IDOT contract 80C49 bid tabulation

Section 2025-2106-RS. Let by Illinois DOT on April 24, 2026, Cook, District 01. 5 bids received; low bid $4,164,775 by K-Five Construction Corporation.

Owner
Illinois DOT
Letting
24 APR 2026
Pay items
122
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1K-Five Construction Corporation$4,164,775Low
2Gallagher Asphalt Corporation$4,239,696+2.0%
3P. T. Ferro Construction Co.$4,531,713+9.0%
4Builders Paving, LLC$4,573,898+10%
5Austin Tyler Construction, Inc.$5,419,276+30%
IDOT contract 80C49: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. K-Five Construction Corporation2. Gallagher Asphalt Corporation3. P. T. Ferro Construction Co.4. Builders Paving, LLC5. Austin Tyler Construction, Inc.
1Tree care (K0026700)EACH23$100.00$1,300.00$100.00$1,200.00$177.37
2Weed control teasel (K0029624)GAL0.50$900.00$955.37$900.00$380.00$4,434.17
3Mulch placement 4 (K0036120)SY250$4.00$4.25$4.00$12.00$11.09
4Constructn layout SPL (X0320050)LS1$2,500.00$1,300.00$20,000$9,500.00$11,085
5Weed cont basal TRTMT (X0325222)GAL12$900.00$955.37$900.00$460.00$1,457.73
6Weed CTRL NTV LSCP EN (X0327120)ACRE5.90$900.00$955.37$900.00$1,500.00$2,294.68
7Ped signal post 10 FT (X1400367)EACH1$1,316.21$1,397.19$1,316.21$1,400.00$1,459.07
8Tree remov acres SPL (X2010350)ACRE5.36$6,000.00$6,500.00$6,000.00$6,500.00$21,949
9Selective clearing (X2010516)UNIT19.70$350.00$360.00$350.00$370.00$543.19
10Grading & shap SHLDRS (X2020110)UNIT120$136.00$340.00$0.01$135.00$176.24
11Prun safety/equip CLR (X2100002)UNIT4$500.00$540.00$500.00$550.00$1,607.39
12Temporary ramp SPL (X4060995)SY560$0.01$30.00$0.01$38.00$16.63
13CC&G RMVL repl < = 10 (X4400501)LF100$75.00$85.00$90.00$83.00$92.71
14CC&G RMVL repl > 10FT (X4400503)LF435$65.00$58.00$70.00$74.00$58.71
15SS cleaned 12 (X5537800)LF375$1.00$1.00$1.00$4.00$11.09
16FR & lids adjust SPL (X6030310)EACH5$2,000.00$830.00$1,500.00$2,700.00$1,676.59
17Vert adj of guardrail (X6330900)LF125$18.00$19.00$18.00$20.00$19.95
18Engrs FLD ofc TY A D1 (X6700407)CAL MO12$3,500.00$500.00$2,500.00$4,000.00$3,325.63
19Temp info signing (X7200061)SF104$28.85$26.00$25.00$27.00$19.95
20Accessible ped signal (X8760200)EACH2$3,954.65$4,000.00$3,954.65$4,200.00$4,383.89
21Conc FDN TY A 12D (X8780012)LF4$405.16$430.00$405.16$420.00$449.14
22Det loop repl (X8860105)LF35$27.44$29.00$27.44$30.00$30.42
23Construction layout (Z0013798)LS1$20,700$8,000.00$50,000$20,000$11,085
24Drainage STR cleaned (Z0018500)EACH25$350.00$370.00$350.00$350.00$415.70
25RE-optimize TR sig sys 1 (Z0033044)EACH4$792.00$800.00$792.00$800.00$877.97
26Trainees (Z0076600)HR500$0.80$0.80$0.80$0.80$0.80
27Trainees TPG (Z0076604)HR500$15.00$15.00$15.00$15.00$15.00
28Tree remov 6-15 (20100110)UNIT161$20.00$21.00$20.00$21.00$46.56
29Tree remov over 15 (20100210)UNIT69$25.00$27.00$25.00$26.00$69.84
30Tree prun over 10 (20101350)EACH5$150.00$160.00$150.00$170.00$399.08
31Earth excavation (20200100)CY4,325$50.00$120.00$52.00$89.00$52.88
32Rem & disp uns matl (20201200)CY255$76.93$50.00$62.00$50.00$51.92
33Geotech fab F/GR stab (21001000)SY775$3.25$1.00$3.50$3.00$5.54
34Topsoil F & P 4 (21101615)SY290$6.00$6.00$6.00$4.00$13.86
35Grading & shap ditch (21400100)LF250$31.16$5.40$35.00$18.00$45.34
36Seeding CL 2A (25000210)ACRE0.25$3,800.00$4,000.00$3,800.00$2,800.00$4,877.58
37Interseed CL 1B (25003115)ACRE0.50$3,000.00$3,100.00$3,000.00$2,600.00$4,301.14
38Interseed CL 4A (25003312)ACRE5.90$3,500.00$3,700.00$3,500.00$1,000.00$3,458.65
39Erosion contr blanket (25100630)SY150$5.00$5.30$5.00$11.00$2.44
40Sodding salt tolerant (25200110)SY290$11.00$11.60$11.00$25.00$32.15
41Perimeter eros bar (28000400)LF450$3.00$3.10$3.00$5.50$4.99
42Agg subgrade improve (30300001)CY255$69.65$50.00$100.00$40.00$68.55
43Agg subgrade impr 12 (30300112)SY7,710$35.36$26.00$23.00$34.00$40.18
44Bit matls PR CT (40600275)LB17,350$0.01$0.01$0.01$0.01$0.39
45Bit matls tack CT (40600290)LB42,700$0.01$1.10$0.01$0.01$0.39
46Long joint sealant (40600370)LF30,550$3.00$3.50$3.40$3.70$3.90
47Mix CR JTS flangewys (40600400)TON95$50.00$200.00$100.00$830.00$341.40
48HMA surf rem butt JT (40600982)SY405$0.01$31.00$0.01$18.00$23.30
49HMA BC IL-9.5 N70 (40602985)TON6,620$82.00$100.00$97.00$83.00$91.08
50HMA SC IL-9.5 D N70 (40604062)TON6,200$82.00$105.00$98.00$84.00$92.15
51Protective coat (42001300)SY260$3.00$0.01$0.01$5.00$5.54
52PC conc sidewalk 5 (42400200)SF905$15.00$8.00$14.00$17.00$13.24
53Detectable warnings (42400800)SF100$55.00$30.00$25.00$55.00$44.34
54HMA surf rem 1 3/4 (44000156)SY4,170$2.40$4.50$3.00$7.00$4.09
55HMA surf rem 3 3/4 (44000164)SY59,090$5.00$5.00$5.50$8.40$5.50
56Sidewalk rem (44000600)SF700$5.00$3.90$4.00$3.00$2.75
57CL D patch T2 14 (44201815)SY100$45.00$200.00$175.00$46.00$187.42
58CL D patch T3 14 (44201819)SY235$45.00$155.00$155.00$46.00$182.03
59CL D patch T4 14 (44201821)SY1,000$45.00$130.00$100.00$46.00$174.08
60CL D patch T2 17 (44201851)SY100$55.00$225.00$215.00$55.00$227.14
61CL D patch T3 17 (44201855)SY150$55.00$165.00$190.00$55.00$221.39
62CL D patch T4 17 (44201857)SY200$55.00$140.00$155.00$55.00$216.36
63JT CR RT PCC pav/SHLD (45200100)LF5,975$0.15$0.15$0.15$0.25$2.44
64JT or crack filling (45200300)LB1,710$6.92$7.00$6.92$7.00$3.59
65Aggregate SHLDS B (48101200)TON785$50.00$50.00$39.00$50.00$47.84
66HMA shoulders 8 (48203029)SY7,710$40.00$44.00$46.00$43.00$42.30
67Man adjust (60255500)EACH3$1,200.00$340.00$650.00$700.00$438.55
68FR & grates adjust (60300105)EACH7$1,200.00$360.00$500.00$700.00$438.55
69SPBGR TY A 6FT posts (63000001)LF1,525$33.00$35.00$33.00$34.00$36.58
70TR bar TRM T1 SPL tan (63100167)EACH19$3,720.00$3,900.00$3,720.00$4,000.00$4,123.78
71Guardrail remov (63200310)LF2,475$6.00$6.30$6.00$7.00$6.65
72Rem RE-E SPBGR TY A (63301210)LF125$24.00$25.00$24.00$25.00$26.61
73Non SPL waste disposl (66900200)CY4,325$90.70$0.01$83.00$93.00$122.88
74Soil disposal analy (66900530)EACH10$1,450.00$1,500.00$1,450.00$945.00$1,047.57
75Reg sub P-const plan (66901001)LS1$3,100.00$3,200.00$3,100.00$6,900.00$7,648.94
76Reg sub F con report (66901003)LS1$1,200.00$1,200.00$1,200.00$500.00$554.27
77Reg sub mon (66901006)CAL DAY30$680.00$720.00$680.00$715.00$792.61
78Mobilization (67100100)LS1$249,000$190,000$265,000$270,000$290,000
79Traf cont-prot 701201 (70100450)LS1$2,800.00$2,000.00$2,000.00$2,500.00$1.11
80Traf cont-prot 701306 (70100460)LS1$100.00$100.00$300,000$228.65$1.11
81Traf cont-prot 701326 (70100500)LS1$100.00$100.00$100.00$200.00$1.11
82TR cont & prot 701501 (70102620)LS1$270,625$9,000.00$9,000.00$55,000$22,171
83TR cont & prot 701502 (70102622)LS1$100.00$100.00$100.00$200.00$1.11
84TR cont & prot 701701 (70102635)LS1$2,000.00$2,000.00$2,000.00$2,500.00$1.11
85TR cont & prot 701801 (70102640)LS1$2,000.00$2,000.00$2,000.00$2,500.00$16,628
86TR cont surveillance (70103815)CAL DAY10$250.00$260.00$250.00$250.00$166.28
87Short term pavt mking (70300100)LF261,680$0.01$0.01$0.01$0.01$1.11
88SHRT TRM pavt MK rem (70300150)SF21,810$0.01$0.01$0.01$0.01$1.11
89Temp PVT MK LTR & sym paint (70300211)SF2,850$0.01$0.01$0.01$0.01$1.83
90Temp PVT MK line 4 - paint (70300221)LF196,260$0.01$0.01$0.01$0.01$0.31
91Temp PVT MK line 6 - paint (70300241)LF18,240$0.01$0.01$0.01$0.01$0.45
92Temp PVT MK line 8 - paint (70300251)LF2,835$0.01$0.01$0.01$0.01$0.61
93Temp PVT MK line 12 - paint (70300261)LF9,150$0.01$0.01$0.01$0.01$0.91
94Temp PVT MK line 24 - paint (70300281)LF1,665$0.01$0.01$0.01$0.01$1.83
95Temp PVT MK L4 T4 tape (70307120)LF65,420$0.01$0.01$0.01$0.01$2.22
96Terminal marker - DA (72501000)EACH19$50.00$70.00$50.00$60.00$55.43
97THPL PVT MK LTR & sym (78000100)SF950$5.00$5.30$5.00$5.00$5.82
98THPL PVT MK line 4 (78000200)LF65,420$0.55$0.60$0.55$0.55$0.78
99THPL PVT MK line 6 (78000400)LF6,080$1.00$1.05$1.00$1.00$1.33
100THPL PVT MK line 8 (78000500)LF945$1.50$1.55$1.50$1.50$1.61
101THPL PVT MK line 12 (78000600)LF3,050$2.50$2.60$2.50$2.50$2.49
102THPL PVT MK line 24 (78000650)LF555$5.00$5.30$5.00$5.00$5.82
103Mod ureth PM LTR-sym (78009000)SF185$8.00$8.40$8.00$8.00$6.65
104Mod ureth PM line 4 (78009004)LF3,700$0.72$0.75$0.72$0.72$1.00
105Mod ureth PM line 6 (78009006)LF1,125$1.20$1.25$1.20$1.20$1.61
106Mod ureth PM line 12 (78009012)LF495$4.00$4.20$4.00$4.00$3.05
107Mod ureth PM line 24 (78009024)LF85$8.00$8.40$8.00$8.00$6.65
108Raised refl pavt MKR (78100100)EACH950$40.00$42.00$40.00$40.00$46.28
109Grdrail ref type A (78200005)EACH40$15.00$15.50$15.00$17.00$16.63
110Raised ref PVT MK rem (78300200)EACH950$15.00$0.01$0.01$22.00$16.63
111Undrgrd C galvs 2 (81028200)LF568$49.27$52.00$49.27$50.00$54.62
112HD handhole (81400200)EACH9$5,734.19$6,000.00$5,734.19$5,800.00$6,356.59
113Main EX TR sig instal (85000200)EACH4$3,926.63$4,100.00$3,926.63$4,000.00$4,352.83
114Elcbl C signal 14 2C (87301215)LF205$8.86$9.00$8.86$9.00$9.82
115Elcbl C signal 14 3C (87301225)LF70$9.07$9.20$9.07$9.50$10.05
116Elcbl C lead 14 1PR (87301305)LF1,469$9.05$9.20$9.05$9.50$10.03
117Elcbl C egrdc 6 1C (87301900)LF55$9.71$10.00$9.71$10.00$10.76
118Drill EX handhole (87900200)EACH10$425.32$450.00$425.32$450.00$471.48
119Det loop T1 (88600100)LF2,857$27.44$29.00$27.44$30.00$30.42
120Rem elcbl FR con (89502300)LF1,720$0.14$0.15$0.14$0.50$0.16
121Remov EX TS equip (89502375)EACH4$138.01$145.00$138.01$160.00$152.99
122Remov EX handhole (89502380)EACH9$1,299.98$1,350.00$1,299.98$1,400.00$1,441.08
IDOT contract 80C49: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy