IDOT contract 89780 bid tabulation
Monmouth, section 17-00081-01-RP. Let by Illinois DOT on April 25, 2025, Warren, District 04. 3 bids received; low bid $2,855,658 by Brandt Construction Co..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 63
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Brandt Construction Co. | $2,855,658 | Low |
| 2 | Laverdiere Construction, Inc. | $3,542,871 | +24% |
| 3 | Gunther Construction, a div of UCM, Inc. | $3,995,905 | +40% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Brandt Construction Co. | 2. Laverdiere Construction, Inc. | 3. Gunther Construction, a div of UCM, Inc. |
|---|---|---|---|---|---|---|
| 1 | Relocate EX mailbox (X0327301) | EACH | 1 | $550.00 | $500.00 | $804.96 |
| 2 | R R FL beacon A comp (X1400326) | EACH | 2 | $27,500 | $55,750 | $25,921 |
| 3 | Agg surf cse B 6 (X4020500) | SY | 64 | $58.00 | $90.00 | $50.83 |
| 4 | Incidentl HMA surf SP (X4080052) | TON | 9 | $400.00 | $1,000.00 | $345.73 |
| 5 | PC conc sidewalk 4 SP (X4240420) | SF | 302 | $19.00 | $31.00 | $28.38 |
| 6 | HMA surf rem var DP (X4401198) | SY | 661 | $15.00 | $9.90 | $40.57 |
| 7 | Conc HDWL rem SPL (X5012650) | EACH | 2 | $700.00 | $3,900.00 | $4,095.00 |
| 8 | Storm sew connection (X5510010) | EACH | 2 | $2,400.00 | $4,500.00 | $4,725.00 |
| 9 | Inlets TG-1 DBL (SPL) (X6020065) | EACH | 2 | $11,500 | $6,500.00 | $6,825.00 |
| 10 | Inlets TA T1F OL SPL (X6023204) | EACH | 1 | $2,800.00 | $7,500.00 | $7,875.00 |
| 11 | Traf cont & prot SPL (X7010216) | LS | 1 | $50,000 | $70,000 | $49,400 |
| 12 | Sign and post (X7200064) | EACH | 18 | $675.00 | $1,000.00 | $787.50 |
| 13 | Sign removal (X7240300) | EACH | 6 | $200.00 | $300.00 | $129.84 |
| 14 | Relocate sign SPL (X7240502) | EACH | 2 | $1,800.00 | $2,000.00 | $5,868.24 |
| 15 | Construction layout (Z0013798) | LS | 1 | $30,000 | $22,000 | $47,668 |
| 16 | SS 2 wat MN 12 (Z0056668) | LF | 136 | $145.00 | $200.00 | $236.25 |
| 17 | SS 2 wat MN 18 (Z0056670) | LF | 19 | $250.00 | $250.00 | $262.50 |
| 18 | Earth excavation (20200100) | CY | 3,805 | $25.00 | $49.00 | $59.76 |
| 19 | Trench backfill (20800150) | CY | 1,217 | $30.00 | $59.00 | $61.95 |
| 20 | Geotech fab F/GR stab (21001000) | SY | 8,972 | $2.70 | $2.20 | $1.80 |
| 21 | Topsoil F & P 4 (21101615) | SY | 2,554 | $7.00 | $39.00 | $17.69 |
| 22 | Seeding CL 1A (25000110) | ACRE | 0.50 | $20,500 | $15,000 | $19,016 |
| 23 | Perimeter eros bar (28000400) | LF | 4,664 | $3.00 | $3.00 | $4.39 |
| 24 | Inlet filters (28000510) | EACH | 16 | $475.00 | $300.00 | $415.96 |
| 25 | Stone riprap CL A5 (28100109) | SY | 61 | $135.00 | $172.00 | $105.00 |
| 26 | Agg base cse A 8 (35100700) | SY | 8,972 | $15.00 | $20.00 | $23.44 |
| 27 | Agg base cse B 4 (35101600) | SY | 3,652 | $14.00 | $14.00 | $23.26 |
| 28 | Aggregate-temp access (40201000) | TON | 550 | $30.00 | $39.00 | $80.24 |
| 29 | Bit matls PR CT (40600275) | LB | 1,527 | $3.50 | $8.50 | $9.15 |
| 30 | HMA surf rem butt JT (40600982) | SY | 530 | $45.00 | $38.00 | $40.57 |
| 31 | HMA BC IL-9.5 N50 (40602978) | TON | 94 | $195.00 | $329.00 | $345.73 |
| 32 | HMA SC IL-9.5 D N50 (40604060) | TON | 121 | $195.00 | $335.00 | $345.72 |
| 33 | PCC PVT 8 jointed (42000301) | SY | 7,382 | $82.00 | $110.00 | $117.73 |
| 34 | PCC driveway pavt 7 (42300300) | SY | 1,967 | $89.00 | $98.00 | $117.65 |
| 35 | PC conc sidewalk 4 (42400100) | SF | 14,848.50 | $12.00 | $12.00 | $18.68 |
| 36 | Detectable warnings (42400800) | SF | 439.40 | $40.00 | $50.00 | $65.67 |
| 37 | Pavement rem (44000100) | SY | 8,236 | $8.00 | $13.00 | $8.43 |
| 38 | Drive pavement rem (44000200) | SY | 963 | $20.00 | $16.00 | $49.58 |
| 39 | Comb curb gutter rem (44000500) | LF | 64 | $30.00 | $16.00 | $22.68 |
| 40 | Sidewalk rem (44000600) | SF | 126 | $5.00 | $35.00 | $9.27 |
| 41 | Pipe culvert remov (50105220) | LF | 407 | $17.00 | $30.00 | $31.50 |
| 42 | P cul spec 12 (54205047) | LF | 86 | $83.00 | $225.00 | $236.25 |
| 43 | End sections 30 (54213465) | EACH | 1 | $3,500.00 | $3,500.00 | $3,675.00 |
| 44 | Storm sew CL A 2 12 (550A0340) | LF | 90 | $120.00 | $225.00 | $236.25 |
| 45 | Storm sew CL A 2 18 (550A0380) | LF | 1,016 | $103.00 | $139.00 | $152.25 |
| 46 | Storm sew CL A 2 24 (550A0410) | LF | 415 | $135.00 | $225.00 | $236.25 |
| 47 | Storm sew CL A 2 30 (550A0430) | LF | 1,703 | $215.00 | $159.00 | $178.50 |
| 48 | Water valves adjust (56109210) | EACH | 27 | $600.00 | $500.00 | $942.90 |
| 49 | Fire hydnts relocated (56400400) | EACH | 1 | $8,655.00 | $5,500.00 | $5,775.00 |
| 50 | Dom wat ser box adj (56500600) | EACH | 1 | $580.00 | $1,000.00 | $1,050.00 |
| 51 | Man TA 4 dia T1F CL (60218400) | EACH | 2 | $6,175.00 | $8,500.00 | $8,925.00 |
| 52 | Man TA 5 dia T1F CL (60221100) | EACH | 9 | $7,700.00 | $9,000.00 | $10,500 |
| 53 | Man TA 6 dia T1F CL (60223800) | EACH | 3 | $10,000 | $11,000 | $12,600 |
| 54 | Inlets TA T3F&G (60235700) | EACH | 15 | $3,650.00 | $4,100.00 | $4,725.00 |
| 55 | Man adjust (60255500) | EACH | 6 | $1,100.00 | $1,500.00 | $1,690.95 |
| 56 | Inlets reconst (60262700) | EACH | 1 | $2,900.00 | $4,500.00 | $4,725.00 |
| 57 | Remov catch bas (60500050) | EACH | 2 | $1,600.00 | $2,500.00 | $2,625.00 |
| 58 | Comb CC&G TB6.18 dow (60604600) | LF | 4,844 | $25.00 | $54.00 | $65.70 |
| 59 | Mobilization (67100100) | LS | 1 | $175,000 | $39,000 | $85,090 |
| 60 | Reloc sin pan assy TA (72400500) | EACH | 19 | $560.00 | $400.00 | $830.08 |
| 61 | Paint PVT MK line 4 (78001110) | LF | 3,647 | $0.95 | $1.90 | $1.84 |
| 62 | Paint PVT MK line 6 (78001130) | LF | 1,476 | $1.45 | $2.25 | $2.31 |
| 63 | Paint PVT MK line 24 (78001180) | LF | 122 | $5.60 | $10.00 | $9.45 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.