IDOT contract 80B14 bid tabulation

Section 2025-1087-RS. Let by Illinois DOT on January 16, 2026, Will, District 01. 4 bids received; low bid $2,039,223 by D. Construction, Inc..

Owner
Illinois DOT
Letting
16 JAN 2026
Pay items
55
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1D. Construction, Inc.$2,039,223Low
2P. T. Ferro Construction Co.$2,049,2980.0%
3Austin Tyler Construction, Inc.$2,297,279+13%
4Gallagher Asphalt Corporation$2,346,694+15%
IDOT contract 80B14: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. D. Construction, Inc.2. P. T. Ferro Construction Co.3. Austin Tyler Construction, Inc.4. Gallagher Asphalt Corporation
1Weed cont NTV LSC RMN (X2000001)UNIT1$2,750.00$1,000.00$1,000.00$1,900.00
2Temporary ramp SPL (X4060995)SY24$0.01$50.00$0.01$0.01
3CC&G RMVL repl < = 10 (X4400501)LF2,326$45.00$40.00$68.00$30.00
4CC&G RMVL repl > 10FT (X4400503)LF2,326$40.00$40.00$58.00$56.00
5Class SI conc out SPL (X6060097)CY2$600.00$0.01$1,170.00$906.15
6Engrs FLD ofc TY A D1 (X6700407)CAL MO6$5,000.00$1.00$0.01$500.00
7Temp info signing (X7200061)SF51$25.00$18.00$18.00$19.75
8Det loop repl (X8860105)LF1,866$20.85$18.95$18.95$19.00
9Drainage STR cleaned (Z0018500)EACH10$450.00$425.00$500.00$423.00
10Earth excavation (20200100)CY10$100.00$400.00$133.00$325.00
11Topsoil F & P 4 (21101615)SY1,034$7.15$6.50$7.00$12.52
12Nitrogen fert nutr (25000400)LB19$3.30$3.00$3.00$25.00
13Phosphorus fert nutr (25000500)LB19$3.30$3.00$3.00$25.00
14Potassium fert nutr (25000600)LB19$3.30$3.00$3.00$25.00
15Sodding salt tolerant (25200110)SY1,034$12.65$11.50$14.00$18.50
16Supple watering (25200200)UNIT10$132.00$120.00$250.00$246.00
17Bit matls tack CT (40600290)LB36,202$0.01$0.01$0.01$1.00
18Long joint sealant (40600370)LF11,236$3.22$6.00$2.70$3.30
19Mix CR JTS flangewys (40600400)TON81$0.01$0.01$350.00$0.01
20HMA surf rem butt JT (40600982)SY728$0.01$0.01$20.00$27.00
21HMA BC IL-9.5 N70 (40602985)TON6,007$70.00$76.00$69.00$94.50
22P HMA SC SMA 9.5 F N80 (40605026)TON5,257$105.00$120.00$108.00$128.00
23HMA surf rem 3 3/4 (44000164)SY53,633$2.75$2.80$3.00$4.00
24Median removal (PD) (44003510)SF10,209$2.75$0.01$0.01$3.00
25Welded wire reinf (44200050)SY3$50.00$12.00$5.00$21.00
26CL D patch T1 12 (44201785)SY135$101.00$0.01$180.00$120.00
27CL D patch T2 12 (44201789)SY1,073$101.00$50.00$180.00$90.00
28CL D patch T3 12 (44201794)SY805$101.00$50.00$150.00$70.00
29CL D patch T4 12 (44201796)SY671$101.00$50.00$150.00$60.00
30Tie bars 3/4 (44213204)EACH12$20.00$50.00$22.00$6.30
31Class SI conc outlet (60600095)CY2$600.00$3,000.00$1,170.00$909.25
32Conc median surf 4 (60618300)SF10,209$7.00$0.01$6.00$6.30
33Shoulder rum strip 16 (64200116)LF14,453$0.36$0.60$1.00$0.45
34Non SPL waste disposl (66900200)CY10$150.00$300.00$78.00$213.00
35Mobilization (67100100)LS1$75,000$120,000$75,000$140,000
36Traf cont-prot 701421 (70100310)LS1$86,175$51,100$5,000.00$6,352.00
37TR cont & prot 701601 (70102630)LS1$0.01$51,100$5,000.00$6,352.00
38TR cont & prot 701701 (70102635)LS1$0.01$51,100$5,000.00$6,352.00
39Short term pavt mking (70300100)LF16,138$0.01$1.50$2.00$0.01
40SHRT TRM pavt MK rem (70300150)SF5,379$0.01$0.01$2.00$0.01
41Temp PVT MK LTR & sym paint (70300211)SF512$0.01$0.01$1.75$0.01
42Temp PVT MK line 4 - paint (70300221)LF22,434$0.01$0.35$0.35$0.01
43Temp PVT MK line 6 - paint (70300241)LF1,695$0.01$0.53$0.53$0.01
44Temp PVT MK line 8 - paint (70300251)LF3,521$0.01$0.01$0.70$0.01
45Temp PVT MK line 12 - paint (70300261)LF1,624$0.01$0.01$1.06$0.01
46Temp PVT MK line 24 - paint (70300281)LF329$0.01$0.01$1.60$0.01
47Rem & rel sign panel asmbly TA (72400205)EACH1$357.50$150.00$150.00$164.80
48THPL PVT MK LTR & sym (78000100)SF552$6.60$6.00$6.50$6.00
49THPL PVT MK line 4 (78000200)LF22,434$0.66$0.60$0.75$0.60
50THPL PVT MK line 6 (78000400)LF1,695$1.21$1.10$1.15$1.10
51THPL PVT MK line 8 (78000500)LF3,521$1.65$1.50$1.50$1.50
52THPL PVT MK line 12 (78000600)LF1,624$3.30$3.00$2.50$3.00
53THPL PVT MK line 24 (78000650)LF329$6.60$6.00$6.50$6.00
54Raised refl pavt MKR (78100100)EACH132$55.00$60.00$75.00$50.00
55Raised ref PVT MK rem (78300200)EACH132$10.00$0.01$59.00$0.01
IDOT contract 80B14: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy