IDOT contract 62X01 bid tabulation

Section 2024-981-RS. Let by Illinois DOT on September 19, 2025, Will, District 01. 6 bids received; low bid $7,332,294 by Iroquois Paving Corporation.

Owner
Illinois DOT
Letting
19 SEP 2025
Pay items
94
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Iroquois Paving Corporation$7,332,294Low
2Gallagher Asphalt Corporation$8,444,208+15%
3D. Construction, Inc.$8,444,929+15%
4Austin Tyler Construction, Inc.$8,617,240+18%
5P. T. Ferro Construction Co.$8,834,677+20%
6K-Five Construction Corporation$11,441,329+56%
IDOT contract 62X01: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Iroquois Paving Corporation2. Gallagher Asphalt Corporation3. D. Construction, Inc.4. Austin Tyler Construction, Inc.5. P. T. Ferro Construction Co.6. K-Five Construction Corporation
1Prun safety/equip CLR (K1004595)LS1$3,500.00$3,900.00$3,850.00$3,745.00$3,500.00$3,500.00
2Weed CTRL NTV LSCP EN (X0327120)ACRE1.37$3,675.00$3,700.00$3,690.50$3,590.00$3,355.00$3,675.00
3Tree remov acres SPL (X2010350)ACRE1.37$6,500.00$7,250.00$7,150.00$6,955.00$6,500.00$6,500.00
4Selective clearing (X2010516)UNIT66$300.00$325.00$330.00$320.00$300.00$300.00
5Grading & shap SHLDRS (X2020110)UNIT485$0.01$160.00$20.00$67.70$0.01$25.61
6Temporary ramp SPL (X4060995)SY451$0.01$24.00$20.00$0.01$0.01$14.67
7CC&G RMVL repl < = 10 (X4400501)LF780$60.00$115.00$45.00$95.85$65.00$55.00
8SS cleaned 12 (X5537800)LF75$7.00$3.20$7.70$1.00$10.00$1.00
9Centerln rum strip 16 (X6420114)LF34,027$0.25$0.15$0.19$0.36$0.65$0.33
10Engrs FLD ofc TY A D1 (X6700407)CAL MO18$3,000.00$2,800.00$5,000.00$2,000.00$1.00$3,500.00
11Speed display trailer (X7010410)CAL MO12$500.00$600.00$1,200.00$800.00$500.00$500.00
12Temp info signing (X7200061)SF1,475$35.00$6.80$25.00$26.75$0.01$5.00
13HS THPL PM LN 4 (X7800815)LF101,996$0.35$0.70$0.31$0.30$0.35$0.35
14Construction layout (Z0013798)LS1$33,000$75,000$20,000$53,300$50,000$30,000
15Drainage STR cleaned (Z0018500)EACH5$1,500.00$420.00$770.00$640.00$600.00$600.00
16Trainees (Z0076600)HR500$0.80$0.80$0.80$0.80$0.80$0.80
17Trainees TPG (Z0076604)HR500$15.00$15.00$15.00$15.00$15.00$15.00
18Tree remov 6-15 (20100110)UNIT354$27.00$29.50$29.70$28.90$27.00$27.00
19Tree remov over 15 (20100210)UNIT710$34.00$37.00$37.40$36.35$34.00$34.00
20Tree prun over 10 (20101350)EACH1$50.00$55.00$55.00$53.50$50.00$50.00
21Earth excavation (20200100)CY16,450$0.01$34.50$24.00$53.40$40.00$57.00
22Rem & disp uns matl (20201200)CY8,972$0.01$41.40$71.00$44.75$38.00$72.00
23Geotech fab F/GR stab (21001000)SY6,729$4.00$8.50$3.00$2.65$2.30$5.00
24Topsoil F & P 4 (21101615)SY250$12.25$12.20$12.27$11.90$11.15$12.25
25Grading & shap ditch (21400100)LF8,138$8.13$10.00$15.00$16.25$6.00$7.90
26Seeding CL 2A (25000210)ACRE1$5,275.00$5,250.00$5,252.50$5,100.00$4,775.00$5,258.24
27Interseed CL 2A (25003210)ACRE1.37$2,950.00$3,000.00$2,887.50$2,809.00$2,625.00$2,950.00
28Erosion contr blanket (25100630)SY5,426$1.50$1.50$1.45$1.40$1.32$1.49
29Sodding salt tolerant (25200110)SY250$17.00$17.00$17.05$16.50$15.50$16.95
30Agg subgrade improve (30300001)CY8,972$0.01$35.00$0.01$61.00$55.00$97.45
31Agg subgrade impr 12 (30300112)SY26,915$22.90$23.00$16.00$19.80$22.00$33.00
32Bit matls PR CT (40600275)LB60,559$0.01$0.01$0.01$0.01$0.01$0.75
33Bit matls tack CT (40600290)LB94,405$0.01$0.01$0.01$0.01$0.01$1.25
34Long joint sealant (40600370)LF37,229$3.25$3.75$3.12$3.15$3.25$3.02
35Mix CR JTS flangewys (40600400)TON167$0.01$100.00$0.01$0.01$0.01$50.00
36HMA surf rem butt JT (40600982)SY270$0.01$0.01$20.00$0.01$0.01$1.00
37HMA BC IL-9.5 N70 (40602985)TON15,605$81.00$79.00$77.40$71.70$82.00$93.38
38HMA SC IL-9.5 D N70 (40604062)TON13,654$83.50$79.00$83.00$75.25$82.00$95.18
39Protective coat (42101300)SY384$2.10$0.01$1.00$5.35$3.00$2.00
40PC conc sidewalk 5 (42400200)SF1,120$12.15$8.00$9.00$10.90$12.00$13.00
41Pavement rem (44000100)SY5,383$10.25$32.00$12.00$20.75$17.00$25.00
42HMA surf rem 3 3/4 (44000164)SY139,325$2.65$2.70$3.25$2.85$3.50$5.00
43Sidewalk rem (44000600)SF1,120$4.50$4.40$3.00$2.80$3.00$2.00
44Median removal (44003100)SF19,816$2.25$1.40$3.00$2.10$1.90$3.00
45Median removal (PD) (44003510)SF1,744$1.25$3.50$2.00$6.70$3.00$0.49
46CL D patch T1 10 (44201761)SY36$150.00$375.00$120.00$200.00$145.00$136.00
47CL D patch T2 10 (44201765)SY1,576$132.00$140.00$98.00$110.00$50.00$136.00
48CL D patch T3 10 (44201769)SY160$120.00$135.00$98.00$105.00$110.00$136.00
49CL D patch T4 10 (44201771)SY267$105.00$125.00$98.00$98.00$100.00$136.00
50Agg wedge SHLD type B (48102100)TON5,430$33.00$21.00$30.00$25.00$28.00$37.31
51HMA shoulders 10 (48203037)SY26,915$60.00$44.00$44.55$47.00$48.00$56.00
52CB reconst (60252800)EACH1$1,800.00$2,600.00$1,500.00$1,975.00$2,000.00$2,800.00
53Man reconst (60257900)EACH2$1,800.00$2,250.00$1,500.00$1,975.00$2,500.00$2,800.00
54FR & grates adjust (60300105)EACH5$450.00$750.00$1,000.00$420.00$650.00$800.00
55FR & lids adjust (60300305)EACH3$450.00$750.00$1,000.00$420.00$650.00$800.00
56FR & grates T24 (60404950)EACH1$350.00$495.00$600.00$530.00$1,000.00$1,200.00
57FR & lids T1 OL (60406000)EACH3$420.00$450.00$600.00$375.00$1,000.00$1,200.00
58Conc median surf 6 (60618320)SF19,816$9.15$5.50$7.00$8.75$7.50$11.00
59Pipe culv cleaned 12 (60920012)LF1,139$5.00$3.40$5.50$5.35$5.00$5.00
60Pipe culv cleaned 15 (60920015)LF332$5.00$3.40$5.50$6.40$6.00$6.00
61Pipe culv cleaned 18 (60920018)LF590$6.00$3.40$6.60$7.50$7.00$7.00
62SPBGR TY A 6FT posts (63000001)LF313$31.50$47.50$34.23$33.30$31.12$31.12
63TR bar TRM T1 SPL tan (63100167)EACH8$3,844.00$4,250.00$4,228.40$4,100.00$3,844.00$3,844.00
64Guardrail remov (63200310)LF600$6.40$11.25$7.04$6.85$6.40$6.40
65Shoulder rum strip 8 (64200108)LF34,477$0.25$0.15$0.19$0.36$0.40$0.32
66Non SPL waste disposl (66900200)CY4,315$68.00$80.00$85.00$62.00$82.00$63.00
67Soil disposal analy (66900530)EACH5$1,520.00$1,450.00$1,815.00$1,360.00$1,270.00$1,270.00
68Reg sub P-const plan (66901001)LS1$3,000.00$3,900.00$3,025.00$3,640.00$3,400.00$3,400.00
69Reg sub F con report (66901003)LS1$3,000.00$575.00$3,025.00$535.00$500.00$500.00
70Reg sub mon (66901006)CAL DAY35$1,400.00$900.00$990.00$815.00$760.00$760.00
71Mobilization (67100100)LS1$439,000$500,000$478,000$526,265$500,000$504,400
72Traf cont-prot 701201 (70100450)LS1$16,500$100,000$179,500$5,350.00$1,250.00$52,000
73Traf cont-prot 701306 (70100460)LS1$16,500$1.15$0.01$5,350.00$18,000$1,000.00
74Traf cont-prot 701326 (70100500)LS1$16,500$1.15$0.01$26,750$370,000$50,000
75Traf cont-prot 701336 (70100600)LS1$16,500$1.15$0.01$5,350.00$18,000$500.00
76TR cont & prot 701701 (70102637)EACH1$750.00$1.15$0.01$5,350.00$750.00$1,000.00
77TR cont surveillance (70103815)CAL DAY35$350.00$500.00$450.00$265.00$1,750.00$400.00
78Short term pavt mking (70300100)LF71,265$0.01$0.01$1.50$0.01$0.01$1.00
79SHRT TRM pavt MK rem (70300150)SF49,659$0.01$0.01$1.00$0.01$0.01$2.00
80Temp PVT MK LTR & sym paint (70300211)SF292$0.01$0.01$5.00$0.01$0.01$2.50
81Temp PVT MK line 4 - paint (70300221)LF203,992$0.01$0.01$0.25$0.01$0.01$0.28
82Temp PVT MK line 6 - paint (70300241)LF1,132$0.01$0.01$0.75$0.01$0.01$0.38
83Temp PVT MK line 12 - paint (70300261)LF14,940$0.01$0.01$0.75$0.01$0.01$0.80
84Temp PVT MK line 24 - paint (70300281)LF534$0.01$0.01$5.00$0.01$0.01$2.00
85Temp PVT MK L4 T4 tape (70307120)LF148,976$0.01$0.01$1.50$0.01$0.01$1.22
86Sign panel T2 (72000200)SF144$35.00$45.00$50.00$53.50$35.00$50.00
87Terminal marker - DA (72501000)EACH12$60.00$45.00$66.00$64.20$60.00$60.00
88THPL PVT MK LTR & sym (78000100)SF146$6.00$5.75$9.90$9.50$6.00$6.00
89THPL PVT MK line 4 (78000200)LF5,892$0.65$1.45$0.63$0.59$1.65$0.65
90THPL PVT MK line 6 (78000400)LF566$1.00$0.80$3.30$2.38$1.00$1.00
91THPL PVT MK line 12 (78000600)LF7,470$3.00$2.90$4.40$3.56$3.00$3.00
92THPL PVT MK line 24 (78000650)LF267$6.00$5.00$9.90$9.50$12.00$6.00
93Raised refl pavt MKR (78100100)EACH740$45.00$39.00$48.40$45.00$55.00$45.00
94Raised ref PVT MK rem (78300200)EACH740$0.01$0.01$10.00$13.00$0.01$10.00
IDOT contract 62X01: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy