IDOT contract 85791 bid tabulation
Rockton, section 22-00044-00-BT. Let by Illinois DOT on June 12, 2026, Winnebago, District 02. 4 bids received; low bid $659,834 by N-Trak Group LLC.
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 72
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | N-Trak Group LLC | $659,834 | Low |
| 2 | Fischer Excavating, Inc. | $698,189 | +6.0% |
| 3 | Stenstrom Excavation & Blacktop, Inc. | $868,995 | +32% |
| 4 | Alliance Contractors, Inc. | $1,032,677 | +57% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. N-Trak Group LLC | 2. Fischer Excavating, Inc. | 3. Stenstrom Excavation & Blacktop, Inc. | 4. Alliance Contractors, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Conn to exist sewer (X0322463) | EACH | 1 | $1,000.00 | $2,200.00 | $2,670.00 | $500.00 |
| 2 | Washout basin (X0326806) | LS | 1 | $500.00 | $500.00 | $1,560.00 | $750.00 |
| 3 | Relocate EX mailbox (X0327301) | EACH | 12 | $250.00 | $265.00 | $850.00 | $200.00 |
| 4 | Connect exist culvert (X0327423) | EACH | 5 | $1,000.00 | $1,200.00 | $1,625.00 | $500.00 |
| 5 | Conn EX DRG structure (X1200160) | EACH | 1 | $1,500.00 | $1,700.00 | $2,070.00 | $500.00 |
| 6 | Earth excavation SPL (X2020410) | CY | 468 | $50.00 | $75.00 | $58.00 | $20.00 |
| 7 | Remove exist riprap (X2810844) | SY | 75 | $30.00 | $30.00 | $61.00 | $20.00 |
| 8 | HMA driveway pavt 3 (X4060280) | SY | 409 | $40.00 | $37.00 | $75.50 | $55.00 |
| 9 | SHLDR rem SPL (X4404262) | SY | 378 | $10.00 | $25.00 | $22.00 | $20.00 |
| 10 | Pedestrian rail SPL (X5090810) | LF | 34 | $390.00 | $307.00 | $1,387.00 | $306.66 |
| 11 | Remov EX flar end sec (X5427602) | EACH | 8 | $500.00 | $700.00 | $500.00 | $500.00 |
| 12 | Reloc EX flar end sec (X5427604) | EACH | 11 | $500.00 | $1,550.00 | $1,745.00 | $525.00 |
| 13 | Inlets SPL (X6024240) | EACH | 1 | $4,000.00 | $4,500.00 | $3,985.00 | $4,723.00 |
| 14 | Plug pipe penetration (X6050188) | EACH | 1 | $750.00 | $900.00 | $2,215.00 | $1,010.00 |
| 15 | Flex delineators (X6350108) | EACH | 29 | $105.00 | $175.00 | $250.00 | $1,000.00 |
| 16 | Wood fence rem & RE-E (X6640630) | LF | 80 | $315.00 | $44.00 | $166.00 | $43.82 |
| 17 | Traf cont & prot SPL (X7010216) | LS | 1 | $10,000 | $10,000 | $25,000 | $11,000 |
| 18 | Sign panel T1 SPL (X7200105) | SF | 2 | $157.00 | $150.00 | $166.00 | $1,000.00 |
| 19 | Handhole to BE adjust (X8140115) | EACH | 2 | $1,800.00 | $2,500.00 | $1,835.00 | $500.00 |
| 20 | Storm sew WM req 12 (Z0056608) | LF | 41 | $125.00 | $118.00 | $138.00 | $137.65 |
| 21 | Storm sew WM req 15 (Z0056610) | LF | 49 | $135.00 | $125.00 | $370.00 | $151.00 |
| 22 | Tree remov 6-15 (20100110) | UNIT | 8 | $360.00 | $350.00 | $70.00 | $350.00 |
| 23 | Furnished excavation (20400800) | CY | 180 | $30.00 | $30.00 | $82.50 | $64.95 |
| 24 | Trench backfill (20800150) | CY | 165 | $35.00 | $49.00 | $0.01 | $65.05 |
| 25 | Topsoil exc & plac (21101505) | CY | 1,063 | $18.00 | $25.00 | $48.00 | $49.75 |
| 26 | Seeding CL 1A (25000110) | ACRE | 0.83 | $18,900 | $5,480.00 | $6,078.00 | $5,480.00 |
| 27 | Nitrogen fert nutr (25000400) | LB | 75 | $5.25 | $5.00 | $5.55 | $5.00 |
| 28 | Phosphorus fert nutr (25000500) | LB | 75 | $5.25 | $5.00 | $5.55 | $5.00 |
| 29 | Potassium fert nutr (25000600) | LB | 75 | $5.25 | $5.00 | $5.55 | $5.00 |
| 30 | Erosion contr blanket (25100630) | SY | 4,032 | $1.31 | $2.10 | $2.35 | $2.10 |
| 31 | Temp ditch checks (28000305) | LF | 20 | $17.00 | $14.20 | $16.00 | $14.20 |
| 32 | Perimeter eros bar (28000400) | LF | 497 | $1.31 | $7.00 | $7.55 | $6.80 |
| 33 | Inlet & pipe protect (28000500) | EACH | 11 | $150.00 | $320.00 | $355.00 | $320.00 |
| 34 | Stone riprap CL A3 (28100105) | SY | 17 | $110.00 | $84.00 | $242.00 | $68.25 |
| 35 | Agg base cse B 4 (35101600) | SY | 142 | $12.00 | $18.00 | $18.00 | $7.40 |
| 36 | Agg base cse B 6 (35101800) | SY | 3,512 | $14.00 | $12.00 | $14.00 | $11.15 |
| 37 | Agg base cse B 8 (35102000) | SY | 409 | $19.00 | $25.00 | $15.00 | $14.80 |
| 38 | Agg base cse B 10 (35102200) | SY | 15 | $28.00 | $22.00 | $44.00 | $18.55 |
| 39 | Agg base cse B 12 (35102400) | SY | 399 | $22.00 | $26.00 | $20.00 | $22.30 |
| 40 | Bit matls PR CT (40600275) | LB | 9,952 | $0.01 | $0.01 | $0.01 | $0.01 |
| 41 | HMA SC IL-9.5 D N50 (40604060) | TON | 675 | $171.00 | $160.00 | $155.00 | $185.00 |
| 42 | PC conc sidewalk 4 (42400100) | SF | 221 | $28.00 | $26.00 | $35.00 | $28.95 |
| 43 | Detectable warnings (42400800) | SF | 54 | $38.00 | $40.00 | $65.00 | $40.00 |
| 44 | Pavement rem (44000100) | SY | 561 | $13.00 | $20.00 | $38.00 | $20.00 |
| 45 | HMA surf rem 3 (44000161) | SY | 422 | $8.50 | $15.00 | $28.00 | $15.00 |
| 46 | Drive pavement rem (44000200) | SY | 745 | $19.00 | $10.00 | $21.00 | $20.00 |
| 47 | Gutter rem (44000400) | LF | 20 | $25.00 | $10.00 | $32.25 | $15.00 |
| 48 | Comb curb gutter rem (44000500) | LF | 384 | $15.00 | $10.00 | $23.00 | $15.00 |
| 49 | Aggregate SHLDS B 6 (48101500) | SY | 65 | $18.00 | $22.00 | $22.00 | $11.40 |
| 50 | Pipe culvert remov (50105220) | LF | 23 | $25.00 | $35.00 | $78.00 | $10.00 |
| 51 | P cul CL A 1 eqrs 27 (542A5482) | LF | 20 | $200.00 | $500.00 | $284.00 | $161.15 |
| 52 | P cul CL C 1 15 (542C0220) | LF | 50 | $135.00 | $110.00 | $166.00 | $133.10 |
| 53 | PRC flar end sec 12 (54213657) | EACH | 3 | $1,700.00 | $1,300.00 | $2,545.00 | $585.00 |
| 54 | Storm sew CL A 1 12 (550A0050) | LF | 410 | $87.00 | $80.00 | $75.00 | $123.15 |
| 55 | Storm sew CL A 1 15 (550A0070) | LF | 963 | $90.00 | $85.00 | $78.00 | $128.60 |
| 56 | Storm sewer rem 12 (55100500) | LF | 150 | $25.00 | $35.00 | $36.50 | $10.00 |
| 57 | Storm sewer rem 15 (55100700) | LF | 142 | $25.00 | $35.00 | $43.50 | $10.00 |
| 58 | Storm sewer rem 18 (55100900) | LF | 304 | $25.00 | $35.00 | $29.00 | $10.00 |
| 59 | CB TC T8G (60207605) | EACH | 4 | $2,400.00 | $3,200.00 | $3,550.00 | $4,678.00 |
| 60 | Man TA 4 dia T1F CL (60218400) | EACH | 1 | $3,000.00 | $4,500.00 | $4,450.00 | $8,340.00 |
| 61 | Man TA 4 dia T5F CL (60218800) | EACH | 6 | $3,000.00 | $5,300.00 | $4,950.00 | $9,720.00 |
| 62 | Man adjust (60255500) | EACH | 1 | $1,000.00 | $1,200.00 | $1,850.00 | $500.00 |
| 63 | VV adjust (60265700) | EACH | 1 | $700.00 | $790.00 | $2,405.00 | $500.00 |
| 64 | Remov manholes (60500040) | EACH | 1 | $1,000.00 | $570.00 | $1,658.19 | $1,000.00 |
| 65 | Comb CC&G TB6.18 (60604400) | LF | 419 | $52.00 | $33.50 | $61.00 | $63.50 |
| 66 | Mobilization (67100100) | LS | 1 | $20,000 | $41,500 | $48,000 | $247,589 |
| 67 | Rem & rel sign panel asmbly TA (72400205) | EACH | 11 | $225.00 | $220.00 | $245.00 | $500.00 |
| 68 | THPL PVT MK line 12 (78000600) | LF | 97 | $21.00 | $20.00 | $22.00 | $40.00 |
| 69 | THPL PVT MK line 24 (78000650) | LF | 15 | $42.00 | $40.00 | $45.00 | $125.00 |
| 70 | Paint PVT MK line 4 (78001110) | LF | 731 | $1.05 | $1.00 | $1.10 | $2.20 |
| 71 | Paint PVT MK line 12 (78001150) | LF | 322 | $3.15 | $3.00 | $3.50 | $6.50 |
| 72 | PVT MKG rem WTR blast (78300202) | SF | 97 | $21.00 | $20.00 | $22.00 | $22.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.