Stenstrom Excavation & Blacktop, Inc.: IDOT bid record
Stenstrom Excavation & Blacktop, Inc. submitted 27 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 12 JUN 2026, and was the low bidder on 5 of them (19%). When it was not low, its total sat a median +21% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $4,423,702
- Latest bid
- 12 JUN 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 12 | 2 | 17% |
| 2022 | 7 | 1 | 14% |
| 2023 | 2 | 0 | 0% |
| 2025 | 2 | 2 | 100% |
| 2026 | 4 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 02 | 24 | 4 | 17% |
| District 04 | 2 | 0 | 0% |
| District 03 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Bit matls tack CT | 40600290 | LB | 13 | 7 (54%) | $0.01 | $0.01 |
| Bit matls PR CT | 40600275 | LB | 12 | 6 (50%) | $0.07 | $0.01 |
| Sidewalk rem | 44000600 | SF | 11 | 4 (36%) | $2.55 | $3.00 |
| Welded wire reinf | 44200050 | SY | 5 | 4 (80%) | $7.30 | $16.00 |
| Comb curb gutter rem | 44000500 | LF | 14 | 3 (21%) | $19.48 | $11.61 |
| Drive pavement rem | 44000200 | SY | 9 | 3 (33%) | $18.20 | $20.00 |
| Saw cuts | 44213200 | LF | 8 | 3 (38%) | $4.00 | $5.00 |
| THPL PVT MK line 4 | 78000200 | LF | 7 | 3 (43%) | $1.50 | $0.88 |
| Comb CC&G TB6.12 | 60603800 | LF | 5 | 3 (60%) | $55.50 | $42.50 |
| Dowel bars 1 1/2 | 44201299 | EACH | 5 | 3 (60%) | $10.85 | $25.00 |
| PC conc sidewalk 5 | 42400200 | SF | 11 | 2 (18%) | $10.50 | $10.00 |
| Tree remov 6-15 | 20100110 | UNIT | 6 | 2 (33%) | $53.25 | $35.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Alliance Contractors, Inc. | 14 | 5 of 14 |
| Sjostrom & Sons, Inc. | 11 | 8 of 11 |
| Civil Constructors, Inc. d/b/a/ Helm Civil | 10 | 4 of 10 |
| Martin & Company Excavating | 9 | 4 of 9 |
| N-Trak Group LLC | 9 | 7 of 9 |
| O'Brien Civil Works, Inc. | 6 | 3 of 6 |
| Phoenix Corporation of the Quad Cities | 6 | 1 of 6 |
| Fischer Excavating, Inc. | 6 | 5 of 6 |
| Copenhaver Construction, Inc. | 5 | 4 of 5 |
| Landmark Contractors, Inc. | 4 | 2 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 JUN 2026 | 64U86 | District 02 | Section D2 | 4 of 4 | $863,552 | +19% |
| 12 JUN 2026 | 85791 | District 02 | Rockton, section 22-00044-00-BT | 3 of 4 | $868,995 | +32% |
| 27 FEB 2026 | 85769 | District 02 | Loves Park, section 21-00078-01-SW | 2 of 6 | $4,115,541 | +3.0% |
| 16 JAN 2026 | 85787 | District 02 | Belvidere, section 23-00118-00-LS | 5 of 7 | $1,721,579 | +25% |
| 19 SEP 2025 | 64P02 | District 02 | Section D2 | 1 of 5 | $1,269,521 | Low, 15% under the second |
| 13 JUN 2025 | 64J66 | District 02 | Section 2-ADA | 1 of 1 | $1,848,165 | Low |
| 17 NOV 2023 | 85727 | District 02 | Rockford, section 20-00635-00-SW | 5 of 6 | $665,691 | +36% |
| 16 JUN 2023 | 85741 | District 02 | Project Number: Ekfu-347 / /, section 21-00633-01-BT | 3 of 3 | $995,443 | +8.0% |
| 18 NOV 2022 | 64R98 | District 02 | Section D2 | 3 of 7 | $723,730 | +30% |
| 17 JUN 2022 | 64N64 | District 02 | Section D2 | 2 of 3 | $293,239 | 0.0% |
| 17 JUN 2022 | 85726 | District 02 | Project Number: Xm3N-979 / /, section 21-00115-00-BT | 1 of 2 | $577,894 | Low, 38% under the second |
| 29 APR 2022 | 85725 | District 02 | Project Number: Bdec-446 / /, section 17-00654-00-BR | 3 of 5 | $1,085,422 | +10% |
| 21 JAN 2022 | 85715 | District 02 | Project Number: Dyw8-744 / /, section 19-00671-00-BR | 5 of 7 | $443,678 | +13% |
| 21 JAN 2022 | 85717 | District 02 | Project Number: 0Dw3-724 / /, section 19-00187-00-BR | 4 of 7 | $708,655 | +33% |
| 21 JAN 2022 | MA032 | District 04 | Section MARSHALL | 5 of 8 | $868,843 | +20% |
| 05 NOV 2021 | 46930 | District 02 | Section ROCK | 3 of 7 | $2,113,574 | +14% |
| 05 NOV 2021 | 64R25 | District 02 | Section (141-1)SLP | 8 of 8 | $256,341 | +109% |
| 05 NOV 2021 | 64R27 | District 02 | Section D2 | 4 of 4 | $752,619 | +26% |
| 05 NOV 2021 | 85695 | District 02 | Durand, section 18-00026-00-SW | 3 of 5 | $1,963,828 | +13% |
| 05 NOV 2021 | 87754 | District 03 | Northern Il University, section 08-00003-00-PV | 1 of 2 | $369,273 | Low, 5.0% under the second |
| 17 SEP 2021 | 89725 | District 04 | City Of Washington, section 17-00120-00-BT | 4 of 8 | $473,425 | +22% |
| 11 JUN 2021 | 85706 | District 02 | Project Number: U1Q2-357 / /, section 16-00633-00-BT | 4 of 5 | $1,609,078 | +51% |
| 11 JUN 2021 | 85708 | District 02 | South Beloit, section 13-00040-01-BT | 4 of 5 | $496,687 | +31% |
| 05 MAR 2021 | 64M35 | District 02 | Section D2 | 1 of 6 | $358,849 | Low, 8.0% under the second |
| 05 MAR 2021 | 64P81 | District 02 | Section D2 | 3 of 4 | $381,957 | +5.0% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.