IDOT contract 85783 bid tabulation
Kewanee, section 22-00111-00-SW. Let by Illinois DOT on November 7, 2025, Henry, District 02. 8 bids received; low bid $535,939 by Advanced Asphalt Company.
- Owner
- Illinois DOT
- Letting
- 07 NOV 2025
- Pay items
- 34
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Advanced Asphalt Company | $535,939 | Low |
| 2 | Knapp Concrete Contractors, Inc. | $598,981 | +12% |
| 3 | Gensini Excavating, Inc. | $607,525 | +13% |
| 4 | Phoenix Corporation of the Quad Cities | $619,876 | +16% |
| 5 | McCarthy Improvement Company | $708,003 | +32% |
| 6 | Centennial Contractors of the Quad Cities, Inc. | $740,278 | +38% |
| 7 | Laverdiere Construction, Inc. | $751,240 | +40% |
| 8 | Brandt Construction Co. | $788,793 | +47% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Advanced Asphalt Company | 2. Knapp Concrete Contractors, Inc. | 3. Gensini Excavating, Inc. | 4. Phoenix Corporation of the Quad Cities | 5. McCarthy Improvement Company | 6. Centennial Contractors of the Quad Cities, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Rock fill (special) (XZ054505) | TON | 300 | $100.00 | $54.20 | $100.00 | $15.00 | $60.00 | $65.00 |
| 2 | SLR-PWR FB as CMP DA (X1400175) | EACH | 2 | $13,728 | $15,120 | $15,000 | $18,170 | $20,000 | $15,100 |
| 3 | Seeding CL 1 SPL (X2500900) | ACRE | 0.45 | $15,000 | $13,716 | $20,000 | $25,950 | $8,000.00 | $7,500.00 |
| 4 | Inlets TG-1 (X6020082) | EACH | 10 | $4,000.00 | $3,475.50 | $4,065.05 | $4,800.00 | $5,800.00 | $12,000 |
| 5 | Traf cont & prot SPL (X7010216) | LS | 1 | $7,850.00 | $30,478 | $10,000 | $7,850.00 | $37,000 | $10,000 |
| 6 | Concrete steps (Z0012450) | CY | 2 | $3,000.00 | $2,750.00 | $1,000.00 | $2,500.00 | $5,200.00 | $2,500.00 |
| 7 | Construction layout (Z0013798) | LS | 1 | $12,500 | $21,600 | $13,750 | $12,000 | $25,000 | $15,000 |
| 8 | Earth excavation (20200100) | CY | 211 | $50.00 | $49.50 | $63.77 | $98.00 | $195.00 | $50.00 |
| 9 | Furnished excavation (20400800) | CY | 91 | $100.00 | $87.00 | $123.12 | $78.00 | $50.00 | $80.00 |
| 10 | Perimeter eros bar (28000400) | LF | 221 | $8.00 | $4.38 | $4.00 | $6.00 | $8.00 | $4.00 |
| 11 | Inlet & pipe protect (28000500) | EACH | 10 | $120.00 | $272.00 | $250.00 | $300.00 | $200.00 | $250.00 |
| 12 | Stone riprap CL A3 (28100205) | TON | 5 | $200.00 | $136.00 | $100.00 | $145.00 | $120.00 | $150.00 |
| 13 | Agg base cse A (35100100) | TON | 488 | $52.07 | $54.40 | $56.18 | $74.00 | $105.00 | $50.00 |
| 14 | Bit matls tack CT (40600290) | LB | 150 | $5.00 | $5.40 | $5.50 | $1.00 | $5.50 | $4.95 |
| 15 | HMA SC IL-9.5 D N50 (40604060) | TON | 147 | $250.00 | $270.00 | $275.00 | $285.00 | $275.00 | $247.50 |
| 16 | PCC PVT 7 (42000200) | SY | 374 | $100.00 | $96.80 | $152.92 | $82.00 | $115.00 | $120.00 |
| 17 | PCC driveway pavt 6 (42300200) | SY | 256 | $90.00 | $93.50 | $98.37 | $88.00 | $115.00 | $99.00 |
| 18 | PC conc sidewalk 4 (42400100) | SF | 5,896 | $10.50 | $13.20 | $9.71 | $8.65 | $10.00 | $13.00 |
| 19 | PC conc sidewalk 6 (42400300) | SF | 493 | $25.00 | $14.30 | $11.50 | $13.00 | $23.00 | $17.00 |
| 20 | Detectable warnings (42400800) | SF | 130 | $25.00 | $28.28 | $30.00 | $43.00 | $37.00 | $50.00 |
| 21 | Pavement rem (44000100) | SY | 1,029 | $18.00 | $22.00 | $16.98 | $16.50 | $27.00 | $20.00 |
| 22 | Drive pavement rem (44000200) | SY | 126 | $20.00 | $24.20 | $17.00 | $23.50 | $24.00 | $20.00 |
| 23 | Sidewalk rem (44000600) | SF | 133 | $6.50 | $3.30 | $2.00 | $3.00 | $20.00 | $4.00 |
| 24 | Pipe handrail (50901760) | LF | 14 | $565.00 | $610.20 | $600.00 | $533.50 | $600.00 | $190.00 |
| 25 | Metal FL end sec 8" (54262708) | EACH | 1 | $200.00 | $398.20 | $1,463.00 | $525.00 | $210.00 | $605.00 |
| 26 | Metal FL end sec 12" (54262712) | EACH | 1 | $170.00 | $404.60 | $1,529.00 | $475.00 | $275.00 | $550.00 |
| 27 | CB TC T8G (60207605) | EACH | 5 | $1,500.00 | $2,566.00 | $2,262.32 | $3,050.00 | $2,400.00 | $7,142.00 |
| 28 | Man adjust (60255500) | EACH | 2 | $1,300.00 | $2,022.00 | $902.00 | $1,675.00 | $750.00 | $3,300.00 |
| 29 | Comb CC&G TB6.12 (60603800) | LF | 964 | $31.48 | $66.00 | $47.07 | $55.50 | $58.00 | $55.00 |
| 30 | Storm sewer spec 6 (61139900) | LF | 57 | $55.00 | $72.48 | $86.69 | $100.00 | $46.00 | $159.50 |
| 31 | Storm sewer spec 8 (61140000) | LF | 654 | $65.00 | $62.88 | $90.25 | $99.00 | $58.00 | $94.60 |
| 32 | Storm sewer spec 12 (61140200) | LF | 401 | $75.00 | $71.52 | $104.22 | $114.00 | $81.00 | $124.30 |
| 33 | Mobilization (67100100) | LS | 1 | $32,500 | $19,200 | $25,000 | $47,400 | $40,000 | $45,000 |
| 34 | Paint PVT MK line 6 (78001130) | LF | 52 | $40.00 | $123.12 | $100.00 | $55.00 | $21.00 | $65.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of November 7, 2025. Compiled by Mirage Metrics.