IDOT contract 64U29 bid tabulation
Section 138PP&RS. Let by Illinois DOT on March 7, 2025, Henry, District 02. 2 bids received; low bid $2,998,150 by Advanced Asphalt Company.
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 38
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Advanced Asphalt Company | $2,998,150 | Low |
| 2 | Valley Construction Co. | $3,287,624 | +10% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Advanced Asphalt Company | 2. Valley Construction Co. |
|---|---|---|---|---|---|
| 1 | STR refl CR CTRL TRTMT (X4430200) | LF | 57,740 | $1.05 | $0.95 |
| 2 | Exc & GR EX shoulder (20200600) | UNIT | 467 | $70.00 | $180.00 |
| 3 | HMA BC wid 6 1/2 (35600702) | SY | 12,956 | $30.00 | $39.00 |
| 4 | Bit matls PR CT (40600275) | LB | 29,150 | $0.80 | $0.01 |
| 5 | P bit matls tack CT (40600295) | LB | 75,232 | $0.80 | $0.01 |
| 6 | Long joint sealant (40600370) | LF | 30,669 | $2.60 | $2.27 |
| 7 | Matl transfer device (40600405) | TON | 16,946 | $2.00 | $0.01 |
| 8 | HMA BC HM N50 (40600900) | TON | 88 | $200.00 | $175.00 |
| 9 | HMA surf rem butt JT (40600982) | SY | 1,949 | $20.00 | $16.00 |
| 10 | Temporary ramp (40600990) | SY | 258 | $15.00 | $20.00 |
| 11 | HMA repl over patch (40601005) | TON | 1,476 | $100.00 | $120.00 |
| 12 | HMA BC IL-19.0 N50 (40603080) | TON | 10,591 | $83.00 | $95.00 |
| 13 | HMA SC IL-9.5 C N50 (40604050) | TON | 6,355 | $85.00 | $96.00 |
| 14 | Incidental HMA surf (40800050) | TON | 641 | $135.00 | $180.00 |
| 15 | HMA surf rem 1/2 (44000151) | SY | 69,167 | $1.00 | $1.25 |
| 16 | HMA surf rem 6 1/2 (44000175) | SY | 5,164 | $15.00 | $12.00 |
| 17 | HMA RM OV patch 8 (44002232) | SY | 3,295 | $22.00 | $12.00 |
| 18 | Agg wedge SHLD type B (48102100) | TON | 1,204 | $30.00 | $36.00 |
| 19 | Engr field office A (67000400) | CAL MO | 6 | $2,000.00 | $1,000.00 |
| 20 | Mobilization (67100100) | LS | 1 | $180,000 | $195,000 |
| 21 | Traf cont-prot 701201 (70100450) | LS | 1 | $500.00 | $500.00 |
| 22 | Traf cont-prot 701306 (70100460) | LS | 1 | $19,850 | $19,850 |
| 23 | Traf cont-prot 701326 (70100500) | LS | 1 | $100.00 | $100.00 |
| 24 | Traf cont-prot 701336 (70100600) | LS | 1 | $500.00 | $500.00 |
| 25 | TR cont surveillance (70103815) | CAL DAY | 20 | $1.00 | $700.00 |
| 26 | Changeable message SN (70107025) | CAL DAY | 70 | $40.00 | $40.00 |
| 27 | Short term pavt mking (70300100) | LF | 12,356 | $0.90 | $1.50 |
| 28 | SHRT TRM pavt MK rem (70300150) | SF | 1,030 | $2.20 | $2.40 |
| 29 | Sign panel T1 (72000100) | SF | 215.20 | $35.00 | $35.00 |
| 30 | Sign panel T2 (72000200) | SF | 191.50 | $55.00 | $55.00 |
| 31 | Remov sign panel T1 (72400310) | SF | 202.30 | $8.00 | $8.00 |
| 32 | Remov sign panel T2 (72400320) | SF | 189 | $15.00 | $15.00 |
| 33 | Reloc sign panel T1 (72400710) | SF | 36.30 | $15.00 | $15.00 |
| 34 | Teles STL sin support (72800100) | LF | 395 | $22.00 | $22.00 |
| 35 | Wood sin support (73000100) | LF | 293 | $31.00 | $31.00 |
| 36 | Mod ureth PM line 4 (78009004) | LF | 83,394 | $0.60 | $0.60 |
| 37 | GRV RCSD PVT MRKG 5 (78011025) | LF | 83,394 | $0.35 | $0.35 |
| 38 | Raised ref PVT MK rem (78300200) | EACH | 50 | $15.00 | $20.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.