IDOT contract 64P02 bid tabulation

Section D2. Let by Illinois DOT on September 19, 2025, Ogle, District 02. 5 bids received; low bid $1,269,521 by Stenstrom Excavation & Blacktop, Inc..

Owner
Illinois DOT
Letting
19 SEP 2025
Pay items
75
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Stenstrom Excavation & Blacktop, Inc.$1,269,521Low
2N-Trak Group LLC$1,463,046+15%
3Alliance Contractors, Inc.$1,514,572+19%
4Civil Constructors, Inc. d/b/a/ Helm Civil$1,533,258+21%
5Martin & Company Excavating$1,580,019+24%
IDOT contract 64P02: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Stenstrom Excavation & Blacktop, Inc.2. N-Trak Group LLC3. Alliance Contractors, Inc.4. Civil Constructors, Inc. d/b/a/ Helm Civil5. Martin & Company Excavating
1Rem ST RE snplassy SP (X2600022)EACH10$361.35$350.00$100.00$335.00$200.00
2Temp access- com ent (X4022000)EACH1$1,179.50$1,100.00$1.00$2,200.00$4,000.00
3Temp sidewalk ramp (X4240116)EACH28$812.25$0.01$1.00$2,600.00$5,500.00
4Inlets SPL (X6024240)EACH1$3,000.00$1,600.00$5,494.00$3,100.00$3,950.00
5Fac T4 cab SPL (X8570226)EACH3$24,396$22,700$24,905$24,905$25,500
6Accessible ped signal (X8760200)EACH20$988.00$920.00$1,481.55$1,481.55$1,300.00
7Video veh det sys (X8891001)EACH3$34,966$32,500$30,353$30,353$38,000
8Construction layout (Z0013798)LS1$21,204$35,000$26,200$15,880$24,000
9Property markers (Z0025505)EACH52$80.90$225.00$225.00$75.00$125.00
10Temporary fence (20101000)LF46$5.50$56.00$20.00$17.00$45.00
11Tree trunk protection (20101100)EACH3$86.30$250.00$50.00$200.00$775.00
12Earth excavation (20200100)CY250$70.00$85.00$20.00$100.00$131.00
13Trench backfill (20800150)CY10$65.50$92.00$64.95$50.00$62.00
14Topsoil F & P 4 (21101615)SY430$16.25$17.00$11.58$11.58$10.50
15Sodding salt tolerant (25200110)SY430$43.25$44.00$44.00$44.00$44.00
16Supple watering (25200200)UNIT1$108.00$1,000.00$1,000.00$1,000.00$1,000.00
17Incidental HMA surf (40800050)TON8$419.75$240.00$150.00$850.00$440.00
18PCC driveway pavt 7 (42300300)SY161$105.25$110.00$160.65$110.00$123.00
19PC conc sidewalk 5 (42400200)SF11,397$12.60$12.00$34.35$20.00$13.55
20Detectable warnings (42400800)SF804$45.60$26.00$40.00$50.00$44.00
21HMA surf rem 3 (44000161)SY39$27.50$35.00$99.00$75.00$16.00
22Drive pavement rem (44000200)SY210$28.35$45.00$20.00$24.00$19.00
23Comb curb gutter rem (44000500)LF1,463$26.00$25.00$15.00$30.00$16.30
24Sidewalk rem (44000600)SF10,189$5.40$8.00$2.00$4.00$8.99
25Welded wire reinf (44200050)SY443$6.00$10.00$14.75$17.00$19.40
26CL B patch T2 10 (44200970)SY13$313.50$210.00$300.00$288.00$190.00
27CL B patch T4 10 (44200976)SY443$180.75$150.00$263.35$288.00$190.00
28CL B patch expan JT (44201294)LF558$9.80$15.00$1.20$10.00$0.50
29Dowel bars 1 1/2 (44201299)EACH558$9.00$15.00$9.50$33.00$30.00
30CL D patch T4 6 (44201723)SY38$145.25$125.00$288.95$122.00$94.00
31CL D patch T2 12 (44201789)SY72$170.00$225.00$288.95$215.00$188.00
32CL D patch T3 12 (44201794)SY33$202.75$225.00$288.95$196.00$188.00
33CL D patch T4 12 (44201796)SY265$139.00$250.00$288.95$176.00$188.00
34Saw cuts (44213200)LF558$3.25$13.00$5.55$9.00$6.00
35Tie bars 3/4 (44213204)EACH298$5.50$6.00$3.55$24.00$20.00
36Storm sew CL A 1 15 (550A0070)LF37$152.75$155.00$309.50$150.00$144.00
37Storm sewer rem 15 (55100700)LF46$34.75$41.00$50.00$30.00$44.00
38Dom wat ser box adj (56500600)EACH3$964.00$450.00$150.00$1,200.00$690.00
39Man TA 4 dia T1F CL (60218400)EACH1$6,260.00$3,700.00$6,570.00$4,400.00$4,900.00
40FR & grates adjust (60300105)EACH14$1,277.00$1,100.00$335.00$1,700.00$1,060.00
41Remov inlets (60500060)EACH1$649.00$950.00$1,000.00$1,200.00$850.00
42Comb CC&G TB6.12 (60603800)LF41$62.25$85.00$67.75$79.00$69.00
43Comb CC&G TY B-6.24 (60605000)LF1,475$69.25$85.00$71.65$89.00$69.35
44Non SPL waste disposl (66900200)CY170$91.90$75.00$43.45$95.00$148.00
45Soil disposal analy (66900530)EACH10$1,295.00$1,200.00$1,200.00$1,200.00$1,550.00
46Reg sub P-const plan (66901001)LS1$3,667.00$3,400.00$3,400.00$3,400.00$3,800.00
47Reg sub F con report (66901003)LS1$2,049.00$1,900.00$1,900.00$1,900.00$2,400.00
48Reg sub mon (66901006)CAL DAY10$1,025.00$950.00$2,000.00$950.00$1,150.00
49Engr field office A (67000400)CAL MO12$1,618.00$2,100.00$500.00$2,800.00$3,200.00
50Mobilization (67100100)LS1$72,987$200,000$90,000$91,995$89,000
51TR cont & prot 701501 (70102620)LS1$1.00$1.00$1.00$1.00$1.00
52TR cont & prot 701502 (70102622)LS1$1.00$1.00$1.00$1.00$1.00
53TR cont & prot 701701 (70102635)LS1$1.00$1.00$1.00$1.00$1.00
54TR cont & prot 701801 (70102640)LS1$84,993$125,000$78,800$78,800$52,000
55TR cont surveillance (70103815)CAL DAY172$1.00$0.01$1.00$1.00$200.00
56Changeable message SN (70107025)CAL DAY84$32.35$30.00$30.00$30.00$30.00
57Sign panel T2 (72000200)SF9$95.00$24.00$24.00$24.00$40.00
58Remov sin pan assy TA (72400100)EACH1$593.25$100.00$100.00$100.00$200.00
59Teles STL sin support (72800100)LF165$21.50$18.00$18.00$18.00$30.00
60Mod ureth PM line 6 (78009006)LF2,994$2.15$2.25$2.05$2.25$3.00
61Mod ureth PM line 24 (78009024)LF458$8.65$9.00$8.65$9.00$12.00
62GRV RCSD PVT MRKG 7 (78011035)LF2,994$3.25$0.75$0.95$0.75$1.40
63GRV RCSD PVT MRKG 25 (78011125)LF458$12.95$3.00$4.35$3.00$4.00
64PVT MKG rem WTR blast (78300202)SF2,387$2.15$2.00$3.05$2.00$2.00
65Main EX TR sig instal (85000200)EACH3$3,808.50$3,600.00$5,532.50$5,532.50$5,000.00
66Elcbl C signal 14 2C (87301215)LF3,296$2.35$2.15$1.73$1.73$3.00
67Elcbl C signal 14 3C (87301225)LF3,437$2.60$2.45$1.86$1.86$3.00
68Elcbl C signal 14 5C (87301245)LF2,955$3.05$2.85$2.17$2.17$3.60
69SH LED 1F 3S mam (88030020)EACH5$970.75$900.00$1,095.68$1,095.68$1,400.00
70SH LED 1F 4S BM (88030070)EACH8$1,078.50$1,000.00$1,179.49$1,179.49$1,400.00
71SH LED 1F 4S mam (88030080)EACH10$1,130.35$1,048.00$1,277.79$1,277.79$1,400.00
72Ped SH LED 1F BM CDT (88102717)EACH20$911.50$845.00$960.99$960.99$1,200.00
73TS backplate ret-refl (88200510)EACH13$269.65$250.00$269.91$269.91$350.00
74Remov EX TS equip (89502375)EACH3$6,040.00$5,600.00$2,814.90$2,814.90$8,000.00
75Rebuild EX handhole (89502376)EACH6$1,047.30$975.00$1,723.00$1,723.00$1,300.00
IDOT contract 64P02: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy