IDOT contract 61L81 bid tabulation

Romeoville, section 25-00080-00-RS. Let by Illinois DOT on January 16, 2026, Will, District 01. 6 bids received; low bid $596,750 by K-Five Construction Corporation.

Owner
Illinois DOT
Letting
16 JAN 2026
Pay items
40
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1K-Five Construction Corporation$596,750Low
2Builders Paving, LLC$599,945+1.0%
3P. T. Ferro Construction Co.$614,124+3.0%
4D. Construction, Inc.$627,682+5.0%
5Austin Tyler Construction, Inc.$654,651+10%
6Gallagher Asphalt Corporation$676,768+13%
IDOT contract 61L81: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. K-Five Construction Corporation2. Builders Paving, LLC3. P. T. Ferro Construction Co.4. D. Construction, Inc.5. Austin Tyler Construction, Inc.6. Gallagher Asphalt Corporation
1Sanitary manhole adj (X6026050)EACH2$2,325.00$2,325.00$1,000.00$1,000.00$1,475.00$750.00
2FR & lids adjust SPL (X6030310)EACH4$2,150.00$2,150.00$1,000.00$1,000.00$1,475.00$1,075.00
3Temp info signing (X7200061)SF100$20.00$20.00$20.00$30.00$15.00$15.00
4Drain util STR adj (Z0017400)EACH35$485.00$485.00$400.00$600.00$300.00$475.00
5Drain util STR recon (Z0017700)EACH1$1,850.00$1,850.00$1,500.00$1,200.00$1,000.00$1,450.00
6Topsoil F & P 4 (21101615)SY415$5.25$5.25$3.00$5.78$3.00$5.25
7Seeding CL 1A (25000110)ACRE0.25$4,500.00$4,500.00$1,210.00$4,950.00$1,210.00$4,500.00
8Nitrogen fert nutr (25000400)LB25$3.00$3.00$3.00$3.30$3.00$3.00
9Phosphorus fert nutr (25000500)LB25$3.00$3.00$3.00$3.30$3.00$3.00
10Potassium fert nutr (25000600)LB25$3.00$3.00$3.00$3.30$3.00$3.00
11Erosion contr blanket (25100630)SY415$7.75$7.75$18.00$8.53$17.00$7.75
12Inlet filters (28000510)EACH37$200.00$200.00$0.01$275.00$100.00$250.00
13Aggregate-temp access (40201000)TON180$80.00$52.90$0.01$30.00$0.01$30.00
14Bit matls tack CT (40600290)LB10,565$0.01$1.05$0.01$0.01$0.01$0.01
15Long joint sealant (40600370)LF4,185$4.20$5.11$5.00$5.15$4.50$5.25
16Mix CR JTS flangewys (40600400)TON20$50.00$200.00$0.01$0.01$350.00$50.00
17HMA surf rem butt JT (40600982)SY75$20.00$20.00$0.01$20.00$30.00$17.50
18HMA BC IL-19.0 N70 (40603085)TON1,975$76.00$61.00$76.00$78.00$80.00$87.50
19HMA SC IL-9.5 D N70 (40604062)TON1,755$81.00$65.00$80.00$82.00$84.00$91.00
20PCC driveway pavt 6 (42300200)SY200$114.33$96.60$100.00$90.00$84.00$87.00
21HMA surf rem 4 (44000165)SY15,655$4.25$4.50$4.50$3.70$5.00$3.85
22Drive pavement rem (44000200)SY200$7.00$29.40$20.00$12.00$30.00$25.50
23Comb curb gutter rem (44000500)LF1,855$7.00$16.80$17.00$8.00$16.00$15.30
24CL D patch T1 10 (44201761)SY5$20.00$200.00$150.00$240.00$520.00$339.00
25CL D patch T2 10 (44201765)SY5$20.00$200.00$150.00$240.00$520.00$333.00
26CL D patch T3 10 (44201769)SY15$20.00$150.00$125.00$160.00$450.00$248.00
27CL D patch T4 10 (44201771)SY100$20.00$85.00$90.00$112.00$160.00$142.00
28Comb CC&G TB6.12 (60603800)LF1,855$33.50$45.40$40.00$32.00$40.00$43.00
29Mobilization (67100100)LS1$26,698$24,000$30,000$37,654$28,000$40,600
30TR cont & prot 701501 (70102620)LS1$100.00$100.00$100.00$24,000$2,403.00$2,609.14
31TR cont & prot 701502 (70102622)LS1$10,000$6,000.00$6,000.00$0.01$2,403.00$2,609.14
32TR cont & prot 701701 (70102635)LS1$100.00$100.00$100.00$0.01$2,403.00$2,609.14
33Changeable message SN (70107025)CAL DAY35$40.00$40.00$40.00$75.00$35.00$35.00
34Short term pavt mking (70300100)LF2,370$1.00$1.38$3.50$1.50$2.00$0.01
35SHRT TRM pavt MK rem (70300150)SF790$2.00$0.01$0.01$4.40$2.00$0.01
36THPL PVT MK LTR & sym (78000100)SF430$5.50$5.50$5.75$6.33$5.50$5.50
37THPL PVT MK line 4 (78000200)LF9,555$0.78$0.78$0.80$0.88$0.78$0.80
38THPL PVT MK line 6 (78000400)LF375$1.20$1.20$0.95$1.05$1.20$1.20
39THPL PVT MK line 12 (78000600)LF255$2.40$2.40$3.00$3.30$2.40$2.40
40THPL PVT MK line 24 (78000650)LF25$5.50$5.50$6.00$6.60$5.00$5.50
IDOT contract 61L81: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy