560.00 | $1,500.00 |
| 50 | Terminal marker - DA (72501000) | EACH | 16 | $47.25 | $50.00 | $50.00 | $57.00 |
| 51 | Paint PVT MK line 4 (78001110) | LF | 6,397 | $0.67 | $0.75 | $1.40 | $0.77 |
| 52 | Raised refl pavt MKR (78100100) | EACH | 34 | $131.25 | $140.00 | $310.00 | $150.00 |
| 53 | Temp rais ref PVT MKR (78100200) | EACH | 400 | $13.51 | $16.00 | $20.00 | $26.00 |
| 54 | Grdrail ref type B (78200006) | EACH | 45 | $31.50 | $30.00 | $35.00 | $38.00 |
| 55 | Barr wall ref type C (78200011) | EACH | 80 | $43.12 | $15.00 | $6.00 | $16.00 |
| 56 | Raised ref PVT MK rem (78300200) | EACH | 434 | $10.31 | $8.50 | $30.00 | $50.00 |
| 57 | PVT MKG rem WTR blast (78300202) | SF | 6,400 | $1.35 | $1.40 | $2.25 | $1.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of August 1, 2025. Compiled by Mirage Metrics.