Diamond Construction Company: IDOT bid record

Diamond Construction Company submitted 25 bids on Illinois DOT contracts in the data, from 23 APR 2021 to 12 JUN 2026, and was the low bidder on 18 of them (72%). When it was not low, its total sat a median +6.0% above the low bid.

Owner
Illinois DOT
Low bid volume
$73,252,299
Latest bid
12 JUN 2026
Data through
18 SEP 2026
25Bids
18Low bids
72Win rate, percent
+6.0%Median gap to the low bid when not low, 7 bids

By year

YearBidsLow bidsWin rate
20214375%
202222100%
20236467%
20242150%
20255480%
20266467%
Diamond Construction Company, IDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainees TPGZ0076604HR99 (100%)$15.00$15.00
TraineesZ0076600HR77 (100%)$0.80$0.80
SHRT TRM pavt MK rem70300150SF75 (71%)$5.00$1.20
Terminal marker - DA72501000EACH65 (83%)$55.00$47.85
Raised ref PVT MK rem78300200EACH54 (80%)$20.00$15.00
Grdrail ref type A78200005EACH54 (80%)$11.00$11.00
Short term pavt mking70300100LF83 (38%)$1.50$1.01
Agg wedge SHLD type B48102100TON73 (43%)$45.00$50.00
Incidental HMA surf40800050TON73 (43%)$400.00$250.00
Engr field office A67000400CAL MO53 (60%)$3,500.00$2,550.00
HMA SC IL-9.5 C N5040604050TON53 (60%)$135.00$144.00
HMA BC IL-9.5FG N5040602965TON53 (60%)$145.00$120.00
Diamond Construction Company, IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Illinois Valley Paving, a div of UCM, Inc.107 of 10
DMS Contracting, Inc.11 of 1
IRC, Inc.10 of 1
Diamond Construction Company, IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
12 JUN 202672D29District 06Section (1,2)RS-9,SR1 of 1$7,745,903Low
12 JUN 202693848District 06Project Number: Vjxw-669 / /, section 23-00223-00-FP1 of 1$1,087,655Low
24 APR 202672B63District 06Section (101,102)RS-61 of 1$6,499,144Low
27 FEB 202672295District 06Section 103RS-14,TS-3,1 of 1$18,201,126Low
27 FEB 202693853District 06Project Number: 8Fkl-446 / /, section 20-00102-00-PP2 of 2$5,924,555+4.0%
16 JAN 202672307District 06Section 34RS-52 of 2$7,699,901+8.0%
01 AUG 202572K42District 06Section 103Z,RS-4,TS-1,SW1 of 1$14,948,037Low
13 JUN 202572623District 06Section 75-1SR1 of 2$648,506Low, 1.0% under the second
13 JUN 202572M61District 06Section (107RS-8,CR;108RS-5)DR2 of 2$14,309,757+2.0%
25 APR 202593830District 06Quincy, section 21-00340-00-RS1 of 1$1,576,416Low
17 JAN 202572G59District 06Section (4)N,RS-10,SR1 of 1$2,871,284Low
14 JUN 202472284District 06Section D62 of 2$2,077,480+3.0%
08 MAR 202493816District 06Project Number: 8U97-633 / /, section 21-00062-06-FP1 of 1$1,027,503Low
17 NOV 202372M71District 06Section (6)RS-5,(7)RS-91 of 2$4,650,700Low, 5.0% under the second
16 JUN 202372656District 06Section 9RS-3,10RS-22 of 2$3,770,350+8.0%
28 APR 202372G00District 06Section (102RS-10,1 of 1$4,996,176Low
28 APR 202393802District 06Project Number: He8U-578 / /, section 19-00017-06-FP1 of 1$757,418Low
20 JAN 202372550District 06Section 18RS-13,DR2 of 2$2,399,370+23%
20 JAN 202393798District 06Project Number: S83J-649 / /, section 18-00101-00-PP1 of 2$3,489,688Low, 7.0% under the second
17 JUN 202293788District 06Project Number: Va5R-542 / /, section 16-00017-05-FP1 of 1$1,149,512Low
29 APR 202272N29District 06Section 1-3RS-11 of 1$74,843Low
11 JUN 202172J40District 06Section (127)RS-3,1 of 1$2,288,637Low
11 JUN 202172M60District 06Section (42)R1 of 1$90,440Low
11 JUN 202193765District 06Project Number: Rc5A-672 / /, section 19-00062-05-FP1 of 1$1,149,311Low
23 APR 202193768District 06Project Number: E0Lc-881 / /, section 18-00100-00-PP3 of 4$1,705,876+6.0%
Diamond Construction Company: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.