IDOT contract 85763 bid tabulation

Moline, section 19-00274-00-BT. Let by Illinois DOT on January 16, 2026, Rock Island, District 02. 7 bids received; low bid $975,442 by Valley Construction Co..

Owner
Illinois DOT
Letting
16 JAN 2026
Pay items
80
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Valley Construction Co.$975,442Low
2Miller Trucking & Excavating Company$1,047,431+7.0%
3McCarthy Improvement Company$1,155,181+18%
4Gensini Excavating, Inc.$1,162,387+19%
5Phoenix Corporation of the Quad Cities$1,176,010+21%
6Langman Construction, Inc.$1,177,655+21%
7Brandt Construction Co.$1,437,518+47%
IDOT contract 85763: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Valley Construction Co.2. Miller Trucking & Excavating Company3. McCarthy Improvement Company4. Gensini Excavating, Inc.5. Phoenix Corporation of the Quad Cities6. Langman Construction, Inc.
1PCC PVMT 8 SPL W IC (LR420129)SY1,240$100.00$110.00$107.70$154.78$109.34$89.50
2Remov EX TS equip SPL (XX005703)LS1$508.00$580.00$508.00$1,324.30$1,194.83$506.00
3Relocate EX mailbox (X0327301)EACH1$420.00$250.00$870.00$182.49$55.00$300.00
416" cut & cap (X1200290)EACH2$8,750.00$3,000.00$2,500.00$6,090.02$2,800.00$2,000.00
5Ped signal post 10 FT (X1400367)EACH2$2,376.00$2,700.00$2,376.00$1,840.91$1,660.93$2,376.00
6Earth excavation SPL (X2020410)CY669$20.00$60.00$51.00$26.31$67.50$20.60
7Remove exist riprap (X2810844)SY50$3.25$10.00$29.00$12.87$33.00$20.00
8Retaining wall remov (X5220102)LF110$20.00$29.00$108.00$5.85$9.00$25.00
9Remov EX flar end sec (X5427602)EACH4$300.00$473.00$439.00$1,286.96$400.00$100.00
10Water main remov 16 (X5610716)LF244$110.00$30.00$15.00$42.59$70.00$11.00
11Conn to EX W main 16 (X5630716)EACH2$12,500$6,000.00$2,640.00$6,644.20$9,800.00$3,500.00
12Concrete island SPL (X6061055)SF645$25.00$15.00$27.00$51.27$21.00$25.00
13Traf cont & prot SPL (X7010216)LS1$13,400$20,000$77,800$14,852$13,400$158,000
14Rem stor RE-E SP SPL (X7200053)EACH3$335.68$700.00$1,500.00$1,600.05$350.00$500.00
15Accessible ped signal (X8760200)EACH4$1,859.00$2,140.00$1,859.00$2,109.17$1,902.97$1,859.00
16Mod EX contr cab SPL (X8950212)EACH1$703.00$800.00$703.00$1,035.60$934.35$703.00
17Construction layout (Z0013798)LS1$10,100$7,500.00$10,800$11,970$12,000$25,000
18Tree remov acres (20100500)ACRE0.11$55,000$80,000$80,600$110,836$34,000$4,290.00
19Rem & disp uns matl (20201200)CY185$50.00$35.00$36.00$26.74$41.50$26.00
20Furnished excavation (20400800)CY965$37.50$80.00$71.35$101.95$41.00$60.00
21Trench backfill (20800150)CY468$20.00$65.00$71.75$56.80$30.00$30.00
22Geotech fab F/GR stab (21001000)SY550$2.95$4.00$1.75$2.14$3.00$2.00
23Seeding CL 1 (25000100)ACRE0.15$44,000$3,000.00$10,000$27,709$25,000$25,000
24Seeding CL 3 (25000300)ACRE0.62$34,000$2,500.00$3,500.00$5,541.81$5,000.00$5,000.00
25Nitrogen fert nutr (25000400)LB69$3.00$2.70$3.00$5.54$5.00$5.00
26Phosphorus fert nutr (25000500)LB69$3.00$2.70$3.00$5.54$5.00$5.00
27Potassium fert nutr (25000600)LB69$3.00$2.70$3.00$5.54$5.00$5.00
28Erosion contr blanket (25100630)SY2,986$1.25$4.00$1.25$1.94$1.75$1.75
29Perimeter eros bar (28000400)LF3,273$3.00$5.40$3.00$2.77$4.00$2.50
30Inlet & pipe protect (28000500)EACH5$157.50$418.00$150.00$103.68$200.00$200.00
31Stone riprap CL A4 (28100207)TON53$98.00$85.00$158.00$134.33$115.00$50.00
32Filter fabric (28200200)SY62$9.00$7.00$1.90$2.00$5.00$3.00
33Agg subgrade improve (30300001)CY230$88.00$68.00$77.25$64.93$71.00$30.00
34Agg base cse A 6 (35100500)SY1,564$20.00$13.00$17.30$12.46$20.00$19.00
35Agg base cse A 9 (35100800)SY1,496$25.00$21.00$22.00$17.43$27.00$30.00
36Aggregate-temp access (40201000)TON347$45.00$75.00$42.00$50.02$46.00$15.00
37Bit matls PR CT (40600275)LB3,366$0.01$0.10$1.00$2.22$1.00$0.01
38Bit matls tack CT (40600290)LB306$0.01$0.10$1.00$0.01$1.00$0.01
39HMA SC IL-9.5 D N50 (40604060)TON242$242.00$285.00$300.00$332.51$165.00$223.00
40PC conc sidewalk 6 (42400300)SF1,594.10$13.25$17.00$27.30$8.52$15.75$10.00
41Detectable warnings (42400800)SF122$31.00$55.00$67.00$38.79$45.00$55.00
42Pavement rem (44000100)SY466.80$25.00$12.00$24.00$10.57$24.00$39.80
43Drive pavement rem (44000200)SY702$22.00$20.00$20.40$14.67$20.00$12.00
44Sidewalk rem (44000600)SF106$3.50$5.00$3.00$2.06$9.00$2.00
45Median removal (44003100)SF645$3.50$10.00$4.00$3.99$5.00$3.00
46Aggregate SHLDS A 6 (48100500)SY299$20.00$55.00$27.75$16.32$19.00$15.00
47Conc rem (50102400)CY1$155.00$5,000.00$11,300$5,433.05$7,500.00$7,500.00
48Structure excavation (50200100)CY157$36.00$28.00$63.00$42.11$42.00$45.00
49Conc struct (50300225)CY72.40$1,150.00$1,100.00$1,280.00$1,791.31$1,800.00$1,800.00
50Conc sup-STR (50300255)CY10.80$1,000.00$1,020.00$2,435.00$3,986.02$2,555.00$2,555.00
51Reinf bars, epoxy CTD (50800205)LB9,180$1.75$3.50$4.60$3.33$3.25$3.25
52Bicycle railing (50901720)LF170$209.00$174.00$209.71$232.43$209.71$550.00
53Name plates (51500100)EACH1$875.00$1,600.00$2,045.00$831.27$900.00$900.00
54PRC flar end sec 15 (54213660)EACH1$1,550.00$2,295.00$1,680.00$2,165.80$1,200.00$2,530.00
55Storm sew CL A 2 15 (550A0360)LF10$200.00$120.00$103.00$154.36$136.00$130.00
56Storm sew CL A 2 24 (550A0410)LF188$125.00$135.00$131.00$165.23$99.00$140.00
57Storm sewer rem 24 (55101200)LF10$38.00$55.00$17.50$48.31$35.00$153.00
58Water main 16 (56101000)LF237$250.00$188.00$231.00$231.00$275.00$285.00
59Water valves 16 (56105300)EACH1$9,000.00$11,900$7,915.00$9,359.14$36,800$12,000
60Water serv line 1 (56200300)LF4$225.00$280.00$545.00$302.05$1,200.55$160.00
61Corp stops 1 (56201400)EACH1$2,100.00$1,500.00$1,100.00$1,366.85$375.00$500.00
62Fire hydnts to BE adj (56400300)EACH1$2,200.00$1,845.00$3,300.00$4,260.68$5,200.00$2,500.00
63Man TA 4 dia T1F CL (60218400)EACH1$6,000.00$4,720.00$4,500.00$3,936.96$5,900.00$5,100.00
64Man TA 5 dia T1F CL (60221100)EACH2$8,000.00$6,320.00$7,240.00$5,488.68$7,500.00$7,000.00
65VV adjust (60265700)EACH4$1,750.00$500.00$735.00$926.63$1,450.00$1,000.00
66FR & grates adjust (60300105)EACH1$4,750.00$550.00$1,350.00$1,026.39$1,175.00$1,900.00
67FR & lids adjust (60300305)EACH6$1,950.00$550.00$1,350.00$703.11$700.00$1,000.00
68Traf bar term T6A (63100087)EACH1$4,933.00$9,500.00$4,933.00$5,467.54$4,933.00$4,900.00
69TR bar TRM T1 SPL tan (63100167)EACH1$3,857.00$7,500.00$3,857.00$4,274.95$3,857.00$3,900.00
70Guardrail remov (63200310)LF144$9.82$15.00$9.82$11.08$9.00$9.00
71Mobilization (67100100)LS1$58,000$75,000$65,400$32,035$156,500$60,000
72Paint PVT MK line 4 (78001110)LF471$2.20$2.50$1.00$8.31$2.20$2.00
73Paint PVT MK line 6 (78001130)LF504$3.30$3.50$1.50$11.08$3.30$2.25
74Paint PVT MK line 24 (78001180)LF118$13.20$15.00$6.00$27.71$13.20$5.00
75Undrgrd C PVC 3 (81028370)LF4$78.50$90.00$78.50$252.15$227.50$78.50
76Elcbl C signal 14 2C (87301215)LF120$2.38$2.50$2.38$4.51$4.07$2.38
77Elcbl C signal 14 3C (87301225)LF120$2.77$3.10$2.77$4.51$4.07$2.77
78Conc FDN TY A (87800100)LF6$344.00$375.00$344.00$534.17$481.95$344.00
79Drill EX handhole (87900200)EACH1$428.28$475.00$428.28$580.15$523.43$428.28
80Ped SH LED 1F BM CDT (88102717)EACH2$766.00$825.00$766.00$888.56$801.69$766.00
IDOT contract 85763: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.