IDOT contract 80B05 bid tabulation
Section 2025-2018-RS,SW. Let by Illinois DOT on April 24, 2026, Will, District 01. 5 bids received; low bid $1,433,491 by D. Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 81
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D. Construction, Inc. | $1,433,491 | Low |
| 2 | Gallagher Asphalt Corporation | $1,477,478 | +3.0% |
| 3 | Austin Tyler Construction, Inc. | $1,544,966 | +8.0% |
| 4 | P. T. Ferro Construction Co. | $1,743,861 | +22% |
| 5 | Acura Inc. | $1,890,295 | +32% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D. Construction, Inc. | 2. Gallagher Asphalt Corporation | 3. Austin Tyler Construction, Inc. | 4. P. T. Ferro Construction Co. | 5. Acura Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Tree care (K0026700) | EACH | 20 | $220.00 | $550.00 | $170.00 | $500.00 | $500.00 |
| 2 | Constructn layout SPL (X0320050) | LS | 1 | $26,500 | $20,000 | $20,000 | $25,000 | $25,000 |
| 3 | Ped signal post 10 FT (X1400367) | EACH | 2 | $2,321.73 | $2,000.00 | $1,375.00 | $1,374.54 | $2,200.00 |
| 4 | Ped signal post 5 FT (X1400378) | EACH | 8 | $1,665.00 | $1,300.00 | $940.00 | $939.17 | $1,500.00 |
| 5 | Tree remov acres SPL (X2010350) | ACRE | 0.83 | $13,200 | $1,200.00 | $25,400 | $12,000 | $13,000 |
| 6 | Selective clearing (X2010516) | UNIT | 1.50 | $660.00 | $650.00 | $2,270.00 | $600.00 | $800.00 |
| 7 | Prun safety/equip CLR (X2100002) | UNIT | 24 | $300.00 | $610.00 | $1,040.00 | $275.00 | $200.00 |
| 8 | Prof DMD GRND con PVT (X4202010) | SY | 29,039 | $5.45 | $6.60 | $6.10 | $7.00 | $10.00 |
| 9 | CC&G RMVL repl < = 10 (X4400501) | LF | 390 | $55.00 | $84.00 | $85.00 | $100.00 | $110.00 |
| 10 | CC&G RMVL repl > 10FT (X4400503) | LF | 1,540 | $45.00 | $72.00 | $70.00 | $80.00 | $100.00 |
| 11 | SS cleaned 12 (X5537800) | LF | 600 | $6.60 | $1.50 | $1.00 | $1.00 | $2.00 |
| 12 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $5,000.00 | $2,000.00 | $3,000.00 | $2,500.00 | $4,000.00 |
| 13 | Traf cont & prot SPL (X7010216) | LS | 1 | $40,000 | $49,000 | $35,000 | $325,000 | $50,000 |
| 14 | Temp info signing (X7200061) | SF | 105.60 | $25.00 | $26.00 | $25.00 | $25.00 | $30.00 |
| 15 | Accessible ped signal (X8760200) | EACH | 22 | $2,300.00 | $1,900.00 | $1,848.00 | $1,848.10 | $2,100.00 |
| 16 | Conc FDN TY A 12D (X8780012) | LF | 40 | $431.93 | $375.00 | $328.00 | $327.90 | $420.00 |
| 17 | Drainage STR cleaned (Z0018500) | EACH | 30 | $484.00 | $400.00 | $400.00 | $365.00 | $500.00 |
| 18 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 3 | $786.50 | $750.00 | $630.00 | $630.00 | $800.00 |
| 19 | Tree remov 6-15 (20100110) | UNIT | 26 | $33.00 | $31.00 | $42.00 | $30.00 | $33.00 |
| 20 | Tree remov over 15 (20100210) | UNIT | 63 | $44.00 | $42.00 | $63.00 | $40.00 | $44.00 |
| 21 | Tree prun 1-10 (20101300) | EACH | 1 | $220.00 | $210.00 | $250.00 | $200.00 | $225.00 |
| 22 | Tree prun over 10 (20101350) | EACH | 3 | $275.00 | $265.00 | $400.00 | $250.00 | $270.00 |
| 23 | Earth excavation (20200100) | CY | 138 | $60.00 | $80.00 | $75.00 | $140.00 | $80.00 |
| 24 | Topsoil F & P 4 (21101615) | SY | 325 | $5.50 | $2.00 | $15.00 | $5.00 | $15.00 |
| 25 | Sodding (25200100) | SY | 325 | $27.50 | $30.00 | $28.00 | $55.00 | $25.00 |
| 26 | Bit matls tack CT (40600290) | LB | 1,125 | $0.01 | $0.01 | $0.01 | $0.01 | $6.00 |
| 27 | Protective coat (42001300) | SY | 1,880 | $1.00 | $1.00 | $3.00 | $0.01 | $2.00 |
| 28 | PCC driveway pavt 6 (42300200) | SY | 40 | $100.00 | $165.00 | $111.00 | $135.00 | $100.00 |
| 29 | PC conc sidewalk 5 (42400200) | SF | 12,068 | $10.00 | $10.00 | $10.00 | $12.00 | $12.00 |
| 30 | PC conc sidewalk 8 (42400410) | SF | 293 | $12.00 | $20.00 | $16.00 | $20.00 | $12.00 |
| 31 | Detectable warnings (42400800) | SF | 1,344 | $35.00 | $25.00 | $31.00 | $19.00 | $45.00 |
| 32 | Pavement rem (44000100) | SY | 266 | $25.00 | $17.50 | $14.00 | $42.00 | $40.00 |
| 33 | Drive pavement rem (44000200) | SY | 40 | $15.00 | $45.00 | $45.00 | $30.00 | $30.00 |
| 34 | Sidewalk rem (44000600) | SF | 12,367 | $2.50 | $3.00 | $3.00 | $2.40 | $3.00 |
| 35 | Median removal (44003100) | SF | 227 | $10.00 | $15.00 | $17.00 | $3.00 | $10.00 |
| 36 | CL B patch T2 10 (44200970) | SY | 1,055 | $190.00 | $220.00 | $175.00 | $185.00 | $175.00 |
| 37 | Dowel bars 1 1/2 (44201299) | EACH | 820 | $20.00 | $18.50 | $27.00 | $21.00 | $25.00 |
| 38 | CL D patch T2 3 (44201682) | SY | 70 | $40.00 | $80.00 | $63.00 | $70.00 | $100.00 |
| 39 | CL D patch T3 3 (44201683) | SY | 110 | $40.00 | $80.00 | $63.00 | $55.00 | $90.00 |
| 40 | Saw cuts (44213200) | LF | 3,560 | $5.00 | $10.00 | $3.00 | $0.01 | $5.00 |
| 41 | JT CR RT PCC pav/SHLD (45200100) | LF | 46,740 | $0.11 | $0.12 | $2.20 | $0.10 | $2.40 |
| 42 | JT or crack filling (45200300) | LB | 13,354 | $3.08 | $3.00 | $3.24 | $2.80 | $3.50 |
| 43 | CB adjust (60250200) | EACH | 10 | $1,000.00 | $400.00 | $624.00 | $425.00 | $1,000.00 |
| 44 | CB reconst (60252800) | EACH | 3 | $1,500.00 | $1,750.00 | $1,873.00 | $850.00 | $2,500.00 |
| 45 | Man adjust (60255500) | EACH | 21 | $900.00 | $400.00 | $624.00 | $550.00 | $1,000.00 |
| 46 | Man reconst (60257900) | EACH | 3 | $2,500.00 | $1,750.00 | $1,873.00 | $1,000.00 | $2,500.00 |
| 47 | Conc median surf 4 (60618300) | SF | 227 | $19.00 | $10.00 | $12.00 | $11.50 | $15.00 |
| 48 | Guardrail remov (63200310) | LF | 10 | $100.00 | $50.00 | $56.00 | $100.00 | $50.00 |
| 49 | Non SPL waste disposl (66900200) | CY | 138 | $80.00 | $55.00 | $0.01 | $100.00 | $150.00 |
| 50 | Soil disposal analy (66900530) | EACH | 5 | $1,650.00 | $1,450.00 | $845.00 | $1,450.00 | $1,600.00 |
| 51 | Reg sub P-const plan (66901001) | LS | 1 | $2,250.00 | $3,100.00 | $6,900.00 | $3,100.00 | $5,000.00 |
| 52 | Reg sub F con report (66901003) | LS | 1 | $2,250.00 | $1,200.00 | $500.00 | $1,200.00 | $1,000.00 |
| 53 | Reg sub mon (66901006) | CAL DAY | 5 | $1,000.00 | $680.00 | $740.00 | $680.00 | $1,100.00 |
| 54 | Mobilization (67100100) | LS | 1 | $80,000 | $85,932 | $90,000 | $92,000 | $113,000 |
| 55 | Changeable message SN (70107025) | CAL DAY | 30 | $100.00 | $90.00 | $90.00 | $90.00 | $100.00 |
| 56 | Temp PVT MK L4 T4 tape (70307120) | LF | 19,742 | $1.25 | $1.30 | $1.30 | $1.30 | $1.40 |
| 57 | Temp PVT MK L6 T4 tape (70307130) | LF | 1,175 | $1.50 | $2.00 | $2.00 | $2.00 | $2.10 |
| 58 | Temp PVT MK L12 T4 tape (70307160) | LF | 5,015 | $4.00 | $4.00 | $4.00 | $0.01 | $4.20 |
| 59 | Temp PVT MK L24 T4 tape (70307210) | LF | 248 | $8.00 | $8.00 | $8.00 | $8.00 | $9.00 |
| 60 | Paint PVT MK line 8 (78001140) | LF | 280 | $3.96 | $3.60 | $3.60 | $3.60 | $3.80 |
| 61 | Pref PL PM TD STD L 7 (78004635) | LF | 280 | $13.75 | $12.50 | $12.50 | $12.50 | $14.00 |
| 62 | Mod ureth PM LTR-sym (78009000) | SF | 1,595 | $4.40 | $4.00 | $4.00 | $4.00 | $4.30 |
| 63 | Mod ureth PM line 4 (78009004) | LF | 19,742 | $0.72 | $0.65 | $0.65 | $0.65 | $0.70 |
| 64 | Mod ureth PM line 6 (78009006) | LF | 1,175 | $1.10 | $1.00 | $1.00 | $1.00 | $1.10 |
| 65 | Mod ureth PM line 8 (78009008) | LF | 299 | $1.65 | $1.50 | $1.50 | $1.50 | $1.60 |
| 66 | Mod ureth PM line 12 (78009012) | LF | 5,015 | $2.20 | $2.00 | $2.00 | $2.00 | $2.20 |
| 67 | Mod ureth PM line 24 (78009024) | LF | 248 | $4.40 | $4.00 | $4.00 | $4.00 | $5.00 |
| 68 | Raised refl pavt MKR (78100100) | EACH | 450 | $46.75 | $42.00 | $42.50 | $50.00 | $50.00 |
| 69 | Raised ref PVT MK rem (78300200) | EACH | 450 | $10.00 | $15.00 | $10.00 | $0.01 | $55.00 |
| 70 | PVT MKG rem WTR blast (78300202) | SF | 4,000 | $4.00 | $2.50 | $2.50 | $2.50 | $2.55 |
| 71 | Undrgrd C galvs 2 (81028200) | LF | 196 | $87.34 | $72.00 | $135.42 | $135.42 | $75.00 |
| 72 | Main EX TR sig instal (85000200) | EACH | 3 | $5,783.03 | $4,850.00 | $525.00 | $525.00 | $5,000.00 |
| 73 | Elcbl C signal 14 2C (87301215) | LF | 2,401 | $6.59 | $5.40 | $9.83 | $9.83 | $5.50 |
| 74 | Elcbl C signal 14 3C (87301225) | LF | 198 | $3.81 | $3.20 | $11.46 | $11.46 | $3.25 |
| 75 | Elcbl C egrdc 6 1C (87301900) | LF | 1,294 | $8.68 | $7.30 | $9.53 | $9.53 | $7.50 |
| 76 | Drill EX handhole (87900200) | EACH | 10 | $1,232.73 | $1,000.00 | $556.75 | $556.75 | $1,100.00 |
| 77 | Ped SH LED 1F BM CDT (88102717) | EACH | 2 | $1,067.95 | $900.00 | $943.55 | $943.55 | $1,000.00 |
| 78 | Det loop T1 (88600100) | LF | 770 | $36.60 | $30.25 | $36.75 | $36.75 | $32.00 |
| 79 | Mod EX contr (89502200) | EACH | 1 | $1,259.86 | $1,100.00 | $525.00 | $525.00 | $1,200.00 |
| 80 | Rem elcbl FR con (89502300) | LF | 1,709 | $0.30 | $0.25 | $2.93 | $2.93 | $0.30 |
| 81 | Remov EX TS equip (89502375) | EACH | 2 | $463.10 | $400.00 | $1,492.63 | $1,492.63 | $400.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.