IDOT contract 66C06 bid tabulation
Section (G)RS-6&(F)RS-3. Let by Illinois DOT on June 12, 2026, Grundy, District 03. 4 bids received; low bid $4,185,244 by D. Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 78
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D. Construction, Inc. | $4,185,244 | Low |
| 2 | Gallagher Asphalt Corporation | $4,526,993 | +8.0% |
| 3 | Austin Tyler Construction, Inc. | $5,439,250 | +30% |
| 4 | P. T. Ferro Construction Co. | $5,645,311 | +35% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D. Construction, Inc. | 2. Gallagher Asphalt Corporation | 3. Austin Tyler Construction, Inc. | 4. P. T. Ferro Construction Co. |
|---|---|---|---|---|---|---|---|
| 1 | Non-shrink grout (X0325451) | CF | 3 | $1,000.00 | $95.00 | $115.00 | $500.00 |
| 2 | Clean EX end section (X0325893) | EACH | 1 | $550.00 | $495.00 | $2,400.00 | $2,500.00 |
| 3 | Rem & relay P C SPL (X1200207) | LF | 8 | $250.00 | $435.00 | $300.00 | $250.00 |
| 4 | Furnished excav SPL (X2040805) | CY | 22 | $100.00 | $130.00 | $425.00 | $150.00 |
| 5 | HMA surf rem var DP (X4401198) | SY | 16,471 | $2.50 | $6.90 | $6.50 | $5.00 |
| 6 | Rem & relay end sect (X5427601) | EACH | 1 | $1,000.00 | $1,450.00 | $2,400.00 | $2,500.00 |
| 7 | Remov EX flar end sec (X5427602) | EACH | 2 | $500.00 | $490.00 | $1,200.00 | $1,000.00 |
| 8 | Exist field tile rem (X6110073) | LF | 10 | $50.00 | $90.00 | $225.00 | $100.00 |
| 9 | Linear delin panels 4 (X6350204) | EACH | 82 | $60.50 | $55.00 | $52.00 | $55.00 |
| 10 | Linear delin panels 6 (X6350206) | EACH | 18 | $71.50 | $65.00 | $74.00 | $65.00 |
| 11 | Furn perm surv MKRS (X6670106) | EACH | 8 | $300.00 | $240.00 | $365.00 | $1,500.00 |
| 12 | Temp info signing (X7200061) | SF | 42 | $30.00 | $34.00 | $23.50 | $20.00 |
| 13 | TS BKPLT LVRD FPL SPL (X8820014) | EACH | 46 | $755.70 | $650.00 | $745.00 | $687.00 |
| 14 | Loop det testing (X8860100) | EACH | 3 | $2,200.00 | $1,950.00 | $2,170.00 | $2,000.00 |
| 15 | Clean EX inlets (Z0010615) | EACH | 1 | $550.00 | $485.00 | $540.00 | $2,500.00 |
| 16 | Conc curb repair (Z0012500) | LF | 46 | $30.00 | $170.00 | $160.00 | $150.00 |
| 17 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 | $0.80 | $0.80 |
| 18 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 | $15.00 | $15.00 |
| 19 | Earth excavation (20200100) | CY | 5 | $200.00 | $175.00 | $425.00 | $250.00 |
| 20 | Grading & shap ditch (21400100) | LF | 1,075 | $20.00 | $15.00 | $33.50 | $28.00 |
| 21 | Seeding CL 2A (25000210) | ACRE | 0.15 | $5,234.00 | $6,500.00 | $60,000 | $4,840.00 |
| 22 | Nitrogen fert nutr (25000400) | LB | 14 | $3.30 | $2.90 | $19.55 | $3.00 |
| 23 | Phosphorus fert nutr (25000500) | LB | 14 | $3.30 | $2.90 | $19.55 | $3.00 |
| 24 | Potassium fert nutr (25000600) | LB | 14 | $3.30 | $2.90 | $19.55 | $3.00 |
| 25 | Erosion contr blanket (25100630) | SY | 716 | $16.50 | $1.00 | $13.00 | $15.00 |
| 26 | Stone dump rip CL A4 (28100707) | SY | 245 | $60.00 | $95.00 | $115.00 | $140.00 |
| 27 | Filter fabric (28200200) | SY | 245 | $5.00 | $4.00 | $5.50 | $5.00 |
| 28 | Agg surf course TY B (40200800) | TON | 91 | $50.00 | $122.00 | $125.00 | $50.00 |
| 29 | Bit matls tack CT (40600290) | LB | 127,119 | $0.01 | $0.01 | $0.01 | $0.01 |
| 30 | Long joint sealant (40600370) | LF | 45,139 | $2.59 | $2.50 | $2.60 | $2.65 |
| 31 | Mix CR JTS flangewys (40600400) | TON | 40 | $0.01 | $450.00 | $300.00 | $500.00 |
| 32 | Matl transfer device (40600405) | TON | 27,967 | $2.50 | $12.00 | $2.80 | $4.00 |
| 33 | Temporary ramp (40600990) | SY | 890 | $0.01 | $0.01 | $0.01 | $0.01 |
| 34 | HMA BC IL-19.0 N70 (40603085) | TON | 16,781 | $65.00 | $67.00 | $85.50 | $85.00 |
| 35 | HMA SC IL-9.5 D N70 (40604062) | TON | 8,046 | $69.50 | $73.00 | $92.00 | $89.00 |
| 36 | P HMA SC IL-9.5 D N70 (40604162) | TON | 3,140 | $84.00 | $92.00 | $103.00 | $95.00 |
| 37 | Incidental HMA surf (40800050) | TON | 2,395 | $105.00 | $111.00 | $110.00 | $115.00 |
| 38 | HMA surf rem 3 3/4 (44000164) | SY | 133,178 | $3.00 | $3.35 | $5.25 | $5.00 |
| 39 | CL D patch T2 15 (44201827) | SY | 574 | $150.00 | $164.00 | $200.00 | $150.00 |
| 40 | CL D patch T3 15 (44201831) | SY | 120 | $150.00 | $159.00 | $200.00 | $185.00 |
| 41 | CL D patch T4 15 (44201833) | SY | 1,035 | $150.00 | $148.00 | $200.00 | $150.00 |
| 42 | Agg wedge SHLD type B (48102100) | TON | 2,953 | $31.00 | $25.70 | $48.00 | $27.00 |
| 43 | Pipe culvert remov (50105220) | LF | 24 | $20.00 | $58.00 | $40.00 | $50.00 |
| 44 | P cul CL A 1 24 (542A0229) | LF | 24 | $100.00 | $440.00 | $160.00 | $150.00 |
| 45 | PRC flar end sec 24 (54213669) | EACH | 2 | $2,000.00 | $2,950.00 | $2,050.00 | $2,500.00 |
| 46 | Pipe drains 6 (60100915) | LF | 10 | $100.00 | $150.00 | $240.00 | $150.00 |
| 47 | Box cul to BE cleaned (60905305) | LF | 317 | $33.00 | $29.00 | $130.00 | $220.00 |
| 48 | Pipe culv cleaned 24 (60920024) | LF | 108 | $27.50 | $25.00 | $54.00 | $50.00 |
| 49 | Pipe culv cleaned 30 (60920030) | LF | 50 | $22.00 | $20.00 | $70.00 | $50.00 |
| 50 | Delineators (63500105) | EACH | 36 | $104.50 | $80.00 | $58.00 | $95.00 |
| 51 | Non SPL waste disposl (66900200) | CY | 154 | $85.00 | $50.00 | $120.00 | $90.00 |
| 52 | Soil disposal analy (66900530) | EACH | 4 | $1,650.00 | $850.00 | $950.00 | $875.00 |
| 53 | Reg sub P-const plan (66901001) | LS | 1 | $2,250.00 | $5,500.00 | $6,300.00 | $5,800.00 |
| 54 | Reg sub F con report (66901003) | LS | 1 | $2,250.00 | $450.00 | $545.00 | $500.00 |
| 55 | Reg sub mon (66901006) | CAL DAY | 5 | $1,000.00 | $650.00 | $775.00 | $715.00 |
| 56 | Engr field office A (67000400) | CAL MO | 4 | $4,000.00 | $2,900.00 | $3,500.00 | $5,000.00 |
| 57 | Mobilization (67100100) | LS | 1 | $157,000 | $247,777 | $325,000 | $300,000 |
| 58 | Traf cont-prot 701201 (70100450) | LS | 1 | $0.01 | $49,777 | $8,500.00 | $500,000 |
| 59 | Traf cont-prot 701206 (70100455) | LS | 1 | $0.01 | $277.00 | $8,500.00 | $100.00 |
| 60 | Traf cont-prot 701306 (70100460) | LS | 1 | $173,275 | $7,977.00 | $8,500.00 | $100.00 |
| 61 | Night work zone light (70200100) | LS | 1 | $5,000.00 | $999.00 | $6,500.00 | $1.00 |
| 62 | Short term pavt mking (70300100) | LF | 54,408 | $0.01 | $0.01 | $0.01 | $0.01 |
| 63 | SHRT TRM pavt MK rem (70300150) | SF | 18,136 | $0.01 | $0.01 | $0.01 | $0.01 |
| 64 | Sign panel T1 (72000100) | SF | 138 | $55.00 | $39.00 | $38.00 | $50.00 |
| 65 | Remov sign panel T1 (72400310) | SF | 138 | $27.50 | $19.50 | $8.60 | $25.00 |
| 66 | Pref PL PM TD STD LTR/sym (78004600) | SF | 1,513 | $51.98 | $9.50 | $32.50 | $30.00 |
| 67 | Pref PL PM TD STD L 8 (78004640) | LF | 8,894 | $8.09 | $7.00 | $9.75 | $9.00 |
| 68 | Pref PL PM TD STD L24 (78004720) | LF | 608 | $23.10 | $18.00 | $32.50 | $30.00 |
| 69 | Mod ureth PM line 4 (78009004) | LF | 223,162 | $0.58 | $0.65 | $0.64 | $0.59 |
| 70 | Mod ureth PM line 6 (78009006) | LF | 14,362 | $1.16 | $0.90 | $1.05 | $1.00 |
| 71 | Mod ureth PM line 12 (78009012) | LF | 4,345 | $2.89 | $2.50 | $4.00 | $3.75 |
| 72 | GRV RCSD PM LTR & sym (78011000) | SF | 1,513 | $9.24 | $2.70 | $5.40 | $5.00 |
| 73 | GRV RCSD PVT MRKG 9 (78011045) | LF | 8,894 | $1.74 | $1.30 | $2.15 | $2.00 |
| 74 | GRV RCSD PVT MRKG 25 (78011125) | LF | 608 | $9.24 | $3.30 | $5.40 | $5.00 |
| 75 | Raised refl pavt MKR (78100100) | EACH | 863 | $46.20 | $34.00 | $47.75 | $55.00 |
| 76 | Curb reflectors (78200020) | EACH | 42 | $46.20 | $23.00 | $16.25 | $15.00 |
| 77 | Raised ref PVT MK rem (78300200) | EACH | 863 | $8.00 | $0.01 | $27.75 | $0.01 |
| 78 | Det loop T1 (88600100) | LF | 2,066 | $38.50 | $34.00 | $38.00 | $35.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.