IDOT contract 85781 bid tabulation
East Moline, section 22-00159-04-PV. Let by Illinois DOT on July 31, 2026, Rock Island, District 02. 4 bids received; low bid $6,393,210 by Miller Trucking & Excavating Company.
- Owner
- Illinois DOT
- Letting
- 31 JUL 2026
- Pay items
- 110
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Miller Trucking & Excavating Company | $6,393,210 | Low |
| 2 | Valley Construction Co. | $6,525,687 | +2.0% |
| 3 | Gensini Excavating, Inc. | $6,549,485 | +2.0% |
| 4 | McCarthy Improvement Company | $6,559,251 | +3.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Miller Trucking & Excavating Company | 2. Valley Construction Co. | 3. Gensini Excavating, Inc. | 4. McCarthy Improvement Company |
|---|---|---|---|---|---|---|---|
| 1 | T-acer miy mor 2 (A2000316) | EACH | 18 | $700.00 | $600.00 | $824.16 | $600.00 |
| 2 | T-ginkgo bil AG 2 (A2004512) | EACH | 11 | $700.00 | $600.00 | $1,098.88 | $600.00 |
| 3 | T-nyssa sylvat 2 (A2005516) | EACH | 19 | $700.00 | $600.00 | $934.05 | $600.00 |
| 4 | T-plat X acr MC 2 (A2005956) | EACH | 8 | $700.00 | $600.00 | $988.99 | $600.00 |
| 5 | T-quercus shum 1-3/4 (A2016814) | EACH | 20 | $1,600.00 | $600.00 | $824.16 | $600.00 |
| 6 | PCC PVMT 8 SPL W IC (LR420129) | SY | 11,139 | $80.00 | $85.00 | $103.65 | $85.25 |
| 7 | San sew PVC 12 (XX001466) | LF | 1,993 | $91.00 | $88.00 | $201.08 | $82.75 |
| 8 | San sew service 6 (XX003803) | LF | 250 | $80.00 | $95.00 | $176.74 | $79.00 |
| 9 | Watermain casing pipe (XX005855) | LF | 206 | $200.00 | $80.00 | $91.95 | $106.00 |
| 10 | Concrete pad removal (XX005896) | SF | 102,167 | $2.00 | $1.40 | $0.88 | $2.00 |
| 11 | Gate valve & box 6 (XX006077) | EACH | 2 | $2,800.00 | $2,550.00 | $2,888.33 | $2,300.00 |
| 12 | Gate valve & box 12 (XX006088) | EACH | 3 | $5,750.00 | $6,000.00 | $6,717.29 | $5,300.00 |
| 13 | San MH 4 dia (XX006253) | EACH | 10 | $5,900.00 | $8,000.00 | $5,010.81 | $7,100.00 |
| 14 | Frame & grate special (XX007031) | EACH | 1 | $1,350.00 | $1,450.00 | $1,298.49 | $1,815.00 |
| 15 | Handhole SP 12" X 12" (XX007125) | EACH | 26 | $600.00 | $590.00 | $648.34 | $590.00 |
| 16 | Wayfinding sign (XX008269) | EACH | 2 | $1,750.00 | $9,500.00 | $10,109 | $11,600 |
| 17 | Washout basin (X0326806) | LS | 1 | $2,500.00 | $5,000.00 | $11,774 | $1,500.00 |
| 18 | Relocate EX mailbox (X0327301) | EACH | 1 | $500.00 | $350.00 | $184.45 | $300.00 |
| 19 | Trash receptacles (X0327997) | EACH | 3 | $4,500.00 | $3,500.00 | $3,124.39 | $2,500.00 |
| 20 | Temporary fence SPL (X2011000) | LF | 1,376 | $10.00 | $9.00 | $23.25 | $15.00 |
| 21 | Swing gate, new (X2300025) | EACH | 2 | $6,500.00 | $6,500.00 | $6,373.50 | $5,200.00 |
| 22 | PC conc SDWLK 5 CLRD (X4240200) | SF | 460 | $21.00 | $15.50 | $19.59 | $25.50 |
| 23 | Elast CHK val 24 (X5420124) | EACH | 1 | $11,500 | $8,950.00 | $9,162.77 | $11,400 |
| 24 | Non-pres conn EX WM (X5610804) | EACH | 3 | $1,750.00 | $4,500.00 | $5,634.44 | $1,500.00 |
| 25 | Press conn EX WTR MN (X5610806) | EACH | 1 | $9,100.00 | $8,250.00 | $14,522 | $6,400.00 |
| 26 | Fire hydnt assy comp (X5640150) | EACH | 9 | $8,970.00 | $8,750.00 | $9,696.75 | $8,000.00 |
| 27 | Man TA 4 dia SPL F&G (X6022230) | EACH | 14 | $5,400.00 | $5,150.00 | $3,213.71 | $5,300.00 |
| 28 | Man TA 5 dia SPL F&G (X6022930) | EACH | 11 | $6,900.00 | $7,550.00 | $4,441.44 | $7,400.00 |
| 29 | Man TA 6 dia SPL F&G (X6024090) | EACH | 1 | $9,100.00 | $9,800.00 | $7,621.65 | $7,600.00 |
| 30 | Double inlet SPL (X6024210) | EACH | 2 | $5,310.00 | $6,750.00 | $5,559.04 | $7,500.00 |
| 31 | Inlets SPL (X6024240) | EACH | 51 | $3,300.00 | $4,000.00 | $2,584.88 | $4,100.00 |
| 32 | Fence removal (X6640104) | LF | 2,224 | $5.00 | $5.50 | $8.40 | $5.00 |
| 33 | CH LK fence SPL (X6640298) | LF | 1,258 | $43.00 | $42.60 | $64.71 | $40.00 |
| 34 | Traf cont & prot SPL (X7010216) | LS | 1 | $40,000 | $12,000 | $20,329 | $12,000 |
| 35 | Benches (Z0003850) | EACH | 6 | $4,000.00 | $5,500.00 | $4,650.20 | $4,600.00 |
| 36 | BLDG remov no 1 (Z0007601) | LS | 1 | $3,900.00 | $5,000.00 | $20,387 | $4,000.00 |
| 37 | Construction layout (Z0013798) | LS | 1 | $40,222 | $32,600 | $36,263 | $32,600 |
| 38 | San sew SPL (Z0058000) | LF | 237 | $101.00 | $92.50 | $212.31 | $85.50 |
| 39 | Trainees (Z0076600) | HR | 2,000 | $0.80 | $0.80 | $0.80 | $0.80 |
| 40 | Trainees TPG (Z0076604) | HR | 2,000 | $15.00 | $15.00 | $15.00 | $15.00 |
| 41 | Tree remov 6-15 (20100110) | UNIT | 23 | $75.00 | $65.00 | $120.88 | $150.00 |
| 42 | Tree remov over 15 (20100210) | UNIT | 60 | $90.00 | $70.00 | $241.75 | $150.00 |
| 43 | Tree remov acres (20100500) | ACRE | 0.20 | $10,000 | $40,000 | $109,888 | $20,000 |
| 44 | Earth excavation (20200100) | CY | 5,695 | $20.00 | $15.00 | $14.33 | $27.85 |
| 45 | Furnished excavation (20400800) | CY | 11,554 | $40.00 | $15.00 | $23.43 | $22.00 |
| 46 | Trench backfill (20800150) | CY | 1,901 | $38.00 | $50.00 | $25.85 | $76.50 |
| 47 | Geotech fab F/GR stab (21001000) | SY | 11,481 | $1.50 | $2.60 | $1.67 | $1.80 |
| 48 | Topsoil F & P 4 (21101615) | SY | 26,206 | $9.00 | $4.00 | $7.31 | $10.20 |
| 49 | Topsoil F & P 24 (21101685) | SY | 820 | $30.00 | $55.00 | $44.93 | $36.00 |
| 50 | Seeding CL 2A (25000210) | ACRE | 5.50 | $3,300.00 | $3,250.00 | $3,516.41 | $3,431.82 |
| 51 | Nitrogen fert nutr (25000400) | LB | 487 | $2.00 | $4.00 | $3.30 | $4.00 |
| 52 | Phosphorus fert nutr (25000500) | LB | 487 | $2.00 | $4.00 | $3.30 | $4.00 |
| 53 | Potassium fert nutr (25000600) | LB | 487 | $2.00 | $4.00 | $3.30 | $4.00 |
| 54 | Mulch method 2 (25100115) | ACRE | 3.40 | $2,500.00 | $2,500.00 | $3,296.64 | $2,500.00 |
| 55 | Erosion contr blanket (25100630) | SY | 10,049 | $2.50 | $2.00 | $1.81 | $2.00 |
| 56 | Perimeter eros bar (28000400) | LF | 4,729 | $3.00 | $3.95 | $3.85 | $3.95 |
| 57 | Inlet & pipe protect (28000500) | EACH | 84 | $140.00 | $180.00 | $247.25 | $180.00 |
| 58 | Stone riprap CL A3 (28100105) | SY | 9 | $90.00 | $90.00 | $190.90 | $62.50 |
| 59 | Filter fabric (28200200) | SY | 29 | $4.00 | $6.75 | $22.18 | $1.75 |
| 60 | Agg subgrade impr 12 (30300112) | SY | 11,481 | $19.00 | $20.00 | $23.23 | $13.00 |
| 61 | Sub gran mat A 4 (31100300) | SY | 11,481 | $9.00 | $12.00 | $7.42 | $8.40 |
| 62 | Sub gran mat B 4 (31101200) | SY | 7,794 | $8.00 | $15.00 | $9.32 | $12.40 |
| 63 | Aggregate-temp access (40201000) | TON | 306 | $32.00 | $65.00 | $32.97 | $36.00 |
| 64 | PCC driveway pavt 8 (42300400) | SY | 920 | $92.00 | $105.00 | $95.19 | $93.00 |
| 65 | PC conc sidewalk 4 (42400100) | SF | 56,128 | $8.00 | $7.50 | $7.79 | $4.35 |
| 66 | PC conc sidewalk 5 (42400200) | SF | 240 | $12.00 | $25.00 | $13.47 | $21.00 |
| 67 | Detectable warnings (42400800) | SF | 75 | $50.00 | $44.00 | $38.46 | $40.00 |
| 68 | Pavement rem (44000100) | SY | 18,050 | $8.00 | $11.00 | $8.05 | $17.00 |
| 69 | Sidewalk rem (44000600) | SF | 688 | $2.00 | $3.00 | $1.26 | $1.50 |
| 70 | Pipe culvert remov (50105220) | LF | 147 | $10.00 | $25.00 | $29.88 | $16.50 |
| 71 | Rock exc struct (50200400) | CY | 575 | $70.00 | $200.00 | $0.01 | $220.00 |
| 72 | PRC flar end sec 24 (54213669) | EACH | 3 | $2,400.00 | $2,250.00 | $2,121.96 | $2,050.00 |
| 73 | Storm sew CL A 1 12 (550A0050) | LF | 702 | $70.00 | $85.00 | $76.40 | $56.50 |
| 74 | Storm sew CL A 1 15 (550A0070) | LF | 1,165 | $80.00 | $89.00 | $81.07 | $63.50 |
| 75 | Storm sew CL A 1 18 (550A0090) | LF | 299 | $87.00 | $105.00 | $85.95 | $80.00 |
| 76 | Storm sew CL A 1 24 (550A0120) | LF | 312 | $120.00 | $115.00 | $103.65 | $98.50 |
| 77 | Storm sew CL A 1 36 (550A0160) | LF | 899 | $145.00 | $180.00 | $158.61 | $166.25 |
| 78 | Storm sew CL A 2 15 (550A0360) | LF | 51 | $80.00 | $105.00 | $134.90 | $82.00 |
| 79 | SS CL A 1 eqrs 18 (550A4000) | LF | 236 | $125.00 | $130.00 | $119.45 | $111.00 |
| 80 | SS CL A 1 eqrs 30 (550A4300) | LF | 73 | $247.00 | $210.00 | $195.30 | $170.50 |
| 81 | SS CL A 1 eqrs 36 (550A4500) | LF | 73 | $277.00 | $325.00 | $217.62 | $193.00 |
| 82 | SS CL A 2 eqrs 60 (550A5530) | LF | 72 | $470.00 | $545.00 | $670.68 | $382.00 |
| 83 | Storm sewer rem 15 (55100700) | LF | 205 | $20.00 | $27.00 | $28.87 | $16.50 |
| 84 | Storm sewer rem 24 (55101200) | LF | 147 | $30.00 | $29.00 | $28.88 | $16.50 |
| 85 | Storm sewer rem 33 (55101500) | LF | 30 | $50.00 | $30.00 | $33.03 | $26.00 |
| 86 | Storm sewer rem 60 (55102100) | LF | 80 | $70.00 | $45.00 | $90.25 | $26.00 |
| 87 | DI wat MN tee, 12X 6 (56100050) | EACH | 9 | $1,775.00 | $2,400.00 | $2,420.20 | $1,900.00 |
| 88 | DI wat MN red, 12 X 8 (56101160) | EACH | 1 | $1,275.00 | $1,700.00 | $1,853.73 | $1,200.00 |
| 89 | D I water main 6 (56103000) | LF | 260 | $95.00 | $140.00 | $121.80 | $94.00 |
| 90 | D I water main 8 (56103100) | LF | 80 | $100.00 | $140.00 | $143.61 | $104.00 |
| 91 | D I water main 12 (56103300) | LF | 2,822 | $127.00 | $152.00 | $163.19 | $164.00 |
| 92 | Diwm FTGS 6IN 45DEG (56109418) | EACH | 4 | $775.00 | $940.00 | $1,006.26 | $710.00 |
| 93 | Diwm FTGS 8IN 45DEG (56109420) | EACH | 4 | $875.00 | $1,100.00 | $1,163.40 | $925.00 |
| 94 | Diwm FTGS 12IN 45DEG (56109424) | EACH | 8 | $1,547.00 | $2,075.00 | $1,889.76 | $1,560.00 |
| 95 | Fire hydnts to BE rem (56400500) | EACH | 2 | $1,000.00 | $1,050.00 | $1,063.23 | $1,575.00 |
| 96 | Man TA 8 dia T1F CL (60224459) | EACH | 2 | $19,800 | $17,500 | $16,919 | $22,200 |
| 97 | Remov manholes (60500040) | EACH | 2 | $2,000.00 | $1,250.00 | $530.38 | $815.00 |
| 98 | Non SPL waste disposl (66900200) | CY | 4,188 | $64.00 | $110.00 | $99.68 | $90.00 |
| 99 | SPL wast GRD wat disp (66900400) | GAL | 245,000 | $0.40 | $0.80 | $0.42 | $0.75 |
| 100 | Vocs grndwater analys (66900575) | EACH | 1 | $550.00 | $200.00 | $516.47 | $200.00 |
| 101 | Svocs grndwater analy (66900580) | EACH | 1 | $550.00 | $280.00 | $642.84 | $280.00 |
| 102 | Rcra MTL GNDWTR analy (66900605) | EACH | 1 | $550.00 | $720.00 | $478.01 | $720.00 |
| 103 | Reg sub P-const plan (66901001) | LS | 1 | $5,000.00 | $10,000 | $8,791.03 | $33,700 |
| 104 | Reg sub F con report (66901003) | LS | 1 | $4,000.00 | $10,000 | $3,846.08 | $10,000 |
| 105 | Reg sub mon (66901006) | CAL DAY | 110 | $1,000.00 | $1,000.00 | $1,373.60 | $1,000.00 |
| 106 | Mobilization (67100100) | LS | 1 | $447,000 | $340,000 | $165,584 | $393,000 |
| 107 | Epoxy PVT MK LTR-sym (78005100) | SF | 94 | $17.00 | $10.00 | $10.99 | $8.00 |
| 108 | Epoxy PVT MK line 4 (78005110) | LF | 17,081 | $4.00 | $1.30 | $1.43 | $0.98 |
| 109 | Epoxy PVT MK line 24 (78005180) | LF | 196 | $18.00 | $10.50 | $11.54 | $8.00 |
| 110 | Undrgrd C PVC 2 (81028350) | LF | 5,075 | $14.00 | $12.55 | $13.79 | $12.55 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of July 31, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.