IDOT contract 89834 bid tabulation
Galesburg, section 19-01502-40-BT. Let by Illinois DOT on January 16, 2026, Knox, District 04. 3 bids received; low bid $1,916,536 by Phoenix Corporation of the Quad Cities.
- Owner
- Illinois DOT
- Letting
- 16 JAN 2026
- Pay items
- 83
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Phoenix Corporation of the Quad Cities | $1,916,536 | Low |
| 2 | Brandt Construction Co. | $2,228,613 | +16% |
| 3 | Laverdiere Construction, Inc. | $2,387,107 | +25% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Phoenix Corporation of the Quad Cities | 2. Brandt Construction Co. | 3. Laverdiere Construction, Inc. |
|---|---|---|---|---|---|---|
| 1 | Shrub removal (K0026830) | EACH | 6 | $315.00 | $365.00 | $500.00 |
| 2 | Seeding SPL (K1005421) | ACRE | 1 | $2,000.00 | $2,250.00 | $2,500.00 |
| 3 | Adj san sew cleanout (XX007759) | EACH | 1 | $1,225.00 | $1,700.00 | $2,900.00 |
| 4 | Rem EX wood bollard (X0324056) | EACH | 14 | $103.00 | $185.00 | $175.00 |
| 5 | Bike path rem (X0327036) | SY | 16 | $55.00 | $105.00 | $54.00 |
| 6 | Rem & rein bric paver (X0327611) | SF | 13 | $89.00 | $255.00 | $200.00 |
| 7 | Fold down bollards (X0350805) | EACH | 6 | $600.00 | $2,300.00 | $2,000.00 |
| 8 | Stump removal (X2010404) | EACH | 1 | $875.00 | $1,300.00 | $1,100.00 |
| 9 | PRCST conc box CLV SP (X5403002) | LF | 22 | $1,190.00 | $1,610.00 | $1,300.00 |
| 10 | Fence removal (X6640104) | LF | 18 | $12.00 | $20.00 | $45.00 |
| 11 | CH LK fence remov (X6640300) | LF | 840 | $9.00 | $6.00 | $9.00 |
| 12 | CH LK fence 5 SPL (X6640555) | LF | 1,189 | $70.00 | $79.00 | $82.00 |
| 13 | Traf cont & prot SPL (X7010216) | LS | 1 | $148,800 | $30,000 | $12,000 |
| 14 | Relocate sign SPL (X7240502) | EACH | 2 | $300.00 | $1,250.00 | $800.00 |
| 15 | Bollards (Z0004002) | EACH | 39 | $340.00 | $980.00 | $1,100.00 |
| 16 | Construction layout (Z0013798) | LS | 1 | $12,000 | $50,000 | $16,500 |
| 17 | Rock fill (Z0054400) | CY | 93 | $174.00 | $148.00 | $195.00 |
| 18 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 | $0.80 |
| 19 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 | $15.00 |
| 20 | Tree remov 6-15 (20100110) | UNIT | 119 | $42.00 | $95.00 | $72.00 |
| 21 | Tree remov over 15 (20100210) | UNIT | 183 | $80.00 | $205.00 | $72.00 |
| 22 | Tree remov acres (20100500) | ACRE | 0.50 | $31,000 | $22,000 | $19,150 |
| 23 | Earth excavation (20200100) | CY | 9,385 | $28.00 | $25.00 | $44.00 |
| 24 | Furnished excavation (20400800) | CY | 3,330 | $33.50 | $30.00 | $48.00 |
| 25 | Porous gran embank (20700220) | CY | 304 | $152.00 | $93.00 | $100.00 |
| 26 | Trench backfill (20800150) | CY | 27 | $135.00 | $40.00 | $115.00 |
| 27 | Geotech fab F/GR stab (21001000) | SY | 200 | $3.00 | $7.00 | $5.50 |
| 28 | Topsoil F & P 4 (21101615) | SY | 12,790 | $4.00 | $9.00 | $8.00 |
| 29 | Seeding CL 1 (25000100) | ACRE | 2 | $3,810.00 | $4,300.00 | $4,572.00 |
| 30 | Nitrogen fert nutr (25000400) | LB | 240 | $1.00 | $1.15 | $1.25 |
| 31 | Phosphorus fert nutr (25000500) | LB | 240 | $1.00 | $1.15 | $1.25 |
| 32 | Potassium fert nutr (25000600) | LB | 240 | $1.00 | $1.15 | $1.25 |
| 33 | Mulch method 2 (25100115) | ACRE | 3 | $1,000.00 | $1,125.00 | $1,200.00 |
| 34 | Temp eros contr seed (28000250) | LB | 798 | $7.00 | $4.00 | $3.00 |
| 35 | Temp ditch checks (28000305) | LF | 752 | $13.00 | $15.00 | $15.00 |
| 36 | Perimeter eros bar (28000400) | LF | 2,071 | $5.00 | $5.00 | $4.00 |
| 37 | Inlet & pipe protect (28000500) | EACH | 13 | $320.00 | $225.00 | $200.00 |
| 38 | Stone riprap CL A4 (28100107) | SY | 424 | $99.00 | $139.00 | $134.00 |
| 39 | Filter fabric (28200200) | SY | 424 | $2.00 | $8.00 | $4.00 |
| 40 | Agg base cse B 2 (35101582) | SY | 245 | $15.75 | $40.50 | $12.00 |
| 41 | Agg base cse B 4 (35101600) | SY | 517 | $19.25 | $27.00 | $17.00 |
| 42 | Agg base cse B 6 (35101800) | SY | 8,671 | $20.00 | $25.00 | $22.00 |
| 43 | Agg surf cse A 8 (40200700) | SY | 298 | $36.50 | $38.00 | $39.00 |
| 44 | Bit matls PR CT (40600275) | LB | 1,520 | $4.87 | $1.00 | $5.40 |
| 45 | HMA SC IL-9.5 C N50 (40604050) | TON | 757 | $244.76 | $172.00 | $271.40 |
| 46 | Incidental HMA surf (40800050) | TON | 215 | $378.66 | $380.00 | $420.25 |
| 47 | PCC driveway pavt 6 (42300200) | SY | 517 | $85.50 | $98.00 | $145.00 |
| 48 | PC conc sidewalk 4 (42400100) | SF | 1,812 | $10.50 | $16.25 | $18.00 |
| 49 | Detectable warnings (42400800) | SF | 232 | $46.50 | $70.00 | $42.00 |
| 50 | Drive pavement rem (44000200) | SY | 503 | $10.00 | $40.00 | $32.00 |
| 51 | CL D patch T2 6 (44201717) | SY | 11 | $327.87 | $495.00 | $394.00 |
| 52 | Aggregate SHLDS B 6 (48101500) | SY | 5,526 | $17.50 | $16.00 | $29.00 |
| 53 | Conc headwall removal (50104400) | EACH | 4 | $750.00 | $3,450.00 | $2,688.00 |
| 54 | Pipe culvert remov (50105220) | LF | 445 | $15.50 | $50.00 | $33.00 |
| 55 | Reinforcement bars (50800105) | LB | 228 | $10.00 | $38.00 | $4.00 |
| 56 | PCBC 4X3 (54010403) | LF | 25 | $750.00 | $1,200.00 | $1,100.00 |
| 57 | PCBC 4X4 (54010404) | LF | 31 | $704.00 | $1,200.00 | $1,150.00 |
| 58 | PCBC 5X4 (54010504) | LF | 32 | $844.00 | $1,800.00 | $1,200.00 |
| 59 | PCBC 6X5 (54010605) | LF | 29 | $923.00 | $2,000.00 | $1,250.00 |
| 60 | P cul CL A 2 24 (542A1069) | LF | 17 | $133.00 | $535.00 | $320.00 |
| 61 | P cul CL A 3 18 (542A1903) | LF | 4 | $202.00 | $778.00 | $597.00 |
| 62 | P cul CL D 1 15 (542D0220) | LF | 264 | $63.25 | $98.00 | $126.00 |
| 63 | P cul CL D 1 18 (542D0223) | LF | 58 | $71.75 | $95.00 | $215.00 |
| 64 | End sections 15 (54213450) | EACH | 14 | $375.00 | $555.00 | $692.00 |
| 65 | End sections 18 (54213453) | EACH | 5 | $395.00 | $610.00 | $815.00 |
| 66 | PRC flar end sec 15 (54213660) | EACH | 2 | $1,375.00 | $1,950.00 | $2,915.00 |
| 67 | PRC flar end sec 24 (54213669) | EACH | 1 | $1,650.00 | $2,950.00 | $3,194.00 |
| 68 | Concrete collar (54248510) | CY | 3.30 | $3,700.00 | $6,000.00 | $4,415.00 |
| 69 | Storm sew CL A 1 15 (550A0070) | LF | 128 | $100.00 | $145.00 | $152.00 |
| 70 | Water valves adjust (56109210) | EACH | 1 | $850.00 | $900.00 | $950.00 |
| 71 | Fire hydnts to BE adj (56400300) | EACH | 1 | $3,650.00 | $2,550.00 | $5,000.00 |
| 72 | Dom wat ser box adj (56500600) | EACH | 2 | $960.00 | $625.00 | $750.00 |
| 73 | Man TA 4 dia T1F OL (60218300) | EACH | 2 | $5,450.00 | $5,650.00 | $7,580.00 |
| 74 | Inlets TA T1F OL (60234200) | EACH | 1 | $1,900.00 | $3,000.00 | $3,862.00 |
| 75 | Man adjust (60255500) | EACH | 8 | $1,250.00 | $1,750.00 | $680.00 |
| 76 | SPBGR TY A 6FT posts (63000001) | LF | 839 | $31.30 | $35.00 | $38.00 |
| 77 | TR bar TRM T1 SPL tan (63100167) | EACH | 12 | $3,760.00 | $4,250.00 | $4,324.00 |
| 78 | Guardrail remov (63200310) | LF | 1,174 | $7.00 | $11.00 | $11.00 |
| 79 | Mobilization (67100100) | LS | 1 | $46,000 | $135,000 | $52,000 |
| 80 | Sign panel T1 (72000100) | SF | 32 | $42.00 | $55.00 | $83.00 |
| 81 | Terminal marker - DA (72501000) | EACH | 12 | $50.00 | $55.00 | $60.00 |
| 82 | Wood sin support (73000100) | LF | 161 | $55.00 | $30.00 | $35.00 |
| 83 | Grdrail ref type A (78200005) | EACH | 24 | $10.00 | $11.00 | $12.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.