IDOT contract 72M61 bid tabulation

Section (107RS-8,CR;108RS-5)DR. Let by Illinois DOT on June 13, 2025, Adams, District 06. 2 bids received; low bid $14,071,885 by Illinois Valley Paving, a div of UCM, Inc..

Owner
Illinois DOT
Letting
13 JUN 2025
Pay items
102
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Illinois Valley Paving, a div of UCM, Inc.$14,071,885Low
2Diamond Construction Company$14,309,757+2.0%
IDOT contract 72M61: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Illinois Valley Paving, a div of UCM, Inc.2. Diamond Construction Company
1Exc & GR EX SHLD SPL (X2020060)UNIT17$2,985.08$5,500.00
2Pavt removal SPL (X4404400)SY12,670$93.05$18.50
3Aggregate SHLDS SPL (X4811900)TON632$51.70$200.00
4Gran culvert backfill (X5020108)CY86$225.12$95.00
5Box culvert removal (X5400005)LF49$325.21$180.00
6Memb WTRPRF sys B STR (X5810103)SY105$114.03$75.00
7Conc gutter TA SPL (X6062700)LF27,746$71.81$50.50
8Guardrail remov SPL (X6320100)LF2,351$10.73$11.00
9Temp TRBT T1 SPL tan (X7050167)EACH4$6,627.50$6,750.00
10Width restrict sign (X7200201)LS1$4,757.50$5,000.00
11Conc curb repair (Z0012500)LF5$990.54$500.00
12Construction layout (Z0013798)LS1$57,883$80,000
13Silicone JT seal 1 (Z0021904)LF10$150.48$65.00
14Rock fill - foundatn (Z0054517)TON162$79.54$48.00
15Trainees TPG (Z0076604)HR2,500$15.00$15.00
16Earth excavation (20200100)CY7,621$111.78$20.00
17Rem & disp uns matl (20201200)CY79$241.90$27.00
18Trench backfill (20800150)CY10$143.86$120.00
19Grading & shap ditch (21400100)LF1,236$21.84$36.00
20Seeding CL 2 (25000200)ACRE3.25$2,068.00$2,100.00
21Nitrogen fert nutr (25000400)LB318$1.10$1.50
22Phosphorus fert nutr (25000500)LB318$1.10$1.50
23Potassium fert nutr (25000600)LB318$1.10$1.50
24Agr ground limestone (25000700)TON6.50$55.00$60.00
25Mulch method 2 (25100115)ACRE3.25$2,068.00$2,100.00
26HD eros contr blanket (25100635)SY200$2.20$2.25
27Temp ditch checks (28000305)LF1,590$13.20$21.00
28Perimeter eros bar (28000400)LF660$7.70$10.50
29Stone riprap CL A1 (28100201)TON9$162.76$380.00
30Stone riprap CL A3 (28100205)TON121$326.44$190.00
31Stone riprap CL A5 (28100209)TON114$239.95$105.00
32Filter fabric (28200200)SY98$23.31$8.00
33Sub gran mat B 6 (31101400)SY19,102$19.99$14.50
34PCC base cse W 10 1/2 (35400505)SY7,058$152.65$105.00
35HMA base cse 13 (35501336)SY203$259.40$500.00
36HMA BC wid 10 (35600716)SY462$168.33$250.00
37HMA BC wid 10 1/2 (35600718)SY182$237.98$300.00
38Preparation of base (35800100)SY536$16.38$50.00
39Agg base repair (35800200)TON143$58.38$225.00
40Agg surf course TY B (40200800)TON50$265.75$500.00
41Bit matls tack CT (40600290)LB111,018$1.24$4.00
42Long joint sealant (40600370)LF57,443$2.87$5.00
43Matl transfer device (40600405)TON13,605$4.33$8.00
44HMA surf rem butt JT (40600982)SY1,702$17.18$50.00
45Temporary ramp (40600990)SY107$20.58$25.00
46HMA BC IL-9.5FG N50 (40602965)TON11,327$153.98$190.00
47HMA SC IL-9.5 C N50 (40604050)TON13,605$150.27$185.00
48Bit matls tack CT (40800029)LB857$4.48$4.00
49Incidental HMA surf (40800050)TON305$374.30$350.00
50Pavement rem (44000100)SY203$84.02$38.00
51HMA surf rem 1 1/2 (44000155)SY164,964$3.10$5.00
52Drive pavement rem (44000200)SY408$20.55$43.00
53Paved ditch removal (44004000)LF236$22.17$19.50
54Paved SHLD removal (44004250)SY39$81.83$75.00
55CL C patch T2 13 (44201389)SY13$1,992.87$525.00
56Agg wedge SHLD type B (48102100)TON1,960$38.50$70.00
57HMA shoulders 6 1/2 (48203023)SY716$111.17$110.00
58HMA shoulders (48203100)TON634$172.69$250.00
59Rem exist struct (50100100)EACH1$92,752$30,000
60Structure excavation (50200100)CY78$76.17$30.00
61Name plates (51500100)EACH1$1,700.43$1,900.00
62Temp soil reten systm (52200020)SF618$82.26$140.00
63Box cul end sec C1 (54001001)EACH2$152,398$80,000
64PCBC 7X7 (54010707)LF72$1,819.90$1,600.00
65P cul CL A 1 eqrs 27 (542A5482)LF46$382.18$540.00
66P cul CL D 1 12 (542D0217)LF20$96.28$125.00
67PRCF end S EL eqrs 27 (54214722)EACH1$3,975.25$4,000.00
68Geocomposite wall DR (59100100)SY105$96.55$85.00
69Contr low-streng matl (59300100)CY3$903.28$600.00
70Conc HDWL for P drain (60100060)EACH4$348.09$600.00
71Pipe underdr T 1 4 (60108104)LF3,600$23.61$6.50
72Man TA 4 dia T8G (60219000)EACH1$6,312.08$7,500.00
73Remov inlets (60500060)EACH1$1,057.76$1,500.00
74Class SI conc outlet (60600095)CY340$1,567.37$1,550.00
75SPBGR TY A 6FT posts (63000001)LF1,656$36.03$36.00
76LSG OV cul 18'9" span (63000360)LF19$190.19$190.00
77Traf bar term T6A (63100087)EACH8$5,324.00$5,325.00
78TR bar TRM T1 SPL tan (63100167)EACH11$4,295.50$4,300.00
79Engr field office A (67000400)CAL MO18$3,977.11$5,500.00
80Mobilization (67100100)LS1$380,636$750,000
81Traf cont-prot 701316 (70100100)EACH9$33,367$55,000
82Traf cont-prot 701321 (70100405)EACH1$24,860$200,000
83Traf cont-prot 701201 (70100450)LS1$1,662.10$100,000
84Traf cont-prot 701306 (70100460)LS1$41,800$100,000
85Traf cont-prot 701326 (70100500)LS1$3,029.23$60,000
86Temp BR traf signals (70106500)EACH10$23,863$30,000
87Temp rumble strips (70106700)EACH6$797.50$2,500.00
88Changeable message SN (70107025)CAL DAY756$47.58$90.00
89Short term pavt mking (70300100)LF22,723$1.67$2.00
90SHRT TRM pavt MK rem (70300150)SF2,534$5.61$5.00
91Temp conc barrier (70400100)LF375$75.08$32.50
92Rel temp conc barrier (70400200)LF375$14.58$8.50
93Temp SPBGR TY A (70500100)LF288$56.16$56.00
94Temp SPBGR att to STR (70500500)LF13$745.36$750.00
95Imp attn temp FRN TL3 (70600260)EACH2$6,930.00$9,150.00
96Imp attn rel FRN TL3 (70600332)EACH2$2,805.00$4,250.00
97Terminal marker - DA (72501000)EACH15$55.00$55.00
98Mod ureth PM line 5 (78009005)LF163,845$0.61$0.65
99Raised refl pavt MKR (78100100)EACH727$41.26$42.00
100Grdrail ref type A (78200005)EACH50$11.00$11.00
101Raised ref PVT MK rem (78300200)EACH727$25.34$30.00
102PVT MKG rem grinding (78300201)SF359$3.85$4.00
IDOT contract 72M61: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy