IDOT contract 64V40 bid tabulation

Section ((81-2)R. Let by Illinois DOT on June 12, 2026, Rock Island, District 02. 1 bid received; low bid $8,996,139 by Valley Construction Co..

Owner
Illinois DOT
Letting
12 JUN 2026
Pay items
131
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Valley Construction Co.$8,996,139Low
IDOT contract 64V40: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Valley Construction Co.
1Conn to exist sewer (X0322463)EACH5$2,850.00
2Equipment cabinet (X0326263)EACH1$40,192
3Rem CCTV camera (X1400308)EACH1$1,014.00
4DMS removal - IDOT (X1400459)EACH2$3,503.00
5CB TA 4 dia W/SPL F&G (X6022712)EACH7$8,500.00
6Vaults to BE removed (X6026627)EACH2$1,160.00
7Engr FLD off A SPL (X6700410)CAL MO8$5,000.00
8TR C-prot 701401 SPL (X7010805)LS1$200,000
9Temp con bar (perm) (X7040012)LF5,700$85.00
10Imp atn TMP FRN TL3RP (X7060336)EACH8$30,000
11Temp info signing (X7200061)SF176$30.00
12Maint lighting systm (X8000003)CAL MO8$3,977.00
13Undrgrd C multi 7-16 (X8101100)LF4,350$28.00
14Temp lum LED rdwy H (X8211008)EACH35$3,283.00
15Temp light controller (X8250060)EACH1$32,309
16Temp WP 60 CL4 15 MA (X8302163)EACH35$4,755.00
17Main EX TR sig instal (X8500105)CAL MO4$4,384.00
18Focc 96F SNGL mode (X8710023)LF5,750$40.00
19Temp TR signal timing (X8900104)EACH1$12,778
20Rem foc FR conduit (X8950510)LF3,514$4.00
21Stab constr entrance (Z0013797)SY800$35.00
22Construction layout (Z0013798)LS1$21,300
23Communications vault (Z0033052)EACH7$5,634.00
24Temp pavement (Z0062456)SY22,368$112.50
25Tree remov 6-15 (20100110)UNIT15$65.00
26Tree remov over 15 (20100210)UNIT40$65.00
27Tree trunk protection (20101100)EACH10$100.00
28Tree root pruning (20101200)EACH10$125.00
29Tree prun 1-10 (20101300)EACH5$250.00
30Tree prun over 10 (20101350)EACH5$350.00
31Earth excavation (20200100)CY4,525$30.00
32Furnished excavation (20400800)CY13,410$42.00
33Trench backfill (20800150)CY1,207$90.00
34Topsoil exc & plac (21101505)CY4,030$35.00
35Grading & shap ditch (21400100)LF1,950$8.00
36Turf reinf mat (25100900)SY1,596$10.00
37Temp eros contr seed (28000250)LB475$5.00
38Temp ditch checks (28000305)LF280$10.00
39Perimeter eros bar (28000400)LF9,804$3.50
40Inlet filters (28000510)EACH30$350.00
41Aggregate - eros cont (28001000)TON52$110.00
42Temp eros contr blank (28001100)SY21,531$1.50
43Stone riprap CL A4 (28100207)TON23$175.00
44Filter fabric (28200200)SY720$6.00
45HMA BC IL-19.0 N70 (40603085)TON1,131$140.00
46HMA SC IL-9.5 D N70 (40604062)TON1,199$140.00
47Protective coat (42001300)SY11,184$0.01
48HMA surf rem 1 1/2 (44000155)SY5,873$9.00
49HMA surf rem 4 (44000165)SY3,222$11.50
50HMA surf rem 5 (44000169)SY3,447$12.50
51Comb curb gutter rem (44000500)LF1,783$16.00
52Conc barrier remov (44001980)LF681$35.00
53Median removal (44003100)SF269$8.25
54Paved ditch removal (44004000)LF600$19.00
55Paved SHLD removal (44004250)SY8,034$12.00
56CL B patch T4 10 (44200976)SY758$300.00
57CL B patch T4 10 1/2 (44200977)SY466$325.00
58Conc headwall removal (50104400)EACH20$600.00
59PRC flar end sec 24 (54213669)EACH1$2,500.00
60Storm sew CL A 2 12 (550A0340)LF190$130.00
61Storm sew CL A 2 15 (550A0360)LF308$133.00
62Storm sew CL A 2 18 (550A0380)LF573$135.00
63Storm sew CL A 2 24 (550A0410)LF18$215.00
64Conc HDWL for P drain (60100060)EACH20$1,265.00
65CB reconst (60252800)EACH1$9,500.00
66DR STR T4 W/2 T20F&G (60270050)EACH2$12,500
67Remov inlets (60500060)EACH5$2,325.00
68Guardrail remov (63200310)LF3,150$9.00
69HT CBL median barrier rem (63201100)LF125$7.50
70Non SPL waste disposl (66900200)CY600$130.00
71SPL wast GRD wat disp (66900400)GAL100$18.00
72Soil disposal analy (66900530)EACH1$1,750.00
73Reg sub P-const plan (66901001)LS1$3,900.00
74Reg sub F con report (66901003)LS1$1,200.00
75Reg sub mon (66901006)CAL DAY21$1,350.00
76Mobilization (67100100)LS1$535,000
77Traf cont-prot 701421 (70100310)LS1$100.00
78Traf cont-prot 701422 (70100320)LS1$73,500
79Traf cont-prot 701406 (70100700)LS1$100.00
80Traf cont-prot 701401 (70100800)LS1$94,000
81Traf cont-prot 701451 (70100820)LS1$20,000
82Traf cont-prot 701456 (70100825)LS1$7,500.00
83TR cont & prot 701701 (70102635)LS1$100.00
84TR cont & prot 701801 (70102640)LS1$100.00
85TR cont surveillance (70103815)CAL DAY50$900.00
86Changeable message SN (70107025)CAL DAY428$50.00
87Temp PVT MK LTR & sym MU (70303100)SF2,218$4.00
88Temp PVT MK L4 MU (70303120)LF189,248$0.65
89Temp PVT MK L6 MU (70303130)LF12,922$1.00
90Temp PVT MK L8 MU (70303140)LF3,398$1.30
91Temp PVT MK L12 MU (70303160)LF4,398$1.90
92Temp PVT MK L24 MU (70303210)LF740$4.00
93Temp conc barrier (70400100)LF2,612.50$80.00
94Pin temp conc barrier (70400125)EACH991$45.00
95Rel temp conc barrier (70400200)LF2,187.50$65.00
96Imp attn temp FRN TL3 (70600260)EACH5$6,000.00
97Imp attn rel FRD TL3 (70600330)EACH1$3,500.00
98Remov sign panel T1 (72400310)SF47$42.00
99Remov sign panel T3 (72400330)SF42$50.00
100Reloc sin pan assy TB (72400600)EACH2$450.00
101Reloc sign panel T1 (72400710)SF10$35.00
102Reloc sign panel T2 (72400720)SF48$42.00
103Reloc sign panel T3 (72400730)SF30$55.00
104Rem OH sin STR span (73500005)EACH2$14,000
105Remov OH sin STR butt (73600400)EACH1$12,000
106Rem conc FDN-ovhd (73700300)EACH9$5,000.00
107Mod ureth PM LTR-sym (78009000)SF476$4.00
108Mod ureth PM line 4 (78009004)LF59,140$0.65
109Mod ureth PM line 6 (78009006)LF10,032$1.00
110Mod ureth PM line 8 (78009008)LF18,327$1.30
111Mod ureth PM line 12 (78009012)LF2,703$1.90
112Mod ureth PM line 24 (78009024)LF263$4.00
113Temp rais ref PVT MKR (78100200)EACH36$20.00
114PVT MKG rem WTR blast (78300202)SF50,036$0.95
115Elect serv install (80400100)EACH2$2,443.00
116Undrgrd C PVC 4 (81028390)LF666$37.00
117Undrgrd C CNC 2 (81028750)LF50$33.00
118Handhole (81400100)EACH10$4,037.00
119HD handhole (81400200)EACH1$4,318.00
120UD 4#4#6GXLPUSE 1 1/2 (81603110)LF125$79.00
121EC C XLP use 1C 4 (81702140)LF270$6.00
122A CBL 4-1C4 mess wire (81800410)LF8,320$7.00
123Rem LT unit salv (84200500)EACH1$966.00
124Rem LT U no salv (84200600)EACH26$795.00
125Rem pole FDN (84200804)EACH27$1,252.00
126Remov elect serv inst (84500120)EACH2$766.00
127Temp TR sig install (89000100)EACH1$227,561
128Rem elcbl FR con (89502300)LF235$6.00
129Remov EX TS equip (89502375)EACH1$19,905
130Remov EX handhole (89502380)EACH15$1,076.00
131Remov EX conc FDN (89502385)EACH11$1,403.00
IDOT contract 64V40: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy