IDOT contract 72K42 bid tabulation
Section 103Z,RS-4,TS-1,SW. Let by Illinois DOT on August 1, 2025, Adams, District 06. 1 bid received; low bid $14,948,037 by Diamond Construction Company.
- Owner
- Illinois DOT
- Letting
- 01 AUG 2025
- Pay items
- 187
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Diamond Construction Company | $14,948,037 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Diamond Construction Company |
|---|---|---|---|---|
| 1 | Landscaping gravel (X0323117) | SY | 28 | $45.00 |
| 2 | Cat 5 ethernet cable (X0326812) | LF | 340 | $8.00 |
| 3 | Storm sew CL B 2 8 (X1200046) | LF | 24 | $172.50 |
| 4 | Rem rein CCTV cam/eqt (X1400174) | LS | 1 | $1,350.00 |
| 5 | Decorative stone (X1800024) | SF | 595 | $6.00 |
| 6 | Rem & rel sign panel (X2600011) | EACH | 26 | $110.00 |
| 7 | PC conc sidewalk 4 SP (X4240420) | SF | 15,753 | $25.00 |
| 8 | PC conc sidewalk 8 SP (X4240460) | SF | 1,328 | $29.00 |
| 9 | HMA surf rem var DP (X4401198) | SY | 4,235 | $70.00 |
| 10 | Handrail removal (X5091770) | LF | 53 | $16.50 |
| 11 | Rem EX water valve (X5630405) | EACH | 60 | $1,000.00 |
| 12 | Inlets SPL W/SPL F&G (X6020076) | EACH | 4 | $9,250.00 |
| 13 | Man TA 4 dia SPL F&G (X6022230) | EACH | 1 | $13,250 |
| 14 | Inlets SPL (X6024240) | EACH | 3 | $8,500.00 |
| 15 | Inl recon new F&G SPL (X6026108) | EACH | 9 | $10,000 |
| 16 | Conc curb TB SPL (X6061005) | LF | 256 | $80.00 |
| 17 | Rem stor RE-E SP SPL (X7200053) | EACH | 50 | $400.00 |
| 18 | Reloc EX junct box (X8130120) | EACH | 1 | $2,250.00 |
| 19 | Junction box adjust (X8130130) | EACH | 3 | $775.00 |
| 20 | Handhole to BE adjust (X8140115) | EACH | 3 | $2,250.00 |
| 21 | DBL handhole adjust (X8140116) | EACH | 1 | $2,000.00 |
| 22 | Rel EX LP W/luminaire (X8440110) | EACH | 1 | $2,550.00 |
| 23 | Fib opt CBL 24F SM (X8710029) | LF | 9,555 | $5.50 |
| 24 | Accessible ped signal (X8760200) | EACH | 42 | $2,550.00 |
| 25 | Evp system (X8870300) | EACH | 5 | $16,500 |
| 26 | Video veh det sys 4 cam (X8891013) | EACH | 5 | $50,500 |
| 27 | Rem EX TR cont & cab (X8950105) | EACH | 5 | $1,650.00 |
| 28 | Rem foc FR conduit (X8950510) | LF | 8,809 | $2.00 |
| 29 | Gas valve adjusted (Z0001110) | EACH | 5 | $800.00 |
| 30 | Construction layout (Z0013798) | LS | 1 | $90,000 |
| 31 | TS batt backup system (Z0033068) | EACH | 5 | $11,000 |
| 32 | Storm sew WM req 12 (Z0056608) | LF | 126 | $165.00 |
| 33 | Conc retain wall rem (Z0075496) | LF | 40 | $33.00 |
| 34 | Trainees (Z0076600) | HR | 2,500 | $0.80 |
| 35 | Trainees TPG (Z0076604) | HR | 2,500 | $15.00 |
| 36 | Gran embank spec (20600110) | TON | 8 | $93.00 |
| 37 | Trench backfill (20800150) | CY | 324 | $75.00 |
| 38 | Topsoil exc & plac (21101505) | CY | 143 | $77.00 |
| 39 | Temp eros contr seed (28000250) | LB | 20 | $1.00 |
| 40 | Sub gran mat B 4 (31101200) | SY | 1,359 | $16.00 |
| 41 | PCC base cse W 12 (35400520) | SY | 573 | $200.00 |
| 42 | Bit matls tack CT (40600290) | LB | 48,979 | $5.50 |
| 43 | LNG JNT SLNT half WD (40600372) | LF | 103,918 | $5.50 |
| 44 | Matl transfer device (40600405) | TON | 5,567 | $30.00 |
| 45 | Temporary ramp (40600990) | SY | 1,585 | $50.00 |
| 46 | P HMA BC IL-4.75 N50 (40603200) | TON | 3,152 | $450.00 |
| 47 | P SC SMA 9.5 D N50 (40605022) | TON | 6,053 | $425.00 |
| 48 | Incidental HMA surf (40800050) | TON | 98 | $500.00 |
| 49 | Welded wire reinf (42000060) | SY | 150 | $10.00 |
| 50 | Protective coat (42001300) | SY | 3,143 | $3.50 |
| 51 | PCC driveway pavt 8 (42300400) | SY | 125 | $165.00 |
| 52 | Detectable warnings (42400800) | SF | 561 | $50.00 |
| 53 | Pavement rem (44000100) | SY | 590 | $20.00 |
| 54 | HMA surf rem 2 1/4 (44000158) | SY | 67,816 | $15.00 |
| 55 | Drive pavement rem (44000200) | SY | 122 | $18.00 |
| 56 | Comb curb gutter rem (44000500) | LF | 2,609 | $15.50 |
| 57 | Sidewalk rem (44000600) | SF | 17,128 | $4.00 |
| 58 | Median removal (44003100) | SF | 365 | $24.50 |
| 59 | CL B patch T2 10 (44200970) | SY | 250 | $210.00 |
| 60 | CL B patch T3 10 (44200974) | SY | 50 | $210.00 |
| 61 | CL B patch T4 10 (44200976) | SY | 150 | $210.00 |
| 62 | Dowel bars 1 1/2 (44201299) | EACH | 1,250 | $8.00 |
| 63 | CL C patch T1 12 (44201373) | SY | 7 | $305.00 |
| 64 | CL C patch T2 12 (44201377) | SY | 13 | $250.00 |
| 65 | CL C patch T3 12 (44201381) | SY | 52 | $250.00 |
| 66 | CL C patch T4 12 (44201383) | SY | 121 | $210.00 |
| 67 | Saw cuts (44213200) | LF | 2,000 | $2.00 |
| 68 | Tie bars 3/4 (44213204) | EACH | 50 | $8.00 |
| 69 | Reinforcement bars (50800105) | LB | 40 | $10.00 |
| 70 | Pedestrian rail (50900805) | LF | 53 | $295.00 |
| 71 | Concrete collar (54248510) | CY | 0.90 | $10,500 |
| 72 | Storm sew CL A 2 12 (550A0340) | LF | 158 | $195.00 |
| 73 | Storm sew CL A 2 18 (550A0380) | LF | 8 | $220.00 |
| 74 | Storm sew CL A 2 24 (550A0410) | LF | 44 | $240.00 |
| 75 | Storm sew CL A 2 36 (550A0450) | LF | 52 | $270.00 |
| 76 | Storm sewer rem 8 (55100300) | LF | 30 | $7.00 |
| 77 | Storm sewer rem 12 (55100500) | LF | 136 | $7.00 |
| 78 | Storm sewer rem 18 (55100900) | LF | 29 | $7.00 |
| 79 | Storm sewer rem 24 (55101200) | LF | 23 | $7.00 |
| 80 | Storm sewer rem 36 (55101600) | LF | 62 | $7.00 |
| 81 | Water valves adjust (56109210) | EACH | 21 | $900.00 |
| 82 | Man TA 4 dia T1F CL (60218400) | EACH | 4 | $7,500.00 |
| 83 | Man TA 4 dia T11F&G (60219300) | EACH | 1 | $7,500.00 |
| 84 | Man TA 4 dia T15F&L (60219500) | EACH | 2 | $8,000.00 |
| 85 | Man TA 5 dia T3F&G (60221200) | EACH | 2 | $8,250.00 |
| 86 | Man TA 6 dia T3F&G (60223810) | EACH | 1 | $11,000 |
| 87 | Inlets TA T15F&L (60237000) | EACH | 1 | $3,500.00 |
| 88 | Inlets TB T3F&G (60240220) | EACH | 1 | $4,000.00 |
| 89 | Inlets TB T15F&L (60240320) | EACH | 4 | $4,000.00 |
| 90 | Man adjust (60255500) | EACH | 16 | $1,100.00 |
| 91 | Inlets adjust (60260100) | EACH | 19 | $1,000.00 |
| 92 | Inlets reconst (60262700) | EACH | 1 | $10,000 |
| 93 | Remov inlets (60500060) | EACH | 13 | $850.00 |
| 94 | Comb CC&G TB6.06 (60603500) | LF | 45 | $260.00 |
| 95 | Comb CC&G TB6.12 (60603800) | LF | 1,427 | $82.00 |
| 96 | Comb CC&G TY B-6.24 (60605000) | LF | 1,845 | $86.00 |
| 97 | Conc median surf 4 (60618300) | SF | 152 | $75.00 |
| 98 | Non SPL waste disposl (66900200) | CY | 749 | $225.00 |
| 99 | Soil disposal analy (66900530) | EACH | 11 | $950.00 |
| 100 | Reg sub P-const plan (66901001) | LS | 1 | $3,500.00 |
| 101 | Reg sub F con report (66901003) | LS | 1 | $1,200.00 |
| 102 | Reg sub mon (66901006) | CAL DAY | 100 | $1,000.00 |
| 103 | Engr field office A (67000400) | CAL MO | 18 | $4,000.00 |
| 104 | Mobilization (67100100) | LS | 1 | $925,000 |
| 105 | TR cont & prot 701602 (70102632) | LS | 1 | $500,000 |
| 106 | TR cont & prot 701701 (70102635) | LS | 1 | $25,000 |
| 107 | TR cont & prot 701801 (70102640) | LS | 1 | $40,500 |
| 108 | TR cont surveillance (70103815) | CAL DAY | 50 | $600.00 |
| 109 | Changeable message SN (70107025) | CAL DAY | 1,004 | $50.00 |
| 110 | Night work zone light (70200100) | LS | 1 | $255,000 |
| 111 | Teles STL sin support (72800100) | LF | 192 | $33.00 |
| 112 | Base tel STL sin supp (73100100) | EACH | 10 | $355.00 |
| 113 | Pref PL PM TD STD LTR/sym (78004600) | SF | 1,991 | $42.00 |
| 114 | Pref PL PM TD STD L 5 (78004625) | LF | 29,755 | $7.00 |
| 115 | Pref PL PM TD STD L 6 (78004630) | LF | 8,193 | $8.25 |
| 116 | Pref PL PM TD STD L 8 (78004640) | LF | 384 | $11.00 |
| 117 | Pref PL PM TD STD L12 (78004660) | LF | 1,116 | $18.00 |
| 118 | Pref PL PM TD STD L24 (78004720) | LF | 820 | $35.50 |
| 119 | Mod ureth PM LTR-sym (78009000) | SF | 359 | $26.50 |
| 120 | Mod ureth PM line 5 (78009005) | LF | 2,727 | $5.50 |
| 121 | Mod ureth PM line 6 (78009006) | LF | 2,985 | $6.75 |
| 122 | Mod ureth PM line 24 (78009024) | LF | 432 | $26.50 |
| 123 | GRV RCSD PM LTR & sym (78011000) | SF | 2,007 | $22.00 |
| 124 | GRV RCSD PVT MRKG 6 (78011030) | LF | 29,755 | $1.75 |
| 125 | GRV RCSD PVT MRKG 7 (78011035) | LF | 8,314 | $3.50 |
| 126 | GRV RCSD PVT MRKG 9 (78011045) | LF | 384 | $7.00 |
| 127 | GRV RCSD PVT MRKG 13 (78011065) | LF | 1,116 | $10.00 |
| 128 | GRV RCSD PVT MRKG 25 (78011125) | LF | 888 | $20.00 |
| 129 | Raised refl pavt MKR (78100100) | EACH | 1,082 | $53.00 |
| 130 | Raised ref PVT MK rem (78300200) | EACH | 1,082 | $10.00 |
| 131 | PVT MKG rem WTR blast (78300202) | SF | 3,876 | $13.75 |
| 132 | Elect serv install (80400100) | EACH | 5 | $7,150.00 |
| 133 | Undrgrd C PVC 1 1/2 (81028340) | LF | 275 | $156.50 |
| 134 | Undrgrd C PVC 2 (81028350) | LF | 521 | $156.50 |
| 135 | Undrgrd C PVC 2 1/2 (81028360) | LF | 443 | $163.00 |
| 136 | Undrgrd C PVC 3 (81028370) | LF | 950 | $163.00 |
| 137 | Undrgrd C PVC 3 1/2 (81028380) | LF | 123 | $164.00 |
| 138 | Undrgrd C PVC 4 (81028390) | LF | 608 | $160.00 |
| 139 | Handhole (81400100) | EACH | 18 | $3,520.00 |
| 140 | DBL handhole (81400300) | EACH | 5 | $5,500.00 |
| 141 | EC C XLP use 1C 10 (81702110) | LF | 4,006 | $1.75 |
| 142 | EC C XLP use 3-1C 6 (81702415) | LF | 440 | $8.25 |
| 143 | Lum LED rdwy G (82110007) | EACH | 20 | $1,450.00 |
| 144 | Light pole FDN 30D (83600300) | LF | 6 | $430.00 |
| 145 | Rem pole FDN (84200804) | EACH | 1 | $1,100.00 |
| 146 | Main EX TR sig instal (85000200) | EACH | 5 | $3,300.00 |
| 147 | Fac T4 cab (85700200) | EACH | 5 | $40,700 |
| 148 | Uninter power sup STD (86200200) | EACH | 5 | $15,400 |
| 149 | Elcbl C signal 14 2C (87301215) | LF | 6,455 | $2.25 |
| 150 | Elcbl C signal 14 3C (87301225) | LF | 6,563 | $2.50 |
| 151 | Elcbl C signal 14 5C (87301245) | LF | 9,876 | $4.15 |
| 152 | Elcbl C signal 14 7C (87301255) | LF | 4,599 | $6.00 |
| 153 | Elcbl C comm 18 3PR (87301705) | LF | 4,141 | $8.00 |
| 154 | Elcbl C serv 6 2C (87301805) | LF | 184 | $9.00 |
| 155 | Elcbl C egrdc 6 1C (87301900) | LF | 6,060 | $4.00 |
| 156 | TS post galvs 19 (87502530) | EACH | 12 | $4,100.00 |
| 157 | Ped P-B post galvs T1 (87601100) | EACH | 10 | $1,675.00 |
| 158 | STL comb maa&P 30 (87702880) | EACH | 1 | $24,300 |
| 159 | STL comb maa&P 34 (87702900) | EACH | 1 | $27,000 |
| 160 | STL comb maa&P 38 (87702920) | EACH | 1 | $29,050 |
| 161 | STL comb maa&P 40 (87702930) | EACH | 4 | $30,600 |
| 162 | STL comb maa&P 46 (87702960) | EACH | 1 | $33,500 |
| 163 | STL comb maa&P 52 (87702985) | EACH | 1 | $36,500 |
| 164 | STL comb maa&P 54 (87702990) | EACH | 2 | $37,675 |
| 165 | STL comb maa&P 58 (87703020) | EACH | 1 | $41,500 |
| 166 | STL comb maa&P 60 (87703030) | EACH | 1 | $45,000 |
| 167 | STL comb maa&P 64 (87703050) | EACH | 1 | $50,000 |
| 168 | Conc FDN TY A (87800100) | LF | 18 | $430.00 |
| 169 | Conc FDN TY C (87800150) | LF | 15 | $1,350.00 |
| 170 | Conc FDN TY E 36D (87800415) | LF | 145 | $1,450.00 |
| 171 | Conc FDN TY E 42D (87800420) | LF | 86 | $1,515.00 |
| 172 | SH P LED 1F 3S BM (88040070) | EACH | 14 | $2,000.00 |
| 173 | SH P LED 1F 3S mam (88040090) | EACH | 34 | $2,200.00 |
| 174 | SH P LED 1F 4S BM (88040110) | EACH | 18 | $2,450.00 |
| 175 | SH P LED 1F 4S mam (88040120) | EACH | 19 | $2,100.00 |
| 176 | SH P LED 1F 5S BM (88040150) | EACH | 27 | $2,200.00 |
| 177 | SH P LED 1F 5S mam (88040160) | EACH | 1 | $2,450.00 |
| 178 | Ped SH P LED 1F BM CT (88102825) | EACH | 40 | $1,050.00 |
| 179 | TS backplate ret-refl (88200510) | EACH | 113 | $451.00 |
| 180 | Temp TR sig install (89000100) | EACH | 5 | $93,500 |
| 181 | Rem EX serv install (89500120) | EACH | 5 | $1,800.00 |
| 182 | Mod EX contr cab (89502210) | EACH | 5 | $1,720.00 |
| 183 | Rem elcbl FR con (89502300) | LF | 440 | $1.65 |
| 184 | Remov EX TS equip (89502375) | EACH | 5 | $10,450 |
| 185 | Remov EX handhole (89502380) | EACH | 17 | $1,550.00 |
| 186 | Remov EX DBL handhole (89502382) | EACH | 5 | $1,900.00 |
| 187 | Remov EX conc FDN (89502385) | EACH | 32 | $2,950.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of August 1, 2025. Compiled by Mirage Metrics.