IDOT contract 80B34 bid tabulation

Section 2025-2004-RS. Let by Illinois DOT on January 16, 2026, Will, District 01. 6 bids received; low bid $977,777 by Gallagher Asphalt Corporation.

Owner
Illinois DOT
Letting
16 JAN 2026
Pay items
84
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Gallagher Asphalt Corporation$977,777Low
2D. Construction, Inc.$999,189+2.0%
3P. T. Ferro Construction Co.$1,069,082+9.0%
4Builders Paving, LLC$1,083,067+11%
5Austin Tyler Construction, Inc.$1,087,776+11%
6K-Five Construction Corporation$1,234,982+26%
IDOT contract 80B34: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Gallagher Asphalt Corporation2. D. Construction, Inc.3. P. T. Ferro Construction Co.4. Builders Paving, LLC5. Austin Tyler Construction, Inc.6. K-Five Construction Corporation
1Constructn layout SPL (X0320050)LS1$6,218.00$7,500.00$25,000$6,000.00$3,750.00$2,428.89
2Ped signal post 10 FT (X1400367)EACH1$1,300.00$1,428.88$1,298.98$1,300.00$1,300.00$1,397.07
3CC&G RMVL repl < = 10 (X4400501)LF8$106.25$100.00$200.00$145.00$1,160.00$155.17
4CC&G RMVL repl > 10FT (X4400503)LF2,565$43.50$45.00$70.00$66.00$58.00$68.17
5FR & lids adjust SPL (X6030310)EACH1$1,400.00$1,000.00$2,000.00$2,550.00$1,500.00$2,500.00
6Engrs FLD ofc TY A D1 (X6700407)CAL MO6$500.00$5,000.00$2,000.00$3,100.00$3,000.00$3,000.00
7Temp info signing (X7200061)SF115$13.00$30.00$15.00$12.50$35.00$16.13
8Accessible ped signal (X8760200)EACH2$4,000.00$4,358.54$3,962.31$4,000.00$3,965.00$4,261.50
9Conc FDN TY A 12D (X8780012)LF4$475.00$506.64$460.58$465.00$465.00$495.36
10Det loop repl (X8860105)LF2,197$21.60$23.19$21.08$21.10$22.00$22.00
11Drainage STR cleaned (Z0018500)EACH2$625.00$1,650.00$1,875.00$1,875.00$500.00$1,075.51
12RE-optimize TR sig sys 1 (Z0033044)EACH1$900.00$950.40$864.00$870.00$865.00$864.00
13Earth excavation (20200100)CY150$92.00$60.00$60.00$75.00$55.00$129.76
14Geotech fab F/GR stab (21001000)SY221$2.75$5.00$3.50$3.10$9.00$2.00
15Topsoil F & P 4 (21101615)SY67$8.50$55.00$30.00$30.00$5.00$8.60
16Sodding salt tolerant (25200110)SY67$33.00$55.00$45.00$86.00$120.00$34.42
17Supple watering (25200200)UNIT0.67$200.00$270.60$1,000.00$60.00$500.00$215.10
18Agg subgrade improve (30300001)CY19$130.00$100.00$100.00$58.00$120.00$60.00
19Agg subgrade impr 12 (30300112)SY221$40.00$25.00$26.00$46.00$43.00$59.30
20Bit matls tack CT (40600290)LB15,124$0.01$0.01$0.01$0.01$0.01$0.01
21Long joint sealant (40600370)LF8,642$3.20$3.18$3.50$3.00$3.10$3.12
22Mix CR JTS flangewys (40600400)TON34$50.00$0.01$0.01$650.00$300.00$400.00
23HMA surf rem butt JT (40600982)SY149$0.01$0.01$0.01$20.00$20.00$44.93
24P HMA BC IL-4.75 N50 (40603200)TON919$110.00$102.00$105.00$95.00$96.50$129.73
25HMA SC IL-9.5 D N50 (40604060)TON47$169.00$105.00$175.00$250.00$200.00$179.71
26P HMA SC SMA 9.5 F N80 (40605026)TON2,183$121.00$115.00$120.00$123.00$115.00$133.84
27Protective coat (42001300)SY788$1.00$1.00$0.01$0.10$1.00$0.01
28PC conc sidewalk 5 (42400200)SF1,464$9.50$9.00$13.00$12.10$12.20$14.95
29PC conc sidewalk 7 (42400400)SF528$13.00$12.00$17.00$13.10$15.00$16.19
30Detectable warnings (42400800)SF175$21.00$40.00$20.00$45.00$43.00$43.30
31Pavement rem (44000100)SY202$30.00$20.00$25.00$27.00$68.00$33.00
32HMA surf rem 2 (44000157)SY411$9.00$3.00$11.00$13.00$18.00$4.89
33HMA surf rem 2 1/2 (44000159)SY22,269$3.00$2.30$3.00$4.30$2.05$4.91
34Sidewalk rem (44000600)SF1,464$4.00$3.00$2.50$4.10$3.55$3.49
35CL D patch T2 10 (44201765)SY10$197.00$170.00$150.00$200.00$140.00$130.00
36CL D patch T3 10 (44201769)SY17$150.00$170.00$125.00$140.00$135.00$130.00
37CL D patch T4 10 (44201771)SY216$80.00$112.00$90.00$95.00$125.00$128.00
38HMA shoulders 8 (48203029)SY247$75.00$47.00$60.00$67.00$57.00$94.12
39FR & lids adjust (60300305)EACH4$575.00$900.00$500.00$820.00$400.00$1,043.42
40Pipe culv cleaned 12 (60920012)LF90$31.00$13.20$12.00$12.00$50.00$26.89
41Non SPL waste disposl (66900200)CY145$65.00$90.00$85.00$95.00$200.00$85.00
42Soil disposal analy (66900530)EACH2$1,500.00$1,522.50$1,450.00$965.00$965.00$1,435.40
43Reg sub P-const plan (66901001)LS1$3,200.00$3,255.00$3,100.00$5,000.00$5,000.00$3,422.87
44Reg sub F con report (66901003)LS1$1,250.00$1,260.00$1,200.00$500.00$500.00$1,324.98
45Reg sub mon (66901006)CAL DAY4$700.00$714.00$680.00$715.00$715.00$750.82
46Mobilization (67100100)LS1$58,000$39,000$60,000$35,000$55,000$71,250
47Traf cont-prot 701306 (70100460)LS1$1.00$0.01$1,025.00$1.00$1.00$1,217.14
48Traf cont-prot 701336 (70100600)LS1$750.00$0.01$1,025.00$700.00$1.00$1,217.14
49TR cont & prot 701501 (70102620)LS1$12,000$0.01$1,025.00$900.00$1.00$1,217.14
50TR cont & prot 701502 (70102622)LS1$2,000.00$0.01$1,025.00$2,400.00$1.00$1,217.14
51TR cont & prot 701606 (70102625)LS1$4,000.00$57,725$1,025.00$1.00$8,500.00$1,217.14
52TR cont & prot 701611 (70102634)LS1$2,000.00$0.01$1,025.00$3,900.00$1.00$1,217.14
53TR cont & prot 701701 (70102635)LS1$1.00$0.01$1,025.00$1.00$1.00$1,217.14
54TR cont & prot 701801 (70102640)LS1$900.00$0.01$1,025.00$900.00$320.00$1,217.14
55Short term pavt mking (70300100)LF17,342$0.01$0.01$0.01$0.01$1.50$1.50
56SHRT TRM pavt MK rem (70300150)SF1,446$0.01$0.01$0.01$0.01$2.50$1.00
57Temp PVT MK LTR & sym paint (70300211)SF1,000$0.01$0.01$1.75$0.01$2.00$0.01
58Temp PVT MK line 4 - paint (70300221)LF20,249$0.01$0.01$0.35$0.01$0.35$0.01
59Temp PVT MK line 6 - paint (70300241)LF4,292$0.01$0.01$0.53$0.01$0.33$0.01
60Temp PVT MK line 8 - paint (70300251)LF512$0.01$0.01$0.70$0.01$0.33$0.01
61Temp PVT MK line 12 - paint (70300261)LF2,692$0.01$0.01$1.06$0.01$1.00$0.01
62Temp PVT MK line 24 - paint (70300281)LF598$0.01$0.01$1.60$0.01$2.00$0.01
63Temp PVT MK L4 T4 tape (70307120)LF4,335$0.01$0.01$0.01$1.00$2.60$0.01
64THPL PVT MK LTR & sym (78000100)SF500$6.00$6.33$5.75$5.75$5.75$5.75
65THPL PVT MK line 4 (78000200)LF10,125$0.75$0.83$0.75$0.75$0.75$0.75
66THPL PVT MK line 6 (78000400)LF2,146$0.90$0.94$0.85$0.85$0.85$0.85
67THPL PVT MK line 8 (78000500)LF256$2.00$2.15$1.95$1.95$1.95$1.95
68THPL PVT MK line 12 (78000600)LF1,346$3.00$3.08$2.80$2.80$2.80$2.80
69THPL PVT MK line 24 (78000650)LF299$6.00$6.33$5.75$5.75$5.75$5.75
70Raised refl pavt MKR (78100100)EACH135$59.00$60.50$65.00$55.00$45.00$55.00
71Raised ref PVT MK rem (78300200)EACH135$0.01$10.00$0.01$19.00$10.00$10.00
72Undrgrd C galvs 2 (81028200)LF279$48.00$51.66$46.96$47.00$47.00$50.51
73HD handhole (81400200)EACH5$5,700.00$6,200.16$5,636.51$5,700.00$5,650.00$6,062.12
74Main EX TR sig instal (85000200)EACH2$1,950.00$2,022.49$1,838.63$1,900.00$1,840.00$1,977.46
75Elcbl C signal 14 2C (87301215)LF452$4.50$4.75$4.32$4.35$4.35$4.65
76Elcbl C signal 14 3C (87301225)LF460$4.60$4.95$4.50$4.50$4.50$4.84
77Elcbl C lead 14 1PR (87301305)LF848$4.60$4.95$4.50$4.50$4.80$4.84
78Elcbl C egrdc 6 1C (87301900)LF35$5.40$5.53$5.03$5.10$5.05$5.41
79Drill EX handhole (87900200)EACH6$450.00$485.06$440.96$450.00$440.00$474.26
80Ped SH LED 1F BM CDT (88102717)EACH2$670.00$686.38$623.98$625.00$625.00$671.10
81Det loop T1 (88600100)LF590$21.50$23.19$21.08$21.20$21.20$22.67
82Mod EX contr (89502200)EACH1$1,250.00$1,299.16$1,181.05$1,250.00$1,200.00$1,270.23
83Rebuild EX handhole (89502376)EACH1$2,600.00$2,733.90$2,485.36$2,500.00$2,500.00$2,673.03
84Remov EX handhole (89502380)EACH5$1,350.00$1,433.09$1,302.81$1,320.00$1,305.00$1,401.18
IDOT contract 80B34: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy