IDOT contract 80B30 bid tabulation
Section 2025-2011-RS. Let by Illinois DOT on April 24, 2026, Cook, District 01. 5 bids received; low bid $4,118,431 by K-Five Construction Corporation.
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 117
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | K-Five Construction Corporation | $4,118,431 | Low |
| 2 | Gallagher Asphalt Corporation | $4,149,889 | +1.0% |
| 3 | Builders Paving, LLC | $4,573,898 | +11% |
| 4 | P. T. Ferro Construction Co. | $4,724,351 | +15% |
| 5 | Austin Tyler Construction, Inc. | $6,012,908 | +46% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. K-Five Construction Corporation | 2. Gallagher Asphalt Corporation | 3. Builders Paving, LLC | 4. P. T. Ferro Construction Co. | 5. Austin Tyler Construction, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Weed cont aquatic (K0029614) | GAL | 1 | $1,000.00 | $1,080.00 | $330.00 | $1,000.00 | $2,029.11 |
| 2 | Weed control teasel (K0029624) | GAL | 5 | $900.00 | $975.00 | $400.00 | $900.00 | $2,241.28 |
| 3 | Prun safety/equip CLR (K1004595) | LS | 1 | $3,500.00 | $3,800.00 | $3,600.00 | $3,500.00 | $41,328 |
| 4 | Constructn layout SPL (X0320050) | LS | 1 | $25,000 | $3,000.00 | $15,000 | $100,000 | $5,439.99 |
| 5 | Weed CTRL NTV LSCP EN (X0327120) | ACRE | 6 | $900.00 | $975.00 | $1,450.00 | $900.00 | $22,195 |
| 6 | Ped signal post 5 FT (X1400378) | EACH | 1 | $1,071.88 | $1,160.00 | $1,100.00 | $1,071.88 | $1,166.21 |
| 7 | Tree remov acres SPL (X2010350) | ACRE | 5 | $7,900.00 | $8,600.00 | $8,200.00 | $7,900.00 | $27,156 |
| 8 | Selective clearing (X2010516) | UNIT | 30 | $300.00 | $330.00 | $310.00 | $300.00 | $533.11 |
| 9 | Grading & shap SHLDRS (X2020110) | UNIT | 15 | $450.00 | $1,200.00 | $290.00 | $200.00 | $172.98 |
| 10 | Temporary ramp SPL (X4060995) | SY | 1,569 | $0.01 | $10.00 | $18.00 | $0.01 | $16.32 |
| 11 | CC&G RMVL repl < = 10 (X4400501) | LF | 110 | $99.00 | $95.00 | $88.00 | $100.00 | $162.91 |
| 12 | CC&G RMVL repl > 10FT (X4400503) | LF | 110 | $89.00 | $75.00 | $86.00 | $100.00 | $99.07 |
| 13 | SS cleaned 12 (X5537800) | LF | 1,800 | $6.00 | $6.50 | $18.00 | $1.00 | $1.09 |
| 14 | FR & lids adjust SPL (X6030310) | EACH | 5 | $2,125.00 | $850.00 | $1,700.00 | $1,500.00 | $1,645.54 |
| 15 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $3,500.00 | $500.00 | $4,000.00 | $1.00 | $3,264.00 |
| 16 | Temp info signing (X7200061) | SF | 412 | $20.00 | $21.70 | $21.00 | $17.00 | $21.76 |
| 17 | Accessible ped signal (X8760200) | EACH | 8 | $1,820.23 | $1,975.00 | $1,850.00 | $1,820.23 | $2,339.19 |
| 18 | Conc FDN TY A 12D (X8780012) | LF | 4 | $413.98 | $450.00 | $420.00 | $413.98 | $450.41 |
| 19 | Det loop repl (X8860105) | LF | 887 | $25.94 | $28.00 | $26.00 | $25.94 | $28.22 |
| 20 | Drainage STR cleaned (Z0018500) | EACH | 36 | $450.00 | $488.00 | $800.00 | $365.00 | $397.12 |
| 21 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 1 | $1,008.00 | $1,093.00 | $1,100.00 | $1,008.00 | $1,096.70 |
| 22 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 |
| 23 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 24 | Tree remov 6-15 (20100110) | UNIT | 14 | $30.00 | $33.00 | $33.00 | $30.00 | $81.60 |
| 25 | Earth excavation (20200100) | CY | 5,035 | $62.15 | $0.01 | $85.00 | $45.00 | $58.17 |
| 26 | Rem & disp uns matl (20201200) | CY | 760 | $64.33 | $50.00 | $65.00 | $45.00 | $51.38 |
| 27 | Geotech fab F/GR stab (21001000) | SY | 12,552 | $0.01 | $0.70 | $1.50 | $0.01 | $2.72 |
| 28 | Topsoil F & P 4 (21101615) | SY | 3,436 | $6.00 | $6.50 | $4.00 | $3.00 | $10.88 |
| 29 | Grading & shap ditch (21400100) | LF | 300 | $10.00 | $12.00 | $18.00 | $30.00 | $50.83 |
| 30 | Seeding CL 1B (25000115) | ACRE | 2 | $10,000 | $10,850 | $4,600.00 | $6,776.00 | $4,221.42 |
| 31 | Seeding CL 2A (25000210) | ACRE | 0.75 | $10,000 | $10,850 | $2,800.00 | $6,776.00 | $4,526.07 |
| 32 | Nitrogen fert nutr (25000400) | LB | 155 | $3.00 | $3.25 | $3.00 | $3.00 | $3.26 |
| 33 | Phosphorus fert nutr (25000500) | LB | 155 | $3.00 | $3.25 | $3.00 | $3.00 | $3.26 |
| 34 | Potassium fert nutr (25000600) | LB | 155 | $3.00 | $3.25 | $3.00 | $3.00 | $3.26 |
| 35 | Interseed CL 4A (25003312) | ACRE | 5 | $3,500.00 | $3,800.00 | $1,059.50 | $3,630.00 | $3,394.56 |
| 36 | Supple watering (25200200) | UNIT | 15 | $100.00 | $108.50 | $50.00 | $250.00 | $43.52 |
| 37 | Temp eros contr seed (28000250) | LB | 71 | $10.00 | $10.85 | $11.00 | $10.00 | $8.70 |
| 38 | Perimeter eros bar (28000400) | LF | 14,952 | $3.00 | $3.25 | $2.70 | $2.50 | $4.08 |
| 39 | Agg subgrade improve (30300001) | CY | 760 | $50.00 | $50.00 | $36.00 | $75.00 | $64.44 |
| 40 | Agg subgrade impr 12 (30300112) | SY | 8,443 | $40.00 | $28.00 | $36.00 | $33.00 | $39.10 |
| 41 | Bit matls PR CT (40600275) | LB | 20,411 | $0.01 | $0.01 | $0.01 | $0.01 | $0.38 |
| 42 | Bit matls tack CT (40600290) | LB | 35,514 | $0.01 | $0.01 | $0.01 | $0.01 | $0.38 |
| 43 | Long joint sealant (40600370) | LF | 23,699 | $2.65 | $2.95 | $3.50 | $3.25 | $3.59 |
| 44 | Mix CR JTS flangewys (40600400) | TON | 11 | $50.00 | $200.00 | $900.00 | $700.00 | $335.08 |
| 45 | HMA surf rem butt JT (40600982) | SY | 682 | $0.01 | $38.00 | $15.00 | $0.01 | $22.87 |
| 46 | HMA BC IL-9.5 N70 (40602985) | TON | 4,861 | $90.00 | $110.00 | $89.00 | $95.00 | $90.79 |
| 47 | P HMA SC IL-9.5 E N70 (40604172) | TON | 4,468 | $125.00 | $135.00 | $99.00 | $115.00 | $109.02 |
| 48 | P HMA SC SMA 9.5 F N80 (40605026) | TON | 573 | $140.00 | $165.00 | $138.00 | $140.00 | $130.96 |
| 49 | Protective coat (42001300) | SY | 300 | $0.10 | $0.01 | $3.00 | $0.01 | $5.44 |
| 50 | PC conc sidewalk 5 (42400200) | SF | 1,412 | $15.25 | $8.50 | $16.00 | $13.50 | $13.00 |
| 51 | Detectable warnings (42400800) | SF | 155 | $33.00 | $30.00 | $60.00 | $20.00 | $43.52 |
| 52 | Pavement rem (44000100) | SY | 1,944 | $18.00 | $12.50 | $18.00 | $27.50 | $49.08 |
| 53 | HMA surf rem 1 3/4 (44000156) | SY | 1,990 | $2.00 | $4.25 | $8.00 | $3.50 | $10.57 |
| 54 | HMA surf rem 2 (44000157) | SY | 5,116 | $4.75 | $5.50 | $8.00 | $4.00 | $5.34 |
| 55 | HMA surf rem 3 3/4 (44000164) | SY | 43,398 | $4.80 | $5.30 | $8.50 | $5.50 | $5.59 |
| 56 | Drive pavement rem (44000200) | SY | 250 | $15.00 | $13.00 | $23.00 | $30.00 | $35.39 |
| 57 | Comb curb gutter rem (44000500) | LF | 380 | $17.00 | $22.00 | $11.00 | $25.00 | $14.12 |
| 58 | Sidewalk rem (44000600) | SF | 1,587 | $5.25 | $3.50 | $5.50 | $3.50 | $2.70 |
| 59 | Median removal (PD) (44003510) | SF | 1,372 | $0.25 | $1.10 | $3.00 | $2.00 | $3.42 |
| 60 | CL D patch T1 12 (44201785) | SY | 240 | $40.00 | $140.00 | $40.00 | $75.00 | $216.95 |
| 61 | CL D patch T2 12 (44201789) | SY | 720 | $40.00 | $75.00 | $40.00 | $75.00 | $216.95 |
| 62 | CL D patch T3 12 (44201794) | SY | 1,430 | $40.00 | $60.00 | $40.00 | $100.00 | $216.95 |
| 63 | CL D patch T4 12 (44201796) | SY | 2,380 | $40.00 | $60.00 | $40.00 | $85.00 | $216.95 |
| 64 | Saw cuts (44213200) | LF | 15,703 | $2.45 | $2.40 | $2.70 | $0.01 | $4.95 |
| 65 | Agg wedge SHLD type B (48102100) | TON | 564 | $38.00 | $50.00 | $44.00 | $50.00 | $47.15 |
| 66 | HMA shoulders 8 (48203029) | SY | 9,072 | $45.00 | $105.00 | $52.00 | $58.00 | $43.18 |
| 67 | FR & lids adjust (60300305) | EACH | 12 | $465.00 | $390.00 | $1,100.00 | $500.00 | $430.42 |
| 68 | Class SI conc outlet (60600095) | CY | 12 | $350.00 | $700.00 | $850.00 | $670.00 | $1,632.00 |
| 69 | Comb CC&G TB6.12 (60603800) | LF | 257 | $61.00 | $35.00 | $85.00 | $70.00 | $63.68 |
| 70 | Box cul to BE cleaned (60905305) | LF | 945 | $20.00 | $21.70 | $62.00 | $0.01 | $130.56 |
| 71 | Non SPL waste disposl (66900200) | CY | 4,720 | $70.00 | $0.01 | $92.00 | $90.00 | $120.61 |
| 72 | Soil disposal analy (66900530) | EACH | 6 | $1,450.00 | $1,573.00 | $870.00 | $870.00 | $946.55 |
| 73 | Reg sub P-const plan (66901001) | LS | 1 | $3,100.00 | $3,364.00 | $6,525.00 | $6,525.00 | $7,099.18 |
| 74 | Reg sub F con report (66901003) | LS | 1 | $1,200.00 | $1,300.00 | $500.00 | $500.00 | $543.99 |
| 75 | Reg sub mon (66901006) | CAL DAY | 10 | $680.00 | $737.00 | $715.00 | $715.00 | $777.91 |
| 76 | Mobilization (67100100) | LS | 1 | $247,000 | $195,500 | $270,000 | $275,000 | $375,359 |
| 77 | Traf cont-prot 701201 (70100450) | LS | 1 | $100.00 | $108.50 | $200.00 | $1.00 | $108.80 |
| 78 | Traf cont-prot 701306 (70100460) | LS | 1 | $100.00 | $108.50 | $200.00 | $1.00 | $108.80 |
| 79 | Traf cont-prot 701326 (70100500) | LS | 1 | $100.00 | $108.50 | $200.00 | $400,000 | $108.80 |
| 80 | Traf cont-prot 701336 (70100600) | LS | 1 | $100.00 | $108.50 | $200.00 | $1.00 | $108.80 |
| 81 | TR cont & prot 701501 (70102620) | LS | 1 | $66,700 | $94,000 | $64,662 | $1.00 | $23,392 |
| 82 | TR cont & prot 701606 (70102625) | LS | 1 | $500.00 | $542.00 | $4,898.00 | $1.00 | $543.99 |
| 83 | TR cont & prot 701701 (70102635) | LS | 1 | $100.00 | $108.50 | $200.00 | $1.00 | $108.80 |
| 84 | TR cont & prot 701801 (70102640) | LS | 1 | $100.00 | $108.50 | $200.00 | $1.00 | $108.80 |
| 85 | TR cont surveillance (70103815) | CAL DAY | 80 | $100.00 | $108.50 | $200.00 | $0.01 | $108.80 |
| 86 | Short term pavt mking (70300100) | LF | 10,072 | $2.00 | $0.01 | $1.00 | $0.01 | $1.63 |
| 87 | SHRT TRM pavt MK rem (70300150) | SF | 24,173 | $0.01 | $0.01 | $0.01 | $0.01 | $1.09 |
| 88 | Temp PVT MK LTR & sym paint (70300211) | SF | 1,636 | $2.30 | $0.01 | $0.01 | $0.01 | $2.50 |
| 89 | Temp PVT MK line 4 - paint (70300221) | LF | 112,554 | $0.20 | $0.01 | $0.01 | $0.01 | $0.22 |
| 90 | Temp PVT MK line 6 - paint (70300241) | LF | 9,102 | $0.35 | $0.01 | $0.01 | $0.01 | $0.38 |
| 91 | Temp PVT MK line 8 - paint (70300251) | LF | 874 | $1.00 | $0.01 | $0.01 | $0.01 | $1.09 |
| 92 | Temp PVT MK line 12 - paint (70300261) | LF | 4,524 | $1.15 | $0.01 | $0.01 | $0.01 | $1.25 |
| 93 | Temp PVT MK line 24 - paint (70300281) | LF | 508 | $2.30 | $0.01 | $0.01 | $0.01 | $2.50 |
| 94 | Temp PVT MK L4 T4 tape (70307120) | LF | 72,489 | $0.01 | $0.01 | $0.01 | $0.01 | $1.63 |
| 95 | THPL PVT MK LTR & sym (78000100) | SF | 818 | $4.50 | $4.90 | $4.50 | $5.35 | $4.90 |
| 96 | THPL PVT MK line 4 (78000200) | LF | 56,277 | $0.65 | $0.70 | $0.65 | $0.82 | $0.71 |
| 97 | THPL PVT MK line 6 (78000400) | LF | 4,551 | $1.00 | $1.10 | $1.00 | $1.33 | $1.09 |
| 98 | THPL PVT MK line 8 (78000500) | LF | 437 | $2.25 | $2.45 | $2.25 | $1.78 | $2.45 |
| 99 | THPL PVT MK line 12 (78000600) | LF | 2,262 | $2.25 | $2.45 | $2.25 | $2.29 | $2.45 |
| 100 | THPL PVT MK line 24 (78000650) | LF | 254 | $4.50 | $4.90 | $4.50 | $5.35 | $4.90 |
| 101 | Raised refl pavt MKR (78100100) | EACH | 686 | $37.50 | $40.70 | $37.50 | $47.50 | $40.80 |
| 102 | Raised ref PVT MK rem (78300200) | EACH | 686 | $15.00 | $0.01 | $22.00 | $0.01 | $16.32 |
| 103 | Undrgrd C galvs 3 (81028220) | LF | 54 | $66.25 | $72.00 | $67.00 | $66.25 | $72.08 |
| 104 | Main EX TR sig instal (85000200) | EACH | 1 | $7,425.86 | $8,055.00 | $10,000 | $7,425.86 | $8,079.32 |
| 105 | Elcbl C signal 14 2C (87301215) | LF | 1,186 | $3.75 | $4.05 | $4.20 | $3.75 | $4.08 |
| 106 | Elcbl C signal 14 3C (87301225) | LF | 253 | $3.95 | $4.30 | $4.40 | $3.95 | $4.30 |
| 107 | Elcbl C signal 14 5C (87301245) | LF | 253 | $4.45 | $4.80 | $5.00 | $4.45 | $4.84 |
| 108 | Elcbl C egrdc 6 1C (87301900) | LF | 48 | $4.60 | $5.00 | $5.20 | $4.60 | $5.01 |
| 109 | TS post galvs 16 (87502500) | EACH | 1 | $2,435.62 | $2,642.00 | $2,600.00 | $2,435.62 | $2,649.95 |
| 110 | Conc FDN TY A (87800100) | LF | 4 | $387.55 | $420.00 | $450.00 | $387.55 | $421.65 |
| 111 | Drill EX handhole (87900200) | EACH | 2 | $437.63 | $475.00 | $450.00 | $437.63 | $476.14 |
| 112 | Det loop T1 (88600100) | LF | 165 | $25.94 | $28.00 | $28.00 | $25.94 | $28.22 |
| 113 | Reloc EX sig head (89500100) | EACH | 1 | $259.42 | $280.00 | $300.00 | $259.42 | $282.06 |
| 114 | Reloc EX ped sig head (89500200) | EACH | 1 | $306.34 | $330.00 | $330.00 | $306.34 | $333.29 |
| 115 | Remov EX TS equip (89502375) | EACH | 1 | $310.80 | $335.00 | $330.00 | $310.80 | $338.15 |
| 116 | Rebuild EX handhole (89502376) | EACH | 1 | $3,162.28 | $3,430.00 | $3,500.00 | $3,162.28 | $3,440.55 |
| 117 | Remov EX conc FDN (89502385) | EACH | 1 | $445.20 | $485.00 | $500.00 | $445.20 | $484.38 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.