Curnyn Construction Co.: IDOT bid record
Curnyn Construction Co. submitted 11 bids on Illinois DOT contracts in the data, from 05 MAR 2021 to 27 FEB 2026, and was the low bidder on 8 of them (73%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $5,273,566
- Latest bid
- 27 FEB 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 3 | 2 | 67% |
| 2022 | 2 | 2 | 100% |
| 2023 | 1 | 0 | 0% |
| 2024 | 3 | 3 | 100% |
| 2025 | 1 | 1 | 100% |
| 2026 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 03 | 5 | 4 | 80% |
| District 04 | 3 | 2 | 67% |
| District 02 | 3 | 2 | 67% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Name plates | 51500100 | EACH | 10 | 9 (90%) | $470.00 | $773.24 |
| Channel excavation | 20300100 | CY | 10 | 9 (90%) | $17.50 | $35.00 |
| Perimeter eros bar | 28000400 | LF | 10 | 8 (80%) | $3.50 | $3.50 |
| Rem exist struct | 50100100 | EACH | 10 | 8 (80%) | $20,500 | $50,000 |
| Conc struct | 50300225 | CY | 10 | 7 (70%) | $947.50 | $1,260.00 |
| Structure excavation | 50200100 | CY | 8 | 6 (75%) | $26.50 | $46.00 |
| Seeding CL 2 SPL | X2501000 | ACRE | 7 | 6 (86%) | $4,800.00 | $9,000.00 |
| Temp eros contr seed | 28000250 | LB | 6 | 6 (100%) | $1.00 | $5.00 |
| Concrete encasement | 50300280 | CY | 8 | 4 (50%) | $1,200.00 | $1,200.00 |
| Pipe culvert remov | 50105220 | LF | 5 | 4 (80%) | $6.00 | $23.50 |
| Reinf bars, epoxy CTD | 50800205 | LB | 6 | 3 (50%) | $2.85 | $2.50 |
| Driving piles | 51202305 | LF | 10 | 2 (20%) | $1.00 | $0.10 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Brandt Construction Co. | 6 | 0 of 6 |
| Civil Constructors, Inc. d/b/a/ Helm Civil | 5 | 1 of 5 |
| D. Construction, Inc. | 4 | 1 of 4 |
| Sjostrom & Sons, Inc. | 4 | 0 of 4 |
| Stark Excavating, Inc. | 3 | 2 of 3 |
| Martin & Company Excavating | 2 | 1 of 2 |
| Gensini Excavating, Inc. | 2 | 1 of 2 |
| Laverdiere Construction, Inc. | 1 | 0 of 1 |
| Miller Trucking & Excavating Company | 1 | 0 of 1 |
| Gillan Construction LLC | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 27 FEB 2026 | 68K57 | District 04 | Section (124BR)SCR | 6 of 6 | $56,980 | +161% |
| 07 MAR 2025 | 87738 | District 03 | Project Number: L3V3-662 / /, section 16-14122-00-BR | 1 of 3 | $429,897 | Low, 3.0% under the second |
| 14 JUN 2024 | 87816 | District 03 | Project Number: 1Db6-656 / /, section 17-19135-00-BR | 1 of 5 | $539,871 | Low, 8.0% under the second |
| 26 APR 2024 | 87815 | District 03 | Project Number: 7Vph-466 / /, section 07-12125-00-BR | 1 of 5 | $499,288 | Low, 14% under the second |
| 08 MAR 2024 | 85753 | District 02 | Project Number: Kuxb-253 / /, section 22-00168-00-BR | 1 of 4 | $718,769 | Low, 13% under the second |
| 16 JUN 2023 | 85745 | District 02 | Project Number: 3M66-595 / /, section 20-15134-00-BR | 3 of 4 | $337,945 | +9.0% |
| 17 JUN 2022 | 85722 | District 02 | Project Number: Fiuz-640 / /, section 20-06122-00-BR | 1 of 4 | $342,370 | Low, 1.0% under the second |
| 17 JUN 2022 | 89813 | District 04 | Project Number: Egvz-677 / /, section 19-00102-00-BR | 1 of 2 | $1,262,966 | Low, 6.0% under the second |
| 11 JUN 2021 | 87762 | District 03 | Project Number: 92An-359 / /, section 17-14123-00-BR | 1 of 2 | $311,681 | Low, 31% under the second |
| 23 APR 2021 | 87764 | District 03 | Project Number: S43W-369 / /, section 12-00241-00-BR | 3 of 5 | $379,948 | +12% |
| 05 MAR 2021 | 89475 | District 04 | Project Number: Y4C7-237 / /, section 07-00081-08-BR | 1 of 2 | $1,168,725 | Low, 2.0% under the second |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.