IDOT contract 80B05 bid tabulation

Section 2025-2018-RS,SW. Let by Illinois DOT on April 24, 2026, Will, District 01. 5 bids received; low bid $1,433,491 by D. Construction, Inc..

Owner
Illinois DOT
Letting
24 APR 2026
Pay items
81
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1D. Construction, Inc.$1,433,491Low
2Gallagher Asphalt Corporation$1,477,478+3.0%
3Austin Tyler Construction, Inc.$1,544,966+8.0%
4P. T. Ferro Construction Co.$1,743,861+22%
5Acura Inc.$1,890,295+32%
IDOT contract 80B05: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. D. Construction, Inc.2. Gallagher Asphalt Corporation3. Austin Tyler Construction, Inc.4. P. T. Ferro Construction Co.5. Acura Inc.
1Tree care (K0026700)EACH20$220.00$550.00$170.00$500.00$500.00
2Constructn layout SPL (X0320050)LS1$26,500$20,000$20,000$25,000$25,000
3Ped signal post 10 FT (X1400367)EACH2$2,321.73$2,000.00$1,375.00$1,374.54$2,200.00
4Ped signal post 5 FT (X1400378)EACH8$1,665.00$1,300.00$940.00$939.17$1,500.00
5Tree remov acres SPL (X2010350)ACRE0.83$13,200$1,200.00$25,400$12,000$13,000
6Selective clearing (X2010516)UNIT1.50$660.00$650.00$2,270.00$600.00$800.00
7Prun safety/equip CLR (X2100002)UNIT24$300.00$610.00$1,040.00$275.00$200.00
8Prof DMD GRND con PVT (X4202010)SY29,039$5.45$6.60$6.10$7.00$10.00
9CC&G RMVL repl < = 10 (X4400501)LF390$55.00$84.00$85.00$100.00$110.00
10CC&G RMVL repl > 10FT (X4400503)LF1,540$45.00$72.00$70.00$80.00$100.00
11SS cleaned 12 (X5537800)LF600$6.60$1.50$1.00$1.00$2.00
12Engrs FLD ofc TY A D1 (X6700407)CAL MO12$5,000.00$2,000.00$3,000.00$2,500.00$4,000.00
13Traf cont & prot SPL (X7010216)LS1$40,000$49,000$35,000$325,000$50,000
14Temp info signing (X7200061)SF105.60$25.00$26.00$25.00$25.00$30.00
15Accessible ped signal (X8760200)EACH22$2,300.00$1,900.00$1,848.00$1,848.10$2,100.00
16Conc FDN TY A 12D (X8780012)LF40$431.93$375.00$328.00$327.90$420.00
17Drainage STR cleaned (Z0018500)EACH30$484.00$400.00$400.00$365.00$500.00
18RE-optimize TR sig sys 1 (Z0033044)EACH3$786.50$750.00$630.00$630.00$800.00
19Tree remov 6-15 (20100110)UNIT26$33.00$31.00$42.00$30.00$33.00
20Tree remov over 15 (20100210)UNIT63$44.00$42.00$63.00$40.00$44.00
21Tree prun 1-10 (20101300)EACH1$220.00$210.00$250.00$200.00$225.00
22Tree prun over 10 (20101350)EACH3$275.00$265.00$400.00$250.00$270.00
23Earth excavation (20200100)CY138$60.00$80.00$75.00$140.00$80.00
24Topsoil F & P 4 (21101615)SY325$5.50$2.00$15.00$5.00$15.00
25Sodding (25200100)SY325$27.50$30.00$28.00$55.00$25.00
26Bit matls tack CT (40600290)LB1,125$0.01$0.01$0.01$0.01$6.00
27Protective coat (42001300)SY1,880$1.00$1.00$3.00$0.01$2.00
28PCC driveway pavt 6 (42300200)SY40$100.00$165.00$111.00$135.00$100.00
29PC conc sidewalk 5 (42400200)SF12,068$10.00$10.00$10.00$12.00$12.00
30PC conc sidewalk 8 (42400410)SF293$12.00$20.00$16.00$20.00$12.00
31Detectable warnings (42400800)SF1,344$35.00$25.00$31.00$19.00$45.00
32Pavement rem (44000100)SY266$25.00$17.50$14.00$42.00$40.00
33Drive pavement rem (44000200)SY40$15.00$45.00$45.00$30.00$30.00
34Sidewalk rem (44000600)SF12,367$2.50$3.00$3.00$2.40$3.00
35Median removal (44003100)SF227$10.00$15.00$17.00$3.00$10.00
36CL B patch T2 10 (44200970)SY1,055$190.00$220.00$175.00$185.00$175.00
37Dowel bars 1 1/2 (44201299)EACH820$20.00$18.50$27.00$21.00$25.00
38CL D patch T2 3 (44201682)SY70$40.00$80.00$63.00$70.00$100.00
39CL D patch T3 3 (44201683)SY110$40.00$80.00$63.00$55.00$90.00
40Saw cuts (44213200)LF3,560$5.00$10.00$3.00$0.01$5.00
41JT CR RT PCC pav/SHLD (45200100)LF46,740$0.11$0.12$2.20$0.10$2.40
42JT or crack filling (45200300)LB13,354$3.08$3.00$3.24$2.80$3.50
43CB adjust (60250200)EACH10$1,000.00$400.00$624.00$425.00$1,000.00
44CB reconst (60252800)EACH3$1,500.00$1,750.00$1,873.00$850.00$2,500.00
45Man adjust (60255500)EACH21$900.00$400.00$624.00$550.00$1,000.00
46Man reconst (60257900)EACH3$2,500.00$1,750.00$1,873.00$1,000.00$2,500.00
47Conc median surf 4 (60618300)SF227$19.00$10.00$12.00$11.50$15.00
48Guardrail remov (63200310)LF10$100.00$50.00$56.00$100.00$50.00
49Non SPL waste disposl (66900200)CY138$80.00$55.00$0.01$100.00$150.00
50Soil disposal analy (66900530)EACH5$1,650.00$1,450.00$845.00$1,450.00$1,600.00
51Reg sub P-const plan (66901001)LS1$2,250.00$3,100.00$6,900.00$3,100.00$5,000.00
52Reg sub F con report (66901003)LS1$2,250.00$1,200.00$500.00$1,200.00$1,000.00
53Reg sub mon (66901006)CAL DAY5$1,000.00$680.00$740.00$680.00$1,100.00
54Mobilization (67100100)LS1$80,000$85,932$90,000$92,000$113,000
55Changeable message SN (70107025)CAL DAY30$100.00$90.00$90.00$90.00$100.00
56Temp PVT MK L4 T4 tape (70307120)LF19,742$1.25$1.30$1.30$1.30$1.40
57Temp PVT MK L6 T4 tape (70307130)LF1,175$1.50$2.00$2.00$2.00$2.10
58Temp PVT MK L12 T4 tape (70307160)LF5,015$4.00$4.00$4.00$0.01$4.20
59Temp PVT MK L24 T4 tape (70307210)LF248$8.00$8.00$8.00$8.00$9.00
60Paint PVT MK line 8 (78001140)LF280$3.96$3.60$3.60$3.60$3.80
61Pref PL PM TD STD L 7 (78004635)LF280$13.75$12.50$12.50$12.50$14.00
62Mod ureth PM LTR-sym (78009000)SF1,595$4.40$4.00$4.00$4.00$4.30
63Mod ureth PM line 4 (78009004)LF19,742$0.72$0.65$0.65$0.65$0.70
64Mod ureth PM line 6 (78009006)LF1,175$1.10$1.00$1.00$1.00$1.10
65Mod ureth PM line 8 (78009008)LF299$1.65$1.50$1.50$1.50$1.60
66Mod ureth PM line 12 (78009012)LF5,015$2.20$2.00$2.00$2.00$2.20
67Mod ureth PM line 24 (78009024)LF248$4.40$4.00$4.00$4.00$5.00
68Raised refl pavt MKR (78100100)EACH450$46.75$42.00$42.50$50.00$50.00
69Raised ref PVT MK rem (78300200)EACH450$10.00$15.00$10.00$0.01$55.00
70PVT MKG rem WTR blast (78300202)SF4,000$4.00$2.50$2.50$2.50$2.55
71Undrgrd C galvs 2 (81028200)LF196$87.34$72.00$135.42$135.42$75.00
72Main EX TR sig instal (85000200)EACH3$5,783.03$4,850.00$525.00$525.00$5,000.00
73Elcbl C signal 14 2C (87301215)LF2,401$6.59$5.40$9.83$9.83$5.50
74Elcbl C signal 14 3C (87301225)LF198$3.81$3.20$11.46$11.46$3.25
75Elcbl C egrdc 6 1C (87301900)LF1,294$8.68$7.30$9.53$9.53$7.50
76Drill EX handhole (87900200)EACH10$1,232.73$1,000.00$556.75$556.75$1,100.00
77Ped SH LED 1F BM CDT (88102717)EACH2$1,067.95$900.00$943.55$943.55$1,000.00
78Det loop T1 (88600100)LF770$36.60$30.25$36.75$36.75$32.00
79Mod EX contr (89502200)EACH1$1,259.86$1,100.00$525.00$525.00$1,200.00
80Rem elcbl FR con (89502300)LF1,709$0.30$0.25$2.93$2.93$0.30
81Remov EX TS equip (89502375)EACH2$463.10$400.00$1,492.63$1,492.63$400.00
IDOT contract 80B05: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy