IDOT contract 68J88 bid tabulation
Section Z[1V-RS-5;D-15D-RS-8;15D-RS-6]. Let by Illinois DOT on April 24, 2026, Peoria, District 04. 2 bids received; low bid $1,996,962 by Advanced Asphalt Company.
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 47
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Advanced Asphalt Company | $1,996,962 | Low |
| 2 | R. A. Cullinan and Son, a div of UCM, Inc. | $2,562,434 | +28% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Advanced Asphalt Company | 2. R. A. Cullinan and Son, a div of UCM, Inc. |
|---|---|---|---|---|---|
| 1 | Constr sta layout (XZ013798) | LS | 1 | $6,000.00 | $3,762.27 |
| 2 | HMA surf rem SPL (X4400196) | SY | 1,024 | $14.00 | $19.99 |
| 3 | Cur-in-PL pipe LNR 15 (X5430215) | LF | 56 | $270.00 | $343.69 |
| 4 | Class SI conc out SPL (X6060097) | CY | 24 | $595.00 | $913.50 |
| 5 | Conc gutter TA SPL (X6062700) | LF | 242 | $60.00 | $99.75 |
| 6 | Linear delin panels 4 (X6350204) | EACH | 47 | $75.00 | $78.75 |
| 7 | GDRL agg eros cont (Z0001002) | TON | 1,014 | $55.00 | $121.80 |
| 8 | Trainees (Z0076600) | HR | 2,000 | $0.80 | $0.80 |
| 9 | Trainees TPG (Z0076604) | HR | 2,000 | $15.00 | $15.00 |
| 10 | Exc & GR EX shoulder (20200600) | UNIT | 9 | $150.00 | $1,102.11 |
| 11 | Agg surf course TY B (40200800) | TON | 134 | $52.56 | $44.10 |
| 12 | P bit matls tack CT (40600295) | LB | 80,516 | $0.85 | $1.13 |
| 13 | Matl transfer device (40600405) | TON | 11,026 | $2.00 | $2.07 |
| 14 | HMA surf rem butt JT (40600982) | SY | 3,289 | $10.00 | $18.57 |
| 15 | Temporary ramp (40600990) | SY | 445 | $15.00 | $8.11 |
| 16 | P HMA BC IL-9.5 N50 (40603205) | TON | 5,153 | $105.00 | $125.43 |
| 17 | P HMA SC IL-9.5 D N70 (40604162) | TON | 6,108 | $105.00 | $132.45 |
| 18 | Incidental HMA surf (40800050) | TON | 297 | $150.00 | $273.27 |
| 19 | HMA surf rem 1 1/2 (44000155) | SY | 53,395 | $1.65 | $2.50 |
| 20 | Drive pavement rem (44000200) | SY | 50 | $30.00 | $30.45 |
| 21 | Gutter rem (44000400) | LF | 400 | $20.00 | $19.95 |
| 22 | Agg wedge SHLD type B (48102100) | TON | 1,442 | $40.00 | $44.10 |
| 23 | HMA shoulders 6 (48203021) | SY | 287 | $40.00 | $70.07 |
| 24 | SPBGR TY A 6FT posts (63000001) | LF | 3,513 | $28.00 | $29.40 |
| 25 | TR bar TRM T1 SPL tan (63100167) | EACH | 17 | $2,950.00 | $3,097.50 |
| 26 | TR bar TRM T1 SPL FLR (63100169) | EACH | 3 | $2,250.00 | $2,362.50 |
| 27 | Guardrail remov (63200310) | LF | 4,487 | $4.00 | $4.20 |
| 28 | Sinusoidal rum STP 14 (64200214) | LF | 16,562 | $0.65 | $1.20 |
| 29 | Mobilization (67100100) | LS | 1 | $7,000.00 | $28,142 |
| 30 | Traf cont-prot 701201 (70100450) | LS | 1 | $100.00 | $6,681.00 |
| 31 | Traf cont-prot 701306 (70100460) | LS | 1 | $21,980 | $4,021.52 |
| 32 | Traf cont-prot 701336 (70100600) | LS | 1 | $100.00 | $3,861.20 |
| 33 | Changeable message SN (70107025) | CAL DAY | 14 | $125.00 | $144.61 |
| 34 | Short term pavt mking (70300100) | LF | 6,780 | $1.50 | $1.52 |
| 35 | SHRT TRM pavt MK rem (70300150) | SF | 754 | $2.00 | $13.38 |
| 36 | Temp PVT MK line 4 - paint (70300221) | LF | 9,278 | $0.27 | $0.28 |
| 37 | Temp PVT MK line 6 - paint (70300241) | LF | 35,603 | $0.23 | $0.24 |
| 38 | Temp PVT MK line 24 - paint (70300281) | LF | 92 | $13.50 | $14.18 |
| 39 | Terminal marker - DA (72501000) | EACH | 20 | $50.00 | $52.50 |
| 40 | Mod ureth PM line 4 (78009004) | LF | 9,278 | $1.05 | $1.10 |
| 41 | Mod ureth PM line 6 (78009006) | LF | 36,728 | $1.05 | $1.10 |
| 42 | Mod ureth PM line 24 (78009024) | LF | 92 | $20.00 | $21.00 |
| 43 | GRV RCSD PVT MRKG 5 (78011025) | LF | 9,278 | $0.15 | $0.16 |
| 44 | GRV RCSD PVT MRKG 7 (78011035) | LF | 35,603 | $0.10 | $0.11 |
| 45 | GRV RCSD PVT MRKG 25 (78011125) | LF | 92 | $9.50 | $9.98 |
| 46 | Raised refl pavt MKR (78100100) | EACH | 232 | $48.00 | $50.40 |
| 47 | Raised ref PVT MK rem (78300200) | EACH | 232 | $13.00 | $24.34 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.