IDOT contract 64N76 bid tabulation
Section (2,3)R. Let by Illinois DOT on April 25, 2025, Henry, District 02. 4 bids received; low bid $2,705,618 by Phoenix Corporation of the Quad Cities.
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 93
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Phoenix Corporation of the Quad Cities | $2,705,618 | Low |
| 2 | Valley Construction Co. | $2,943,583 | +9.0% |
| 3 | Brandt Construction Co. | $3,196,820 | +18% |
| 4 | Fischer Excavating, Inc. | $3,257,263 | +20% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Phoenix Corporation of the Quad Cities | 2. Valley Construction Co. | 3. Brandt Construction Co. | 4. Fischer Excavating, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Solar-power FB as CMP (X0326899) | EACH | 4 | $4,900.00 | $4,715.00 | $5,270.00 | $4,750.00 |
| 2 | Stone riprap CL A5 SP (X2810110) | SY | 2,005 | $109.00 | $150.00 | $157.00 | $140.00 |
| 3 | HMA surf rem-long JT (X4401196) | SY | 223 | $26.98 | $19.00 | $77.00 | $52.00 |
| 4 | Drop box no.1 (X5420201) | EACH | 1 | $61,050 | $65,000 | $76,500 | $71,000 |
| 5 | Concrete island SPL (X6061055) | SF | 454 | $25.50 | $55.00 | $55.00 | $41.00 |
| 6 | Traf cont & prot SPL (X7010216) | LS | 1 | $48,950 | $48,950 | $55,000 | $48,950 |
| 7 | Construction layout (Z0013798) | LS | 1 | $10,000 | $10,000 | $15,000 | $35,000 |
| 8 | Rock fill (Z0054400) | CY | 39 | $50.00 | $90.00 | $90.00 | $73.00 |
| 9 | Tree remov over 15 (20100210) | UNIT | 40 | $70.00 | $250.00 | $80.00 | $100.00 |
| 10 | Earth excavation (20200100) | CY | 17,715 | $12.75 | $15.50 | $20.00 | $19.00 |
| 11 | Rock excavation (20200200) | CY | 93 | $57.00 | $90.00 | $90.00 | $90.00 |
| 12 | Channel excavation (20300100) | CY | 175 | $13.00 | $30.00 | $20.00 | $26.00 |
| 13 | Porous gran embank (20700220) | CY | 1,542 | $61.00 | $60.00 | $55.00 | $62.00 |
| 14 | Trench backfill (20800150) | CY | 194 | $37.00 | $55.00 | $30.00 | $46.00 |
| 15 | Topsoil F & P 4 (21101615) | SY | 19,836 | $2.25 | $5.00 | $4.00 | $3.50 |
| 16 | Explor trench 48 (21301048) | LF | 76 | $12.00 | $3.00 | $13.00 | $10.00 |
| 17 | Seeding CL 1A (25000110) | ACRE | 0.50 | $5,000.00 | $3.00 | $3,355.00 | $3,000.00 |
| 18 | Seeding CL 2A (25000210) | ACRE | 2 | $2,000.00 | $1.40 | $2,450.00 | $2,200.00 |
| 19 | Seeding CL 4 (25000310) | ACRE | 2 | $3,000.00 | $183.50 | $2,450.00 | $2,200.00 |
| 20 | Nitrogen fert nutr (25000400) | LB | 370 | $2.00 | $10.00 | $1.15 | $1.00 |
| 21 | Phosphorus fert nutr (25000500) | LB | 370 | $2.00 | $10.00 | $1.15 | $1.00 |
| 22 | Potassium fert nutr (25000600) | LB | 370 | $2.00 | $10.00 | $1.15 | $1.00 |
| 23 | Mowing (25000750) | ACRE | 2 | $1,000.00 | $500.00 | $280.00 | $250.00 |
| 24 | Erosion contr blanket (25100630) | SY | 18,260 | $1.25 | $0.30 | $2.00 | $1.75 |
| 25 | Turf reinf mat (25100900) | SY | 1,576 | $6.50 | $2.00 | $6.70 | $6.00 |
| 26 | Temp eros contr seed (28000250) | LB | 410 | $5.50 | $2.10 | $1.15 | $1.00 |
| 27 | Temp ditch checks (28000305) | LF | 1,479 | $10.00 | $2.10 | $15.00 | $14.00 |
| 28 | Perimeter eros bar (28000400) | LF | 1,012 | $2.00 | $0.35 | $2.55 | $2.25 |
| 29 | Inlet & pipe protect (28000500) | EACH | 6 | $200.00 | $150.00 | $165.00 | $150.00 |
| 30 | Stone riprap CL A4 (28100107) | SY | 50 | $66.60 | $180.00 | $92.00 | $65.00 |
| 31 | Filter fabric (28200200) | SY | 50 | $6.00 | $3.00 | $23.00 | $6.00 |
| 32 | Agg subgrade impr 24 (30300124) | SY | 10,588 | $36.00 | $38.00 | $39.00 | $38.00 |
| 33 | Agg base cse B 8 (35102000) | SY | 699 | $16.50 | $16.80 | $17.50 | $14.00 |
| 34 | Aggregate-temp access (40201000) | TON | 100 | $37.00 | $47.00 | $45.00 | $33.00 |
| 35 | Bit matls PR CT (40600275) | LB | 22,368 | $0.84 | $0.10 | $0.10 | $1.00 |
| 36 | P bit matls tack CT (40600295) | LB | 12,223 | $0.84 | $0.70 | $0.10 | $1.00 |
| 37 | Long joint sealant (40600370) | LF | 4,252 | $5.99 | $5.50 | $6.60 | $7.00 |
| 38 | HMA pavt FD 10 (40701881) | SY | 7,277 | $73.66 | $55.00 | $64.50 | $66.00 |
| 39 | Incidental HMA surf (40800050) | TON | 17 | $356.31 | $260.00 | $265.00 | $268.00 |
| 40 | PCC driveway pavt 7 (42300300) | SY | 78 | $80.00 | $110.00 | $95.00 | $125.00 |
| 41 | Pavement rem (44000100) | SY | 8,103 | $11.75 | $22.00 | $17.00 | $15.00 |
| 42 | HMA shoulders 8 (48203029) | SY | 2,639 | $60.08 | $52.50 | $55.50 | $72.00 |
| 43 | Rem exist struct N1 (50100300) | EACH | 1 | $16,000 | $25,000 | $25,000 | $8,500.00 |
| 44 | Rem exist struct N2 (50100400) | EACH | 1 | $10,250 | $20,000 | $7,000.00 | $5,700.00 |
| 45 | Rem exist struct N3 (50100500) | EACH | 1 | $7,325.00 | $25,000 | $7,000.00 | $9,250.00 |
| 46 | Pipe culvert remov (50105220) | LF | 107 | $12.00 | $55.00 | $19.00 | $27.00 |
| 47 | Structure excavation (50200100) | CY | 597 | $19.25 | $25.00 | $25.00 | $40.00 |
| 48 | Rem/disp uns matl-STR (50200450) | CY | 35 | $39.00 | $30.00 | $30.00 | $47.00 |
| 49 | Name plates (51500100) | EACH | 1 | $1,140.00 | $700.00 | $985.00 | $1,000.00 |
| 50 | Box cul end sec C1 (54001001) | EACH | 1 | $65,600 | $90,000 | $105,000 | $130,000 |
| 51 | PCBC 10X10 (54011010) | LF | 72 | $2,018.00 | $1,600.00 | $1,880.00 | $2,800.00 |
| 52 | P cul CL A 2 30 (542A1075) | LF | 61 | $130.00 | $130.00 | $148.00 | $140.00 |
| 53 | P cul CL A 2 48 (542A1093) | LF | 50 | $228.50 | $230.00 | $255.00 | $330.00 |
| 54 | P cul CL D 1 15 (542D0220) | LF | 109 | $51.00 | $110.00 | $48.00 | $85.00 |
| 55 | P cul CL D 1 18 (542D0223) | LF | 159 | $56.75 | $110.00 | $54.00 | $89.00 |
| 56 | TRVRS pipe GRT con ES (54260315) | LF | 449 | $77.50 | $40.00 | $90.00 | $90.00 |
| 57 | Slop met ES 15", 1:6 (54260515) | EACH | 4 | $1,500.00 | $2,220.00 | $1,240.00 | $860.00 |
| 58 | Slop met ES 18", 1:6 (54260518) | EACH | 2 | $1,625.00 | $2,350.00 | $1,800.00 | $1,030.00 |
| 59 | Conc ES 542001 30 1:4 (54261430) | EACH | 2 | $5,925.00 | $9,200.00 | $8,100.00 | $6,035.00 |
| 60 | Conc ES 542001 48 1:4 (54261448) | EACH | 2 | $11,950 | $14,250 | $14,460 | $12,655 |
| 61 | Storm sewer rem 12 (55100500) | LF | 76 | $20.50 | $25.00 | $34.00 | $30.00 |
| 62 | Conc HDWL for P drain (60100060) | EACH | 8 | $440.00 | $1,200.00 | $750.00 | $350.00 |
| 63 | Pipe drains 15 (60100955) | LF | 42 | $69.50 | $65.00 | $58.00 | $45.00 |
| 64 | Pipe underdrain 4 SP (60108100) | LF | 64 | $22.00 | $50.00 | $46.00 | $20.00 |
| 65 | Pipe underdr T 2 4 (60108204) | LF | 3,094 | $19.00 | $15.00 | $22.50 | $20.00 |
| 66 | Class SI conc outlet (60600095) | CY | 4.80 | $1,450.00 | $800.00 | $2,765.00 | $1,135.00 |
| 67 | Comb CC&G TM4.24 (60608582) | LF | 98 | $68.50 | $92.00 | $95.00 | $97.00 |
| 68 | FLD tile jun vault 3D (61133200) | EACH | 1 | $2,475.00 | $4,500.00 | $2,660.00 | $2,850.00 |
| 69 | Guardrail remov (63200310) | LF | 606 | $6.25 | $9.00 | $11.00 | $10.50 |
| 70 | Delineators (63500105) | EACH | 8 | $62.00 | $200.00 | $225.00 | $175.00 |
| 71 | Shoulder rum strip 8 (64200108) | LF | 2,753 | $1.06 | $2.55 | $1.75 | $2.00 |
| 72 | Fur erect row markers (66600105) | EACH | 21 | $175.00 | $150.00 | $790.00 | $250.00 |
| 73 | Perm surv MKRS T2 (66700305) | EACH | 1 | $525.00 | $500.00 | $1,800.00 | $2,000.00 |
| 74 | Engr field office A (67000400) | CAL MO | 5 | $2,300.00 | $1,500.00 | $3,500.00 | $2,500.00 |
| 75 | Mobilization (67100100) | LS | 1 | $61,400 | $175,000 | $180,000 | $195,000 |
| 76 | Traf cont-prot 701201 (70100450) | LS | 1 | $1,000.00 | $3,500.00 | $1,115.00 | $1,000.00 |
| 77 | Changeable message SN (70107025) | CAL DAY | 60 | $50.00 | $50.00 | $55.00 | $50.00 |
| 78 | Sign panel T1 (72000100) | SF | 135 | $65.00 | $35.00 | $40.00 | $35.00 |
| 79 | Sign panel T2 (72000200) | SF | 41 | $90.00 | $42.00 | $45.00 | $42.00 |
| 80 | Remov sin pan assy TA (72400100) | EACH | 14 | $750.00 | $80.00 | $89.00 | $80.00 |
| 81 | Remov sin pan assy TB (72400200) | EACH | 6 | $900.00 | $100.00 | $112.00 | $100.00 |
| 82 | Teles STL sin support (72800100) | LF | 92 | $50.00 | $22.00 | $25.00 | $22.00 |
| 83 | Wood sin support (73000100) | LF | 181 | $100.00 | $20.00 | $22.50 | $20.00 |
| 84 | Mod ureth PM LTR-sym (78009000) | SF | 63 | $7.00 | $7.00 | $7.80 | $7.35 |
| 85 | Mod ureth PM line 4 (78009004) | LF | 8,184 | $0.98 | $1.00 | $1.10 | $1.68 |
| 86 | Mod ureth PM line 8 (78009008) | LF | 627 | $1.70 | $1.70 | $1.90 | $3.47 |
| 87 | Mod ureth PM line 12 (78009012) | LF | 244 | $3.00 | $3.00 | $3.35 | $5.20 |
| 88 | Mod ureth PM line 24 (78009024) | LF | 60 | $7.00 | $7.00 | $7.85 | $10.39 |
| 89 | GRV RCSD PM LTR & sym (78011000) | SF | 68 | $7.00 | $7.00 | $7.85 | $2.62 |
| 90 | GRV RCSD PVT MRKG 5 (78011025) | LF | 8,184 | $0.95 | $0.95 | $1.05 | $0.55 |
| 91 | GRV RCSD PVT MRKG 9 (78011045) | LF | 627 | $1.70 | $1.70 | $1.90 | $1.12 |
| 92 | GRV RCSD PVT MRKG 13 (78011065) | LF | 244 | $2.45 | $2.45 | $2.75 | $1.68 |
| 93 | GRV RCSD PVT MRKG 25 (78011125) | LF | 60 | $7.00 | $7.00 | $7.85 | $3.36 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.