IDOT contract 85765 bid tabulation

Silvis, section 20-00052-00-BT. Let by Illinois DOT on March 7, 2025, Rock Island, District 02. 8 bids received; low bid $1,156,075 by Phoenix Corporation of the Quad Cities.

Owner
Illinois DOT
Letting
07 MAR 2025
Pay items
54
Data through
18 SEP 2026

Bidders

IDOT contract 85765: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Phoenix Corporation of the Quad Cities2. Centennial Contractors of the Quad Cities, Inc.3. McCarthy Improvement Company4. Miller Trucking & Excavating Company5. Valley Construction Co.6. Langman Construction, Inc.
1Relocate EX mailbox (X0327301)EACH1$50.00$150.00$370.00$200.00$400.00$250.00
2Rem & rel SN P&P assy (X2600012)EACH18$350.00$400.00$350.00$320.00$20.00$350.00
3Inlet protection SPL (X2800500)EACH24$300.00$150.00$525.00$350.00$300.00$100.00
4PCC driveway PVT 8 SP (X4230800)SY176$114.00$90.00$105.00$95.00$100.00$100.00
5Remov EX flar end sec (X5427602)EACH8$425.00$171.00$325.00$300.00$240.00$250.00
6Storm sew connection (X5510010)EACH12$600.00$1,015.00$460.00$2,000.00$1,800.00$1,000.00
7Inlets SPL (X6024240)EACH13$3,100.00$3,790.00$4,525.00$4,550.00$3,500.00$3,500.00
8Inlets SPL N6 (X6024252)EACH3$4,600.00$6,325.00$8,350.00$6,000.00$6,750.00$8,000.00
9Sanitary manhole adj (X6026050)EACH2$1,000.00$580.00$1,175.00$2,000.00$2,200.00$1,500.00
10Traf cont & prot SPL (X7010216)LS1$16,800$19,500$86,300$30,000$16,800$45,000
11Tree remov 6-15 (20100110)UNIT50$25.50$100.00$100.00$70.00$65.00$30.00
12Tree remov over 15 (20100210)UNIT72$55.00$110.00$100.00$100.00$55.00$40.00
13Earth excavation (20200100)CY2,595$30.00$38.50$43.00$24.00$20.00$44.00
14Geotech fab F/GR stab (21001000)SY5,926$2.00$1.25$2.00$2.50$2.00$2.00
15Seeding CL 1A (25000110)ACRE0.75$5,880.00$11,000$5,880.00$8,000.00$5,880.00$5,000.00
16Perimeter eros bar (28000400)LF175$6.25$3.00$8.95$3.50$5.00$3.00
17Stone riprap CL A3 (28100105)SY17$38.00$50.00$75.00$35.00$115.00$40.00
18Sub gran mat B 6 (31101400)SY1,661$19.00$10.00$14.00$13.00$23.50$22.00
19Agg base cse B 6 (35101800)SY4,265$14.00$10.00$14.00$12.00$17.00$15.00
20PCC base course 4" (35300060)SY782$30.50$99.00$61.50$105.00$60.00$70.00
21Incidental HMA surf (40800050)TON8$1,200.00$640.00$800.00$440.00$275.00$450.00
22PCC PVT 8 jointed (42000301)SY383$81.50$100.00$122.00$105.00$105.00$97.00
23PCC driveway pavt 7 (42300300)SY470$77.00$81.00$107.00$87.00$84.00$87.00
24PC conc sidewalk 4 (42400100)SF709$6.50$11.00$21.75$12.00$13.50$14.00
25PC conc sidewalk 5 (42400200)SF26,397.50$7.00$8.50$6.65$10.00$9.00$9.25
26Detectable warnings (42400800)SF245.50$38.00$50.00$39.00$52.50$30.00$60.00
27Pavement rem (44000100)SY1,272$19.00$13.00$23.00$13.00$15.00$25.00
28Drive pavement rem (44000200)SY457$10.00$13.00$13.00$13.00$19.00$25.00
29Comb curb gutter rem (44000500)LF287.50$12.00$15.00$13.00$12.50$11.00$15.00
30Sidewalk rem (44000600)SF1,049$1.50$1.50$2.00$5.00$2.00$1.20
31Conc headwall removal (50104400)EACH1$600.00$425.00$325.00$550.00$950.00$750.00
32Pipe culvert remov (50105220)LF353$18.00$11.50$15.50$7.00$27.50$12.00
33End sections 12 (54213447)EACH3$350.00$700.00$205.00$1,100.00$990.00$750.00
34End sections 18 (54213453)EACH1$500.00$815.00$380.00$1,300.00$1,100.00$950.00
35End sections 48 (54213483)EACH1$3,200.00$2,875.00$2,800.00$3,250.00$2,500.00$3,500.00
36Storm sew CL B 1 12 (550B0050)LF553$83.00$77.00$80.00$80.00$100.00$110.00
37Storm sew CL B 1 15 (550B0070)LF1,251$89.00$80.00$85.00$82.00$104.00$115.00
38Storm sew CL B 1 18 (550B0090)LF698$106.00$105.00$109.00$100.00$107.00$120.00
39Storm sew CL B 1 48 (550B0190)LF32$750.00$628.00$254.00$620.00$600.00$400.00
40Storm sewer rem 12 (55100500)LF351$25.00$20.00$15.00$12.00$55.00$15.00
41Storm sewer rem 15 (55100700)LF242$24.00$24.50$15.00$13.00$60.00$15.00
42Rem reloc wat main 6 (56107100)LF30$430.00$440.00$363.00$425.00$240.00$100.00
43Man TA 4 dia T1F CL (60218400)EACH9$4,500.00$4,377.00$4,100.00$5,500.00$4,950.00$5,000.00
44Man TA 7 dia T5F CL (60224437)EACH1$16,000$13,200$14,750$18,000$11,500$16,500
45Inlets TA T8G (60236200)EACH2$1,600.00$3,030.00$2,400.00$2,750.00$2,500.00$3,400.00
46Man reconst (60257900)EACH1$1,800.00$6,215.00$2,450.00$2,200.00$2,450.00$1,250.00
47Remov catch bas (60500050)EACH2$300.00$560.00$1,156.00$400.00$1,000.00$1,000.00
48Remov inlets (60500060)EACH4$300.00$580.00$1,156.00$400.00$800.00$750.00
49Comb CC&G TB6.18 (60604400)LF3,625$34.00$50.00$31.50$55.00$50.00$44.00
50FLD tile jun vault 2D (61133100)EACH2$1,900.00$2,950.00$2,875.00$2,000.00$2,900.00$2,200.00
51Storm sewer spec 8 (61140000)LF39$70.00$64.00$39.00$85.00$80.00$60.00
52Mobilization (67100100)LS1$20,600$80,000$84,000$20,000$85,000$75,000
53Paint PVT MK line 4 (78001110)LF883$3.15$2.50$1.50$2.50$3.00$2.00
54Paint PVT MK line 24 (78001180)LF126$19.00$1.25$6.00$15.00$18.00$5.00
IDOT contract 85765: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy