IDOT contract 85781 bid tabulation

East Moline, section 22-00159-04-PV. Let by Illinois DOT on July 31, 2026, Rock Island, District 02. 4 bids received; low bid $6,393,210 by Miller Trucking & Excavating Company.

Owner
Illinois DOT
Letting
31 JUL 2026
Pay items
110
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Miller Trucking & Excavating Company$6,393,210Low
2Valley Construction Co.$6,525,687+2.0%
3Gensini Excavating, Inc.$6,549,485+2.0%
4McCarthy Improvement Company$6,559,251+3.0%
IDOT contract 85781: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Miller Trucking & Excavating Company2. Valley Construction Co.3. Gensini Excavating, Inc.4. McCarthy Improvement Company
1T-acer miy mor 2 (A2000316)EACH18$700.00$600.00$824.16$600.00
2T-ginkgo bil AG 2 (A2004512)EACH11$700.00$600.00$1,098.88$600.00
3T-nyssa sylvat 2 (A2005516)EACH19$700.00$600.00$934.05$600.00
4T-plat X acr MC 2 (A2005956)EACH8$700.00$600.00$988.99$600.00
5T-quercus shum 1-3/4 (A2016814)EACH20$1,600.00$600.00$824.16$600.00
6PCC PVMT 8 SPL W IC (LR420129)SY11,139$80.00$85.00$103.65$85.25
7San sew PVC 12 (XX001466)LF1,993$91.00$88.00$201.08$82.75
8San sew service 6 (XX003803)LF250$80.00$95.00$176.74$79.00
9Watermain casing pipe (XX005855)LF206$200.00$80.00$91.95$106.00
10Concrete pad removal (XX005896)SF102,167$2.00$1.40$0.88$2.00
11Gate valve & box 6 (XX006077)EACH2$2,800.00$2,550.00$2,888.33$2,300.00
12Gate valve & box 12 (XX006088)EACH3$5,750.00$6,000.00$6,717.29$5,300.00
13San MH 4 dia (XX006253)EACH10$5,900.00$8,000.00$5,010.81$7,100.00
14Frame & grate special (XX007031)EACH1$1,350.00$1,450.00$1,298.49$1,815.00
15Handhole SP 12" X 12" (XX007125)EACH26$600.00$590.00$648.34$590.00
16Wayfinding sign (XX008269)EACH2$1,750.00$9,500.00$10,109$11,600
17Washout basin (X0326806)LS1$2,500.00$5,000.00$11,774$1,500.00
18Relocate EX mailbox (X0327301)EACH1$500.00$350.00$184.45$300.00
19Trash receptacles (X0327997)EACH3$4,500.00$3,500.00$3,124.39$2,500.00
20Temporary fence SPL (X2011000)LF1,376$10.00$9.00$23.25$15.00
21Swing gate, new (X2300025)EACH2$6,500.00$6,500.00$6,373.50$5,200.00
22PC conc SDWLK 5 CLRD (X4240200)SF460$21.00$15.50$19.59$25.50
23Elast CHK val 24 (X5420124)EACH1$11,500$8,950.00$9,162.77$11,400
24Non-pres conn EX WM (X5610804)EACH3$1,750.00$4,500.00$5,634.44$1,500.00
25Press conn EX WTR MN (X5610806)EACH1$9,100.00$8,250.00$14,522$6,400.00
26Fire hydnt assy comp (X5640150)EACH9$8,970.00$8,750.00$9,696.75$8,000.00
27Man TA 4 dia SPL F&G (X6022230)EACH14$5,400.00$5,150.00$3,213.71$5,300.00
28Man TA 5 dia SPL F&G (X6022930)EACH11$6,900.00$7,550.00$4,441.44$7,400.00
29Man TA 6 dia SPL F&G (X6024090)EACH1$9,100.00$9,800.00$7,621.65$7,600.00
30Double inlet SPL (X6024210)EACH2$5,310.00$6,750.00$5,559.04$7,500.00
31Inlets SPL (X6024240)EACH51$3,300.00$4,000.00$2,584.88$4,100.00
32Fence removal (X6640104)LF2,224$5.00$5.50$8.40$5.00
33CH LK fence SPL (X6640298)LF1,258$43.00$42.60$64.71$40.00
34Traf cont & prot SPL (X7010216)LS1$40,000$12,000$20,329$12,000
35Benches (Z0003850)EACH6$4,000.00$5,500.00$4,650.20$4,600.00
36BLDG remov no 1 (Z0007601)LS1$3,900.00$5,000.00$20,387$4,000.00
37Construction layout (Z0013798)LS1$40,222$32,600$36,263$32,600
38San sew SPL (Z0058000)LF237$101.00$92.50$212.31$85.50
39Trainees (Z0076600)HR2,000$0.80$0.80$0.80$0.80
40Trainees TPG (Z0076604)HR2,000$15.00$15.00$15.00$15.00
41Tree remov 6-15 (20100110)UNIT23$75.00$65.00$120.88$150.00
42Tree remov over 15 (20100210)UNIT60$90.00$70.00$241.75$150.00
43Tree remov acres (20100500)ACRE0.20$10,000$40,000$109,888$20,000
44Earth excavation (20200100)CY5,695$20.00$15.00$14.33$27.85
45Furnished excavation (20400800)CY11,554$40.00$15.00$23.43$22.00
46Trench backfill (20800150)CY1,901$38.00$50.00$25.85$76.50
47Geotech fab F/GR stab (21001000)SY11,481$1.50$2.60$1.67$1.80
48Topsoil F & P 4 (21101615)SY26,206$9.00$4.00$7.31$10.20
49Topsoil F & P 24 (21101685)SY820$30.00$55.00$44.93$36.00
50Seeding CL 2A (25000210)ACRE5.50$3,300.00$3,250.00$3,516.41$3,431.82
51Nitrogen fert nutr (25000400)LB487$2.00$4.00$3.30$4.00
52Phosphorus fert nutr (25000500)LB487$2.00$4.00$3.30$4.00
53Potassium fert nutr (25000600)LB487$2.00$4.00$3.30$4.00
54Mulch method 2 (25100115)ACRE3.40$2,500.00$2,500.00$3,296.64$2,500.00
55Erosion contr blanket (25100630)SY10,049$2.50$2.00$1.81$2.00
56Perimeter eros bar (28000400)LF4,729$3.00$3.95$3.85$3.95
57Inlet & pipe protect (28000500)EACH84$140.00$180.00$247.25$180.00
58Stone riprap CL A3 (28100105)SY9$90.00$90.00$190.90$62.50
59Filter fabric (28200200)SY29$4.00$6.75$22.18$1.75
60Agg subgrade impr 12 (30300112)SY11,481$19.00$20.00$23.23$13.00
61Sub gran mat A 4 (31100300)SY11,481$9.00$12.00$7.42$8.40
62Sub gran mat B 4 (31101200)SY7,794$8.00$15.00$9.32$12.40
63Aggregate-temp access (40201000)TON306$32.00$65.00$32.97$36.00
64PCC driveway pavt 8 (42300400)SY920$92.00$105.00$95.19$93.00
65PC conc sidewalk 4 (42400100)SF56,128$8.00$7.50$7.79$4.35
66PC conc sidewalk 5 (42400200)SF240$12.00$25.00$13.47$21.00
67Detectable warnings (42400800)SF75$50.00$44.00$38.46$40.00
68Pavement rem (44000100)SY18,050$8.00$11.00$8.05$17.00
69Sidewalk rem (44000600)SF688$2.00$3.00$1.26$1.50
70Pipe culvert remov (50105220)LF147$10.00$25.00$29.88$16.50
71Rock exc struct (50200400)CY575$70.00$200.00$0.01$220.00
72PRC flar end sec 24 (54213669)EACH3$2,400.00$2,250.00$2,121.96$2,050.00
73Storm sew CL A 1 12 (550A0050)LF702$70.00$85.00$76.40$56.50
74Storm sew CL A 1 15 (550A0070)LF1,165$80.00$89.00$81.07$63.50
75Storm sew CL A 1 18 (550A0090)LF299$87.00$105.00$85.95$80.00
76Storm sew CL A 1 24 (550A0120)LF312$120.00$115.00$103.65$98.50
77Storm sew CL A 1 36 (550A0160)LF899$145.00$180.00$158.61$166.25
78Storm sew CL A 2 15 (550A0360)LF51$80.00$105.00$134.90$82.00
79SS CL A 1 eqrs 18 (550A4000)LF236$125.00$130.00$119.45$111.00
80SS CL A 1 eqrs 30 (550A4300)LF73$247.00$210.00$195.30$170.50
81SS CL A 1 eqrs 36 (550A4500)LF73$277.00$325.00$217.62$193.00
82SS CL A 2 eqrs 60 (550A5530)LF72$470.00$545.00$670.68$382.00
83Storm sewer rem 15 (55100700)LF205$20.00$27.00$28.87$16.50
84Storm sewer rem 24 (55101200)LF147$30.00$29.00$28.88$16.50
85Storm sewer rem 33 (55101500)LF30$50.00$30.00$33.03$26.00
86Storm sewer rem 60 (55102100)LF80$70.00$45.00$90.25$26.00
87DI wat MN tee, 12X 6 (56100050)EACH9$1,775.00$2,400.00$2,420.20$1,900.00
88DI wat MN red, 12 X 8 (56101160)EACH1$1,275.00$1,700.00$1,853.73$1,200.00
89D I water main 6 (56103000)LF260$95.00$140.00$121.80$94.00
90D I water main 8 (56103100)LF80$100.00$140.00$143.61$104.00
91D I water main 12 (56103300)LF2,822$127.00$152.00$163.19$164.00
92Diwm FTGS 6IN 45DEG (56109418)EACH4$775.00$940.00$1,006.26$710.00
93Diwm FTGS 8IN 45DEG (56109420)EACH4$875.00$1,100.00$1,163.40$925.00
94Diwm FTGS 12IN 45DEG (56109424)EACH8$1,547.00$2,075.00$1,889.76$1,560.00
95Fire hydnts to BE rem (56400500)EACH2$1,000.00$1,050.00$1,063.23$1,575.00
96Man TA 8 dia T1F CL (60224459)EACH2$19,800$17,500$16,919$22,200
97Remov manholes (60500040)EACH2$2,000.00$1,250.00$530.38$815.00
98Non SPL waste disposl (66900200)CY4,188$64.00$110.00$99.68$90.00
99SPL wast GRD wat disp (66900400)GAL245,000$0.40$0.80$0.42$0.75
100Vocs grndwater analys (66900575)EACH1$550.00$200.00$516.47$200.00
101Svocs grndwater analy (66900580)EACH1$550.00$280.00$642.84$280.00
102Rcra MTL GNDWTR analy (66900605)EACH1$550.00$720.00$478.01$720.00
103Reg sub P-const plan (66901001)LS1$5,000.00$10,000$8,791.03$33,700
104Reg sub F con report (66901003)LS1$4,000.00$10,000$3,846.08$10,000
105Reg sub mon (66901006)CAL DAY110$1,000.00$1,000.00$1,373.60$1,000.00
106Mobilization (67100100)LS1$447,000$340,000$165,584$393,000
107Epoxy PVT MK LTR-sym (78005100)SF94$17.00$10.00$10.99$8.00
108Epoxy PVT MK line 4 (78005110)LF17,081$4.00$1.30$1.43$0.98
109Epoxy PVT MK line 24 (78005180)LF196$18.00$10.50$11.54$8.00
110Undrgrd C PVC 2 (81028350)LF5,075$14.00$12.55$13.79$12.55
IDOT contract 85781: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of July 31, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way