IDOT contract 93848 bid tabulation

Project Number: Vjxw-669 / /, section 23-00223-00-FP. Let by Illinois DOT on June 12, 2026, Adams, District 06. 1 bid received; low bid $1,087,655 by Diamond Construction Company.

Owner
Illinois DOT
Letting
12 JUN 2026
Pay items
26
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Diamond Construction Company$1,087,655Low
IDOT contract 93848: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Diamond Construction Company
1Inlets adjust SPL (X6026200)EACH15$3,250.00
2Traf cont & prot SPL (X7010216)LS1$35,000
3Trainees (Z0076600)HR500$0.80
4Trainees TPG (Z0076604)HR500$15.00
5Bit matls tack CT (40600290)LB12,355$4.00
6Long joint sealant (40600370)LF18,225$5.00
7HMA surf rem butt JT (40600982)SY98$40.00
8Temporary ramp (40600990)SY268$10.00
9HMA BC IL-9.5FG N50 (40602965)TON1,320$185.00
10P HMA SC IL-9.5 D N50 (40604160)TON1,660$180.00
11HMA surf rem 2 1/2 (44000159)SY19,067$6.00
12Comb curb gutter rem (44000500)LF494$34.00
13CL D patch T2 11 (44201777)SY11$500.00
14CL D patch T3 11 (44201781)SY38$500.00
15Inlets adjust (60260100)EACH2$1,715.00
16Valve box adj (60266600)EACH4$770.00
17Comb CC&G TB6.12 aep (60603900)LF494$133.00
18Mobilization (67100100)LS1$40,000
19Short term pavt mking (70300100)LF2,352$2.00
20SHRT TRM pavt MK rem (70300150)SF776$3.00
21THPL PVT MK LTR & sym (78000100)SF520$6.00
22THPL PVT MK line 4 (78000200)LF17,085$1.50
23THPL PVT MK line 6 (78000400)LF256$2.25
24THPL PVT MK line 12 (78000600)LF93$4.50
25THPL PVT MK line 24 (78000650)LF27$5.50
26PVT MKG rem grinding (78300201)SF158$6.50
IDOT contract 93848: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy