IDOT contract 93845 bid tabulation

Project Number: Yehf-204 / /, section 24-08117-00-BR. Let by Illinois DOT on February 27, 2026, Hancock, District 06. 4 bids received; low bid $504,870 by Laverdiere Construction, Inc..

Owner
Illinois DOT
Letting
27 FEB 2026
Pay items
41
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Laverdiere Construction, Inc.$504,870Low
2County Contractors, Inc.$527,900+5.0%
3Brandt Construction Co.$557,455+10%
4Foundation Mechanics$1,043,773+107%
IDOT contract 93845: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Laverdiere Construction, Inc.2. County Contractors, Inc.3. Brandt Construction Co.4. Foundation Mechanics
1SPBGR (short radius) (X6330725)LF25$120.00$96.00$100.00$75.00
2Fence removal (X6640104)LF370$3.00$5.00$6.00$15.00
3Traf cont-prot BLR 21 (X7011800)LS1$4,200.00$3,875.00$2,500.00$30,000
4Construction layout (Z0013798)LS1$5,400.00$3,500.00$8,900.00$10,000
5Tree remov 6-15 (20100110)UNIT50$46.00$35.00$50.00$100.00
6Earth excavation (20200100)CY620$30.00$17.00$25.00$90.00
7Channel excavation (20300100)CY180$34.00$17.00$30.00$150.00
8Geotech fab F/GR stab (21001000)SY605$1.90$4.00$3.00$2.50
9Seeding CL 2 (25000200)ACRE0.25$10,410$8,500.00$10,000$9,000.00
10Nitrogen fert nutr (25000400)LB23$12.00$4.00$12.00$1.00
11Phosphorus fert nutr (25000500)LB23$12.00$4.00$12.00$1.00
12Potassium fert nutr (25000600)LB23$12.00$4.00$12.00$1.00
13Agr ground limestone (25000700)TON0.50$115.00$1,500.00$115.00$100.00
14Mulch method 2 (25100115)ACRE0.25$10,410$8,500.00$10,100$2,000.00
15Earth exc - eros cont (28000200)CY25$58.00$30.00$52.00$190.00
16Temp eros contr seed (28000250)LB50$3.00$1.00$20.00$1.00
17Agg ditch checks (28000315)TON10$117.00$55.00$315.00$100.00
18Perimeter eros bar (28000400)LF425$3.50$4.00$4.00$5.00
19Inlet & pipe protect (28000500)EACH1$276.00$150.00$280.00$1.00
20Stone riprap CL A5 (28100209)TON1,000$86.50$88.00$90.00$74.00
21Filter fabric (28200200)SY700$1.95$4.25$3.50$2.50
22Agg base cse B (35101400)TON393$29.00$40.00$40.00$45.00
23Agg surf course TY B (40200800)TON100$34.00$51.00$40.00$45.00
24Rem exist struct (50100100)EACH1$5,000.00$15,000$11,000$100,000
25Structure excavation (50200100)CY130$38.00$19.00$30.00$250.00
26Conc struct (50300225)CY33.10$1,019.00$930.00$1,195.00$1,800.00
27P P conc DK BM 21 DP (50400405)SF1,510$119.00$119.00$120.00$130.00
28Reinf bars, epoxy CTD (50800205)LB3,580$2.90$2.80$2.50$3.00
29Steel railing TY S1 (50900205)LF116$167.00$160.00$170.00$205.00
30Fur M S pile 12X0.250 (51200957)LF440$70.00$97.00$50.00$100.00
31Driving piles (51202305)LF440$0.01$0.10$1.00$1.00
32Test pile met shells (51203200)EACH2$7,418.00$7,000.00$13,000$2,000.00
33Name plates (51500100)EACH1$1,176.00$1,275.00$1,300.00$1,500.00
34P cul CL C 2 72 (542C1117)LF38$227.00$346.00$210.00$230.00
35Steel FL end sec 72" (54261772)EACH2$6,227.00$5,800.00$6,500.00$6,440.00
36Granular backfill STR (58600101)CY52$72.00$98.00$105.00$110.00
37Traf bar term T5A (63100075)EACH2$2,937.00$2,820.00$2,980.00$2,000.00
38Wov W fence 4 (66500105)LF251$19.00$30.00$55.00$55.00
39Mobilization (67100100)LS1$14,000$20,400$30,000$280,000
40Terminal marker - DA (72501000)EACH4$55.00$52.50$55.00$50.00
41Grdrail ref type A (78200005)EACH8$11.00$10.50$15.00$15.00
IDOT contract 93845: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy