IDOT contract 80B87 bid tabulation
Section 2025-2046-RS. Let by Illinois DOT on June 12, 2026, Cook, District 01. 4 bids received; low bid $3,116,448 by Builders Paving, LLC.
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 73
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Builders Paving, LLC | $3,116,448 | Low |
| 2 | K-Five Construction Corporation | $3,235,013 | +4.0% |
| 3 | Plote Construction, Inc. | $3,747,000 | +20% |
| 4 | R. W. Dunteman Company | $3,924,190 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Builders Paving, LLC | 2. K-Five Construction Corporation | 3. Plote Construction, Inc. | 4. R. W. Dunteman Company |
|---|---|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $6,500.00 | $5,000.00 | $40,000 | $20,000 |
| 2 | CC&G RMVL repl < = 10 (X4400501) | LF | 1,400 | $42.00 | $42.00 | $48.00 | $77.50 |
| 3 | CC&G RMVL repl > 10FT (X4400503) | LF | 12,070 | $42.00 | $40.00 | $45.00 | $53.25 |
| 4 | Median surf removal (X4403800) | SF | 3,110 | $5.00 | $2.00 | $9.00 | $10.50 |
| 5 | SS cleaned 12 (X5537800) | LF | 2,000 | $2.00 | $2.00 | $2.00 | $2.00 |
| 6 | FR & lids adjust SPL (X6030310) | EACH | 22 | $1,000.00 | $1,150.00 | $1,150.00 | $1,150.00 |
| 7 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 6 | $4,000.00 | $3,500.00 | $4,800.00 | $3,500.00 |
| 8 | Traf cont-prot TC8 (X7010808) | EACH | 2 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 |
| 9 | Temp info signing (X7200061) | SF | 103 | $25.00 | $25.00 | $25.00 | $25.00 |
| 10 | Det loop repl (X8860105) | LF | 1,435 | $20.09 | $20.10 | $20.09 | $20.09 |
| 11 | Drainage STR cleaned (Z0018500) | EACH | 201 | $350.00 | $312.00 | $315.00 | $312.00 |
| 12 | Earth excavation (20200100) | CY | 25 | $65.00 | $100.00 | $55.00 | $157.00 |
| 13 | Topsoil F & P 4 (21101615) | SY | 1,490 | $11.50 | $11.50 | $11.50 | $11.50 |
| 14 | Sodding salt tolerant (25200110) | SY | 1,490 | $14.50 | $14.50 | $14.50 | $14.50 |
| 15 | Supple watering (25200200) | UNIT | 15 | $175.00 | $175.00 | $175.00 | $175.00 |
| 16 | HMA base cse 6 (35501308) | SY | 46 | $100.00 | $135.00 | $220.00 | $69.50 |
| 17 | Bit matls tack CT (40600290) | LB | 64,860 | $0.01 | $0.01 | $0.01 | $0.01 |
| 18 | Long joint sealant (40600370) | LF | 28,000 | $2.44 | $2.50 | $3.25 | $3.00 |
| 19 | Mix CR JTS flangewys (40600400) | TON | 145 | $500.00 | $50.00 | $100.00 | $385.00 |
| 20 | HMA surf rem butt JT (40600982) | SY | 961 | $15.00 | $0.01 | $9.00 | $21.00 |
| 21 | HMA repl over patch (40601005) | TON | 216 | $80.00 | $65.00 | $230.00 | $160.00 |
| 22 | P HMA BC IL-4.75 N50 (40603200) | TON | 3,965 | $73.00 | $85.00 | $125.00 | $121.75 |
| 23 | HMA SC IL-9.5 D N50 (40604060) | TON | 6 | $400.00 | $300.00 | $400.00 | $282.75 |
| 24 | HMA SC IL-9.5 D N70 (40604062) | TON | 8,075 | $67.00 | $60.00 | $88.00 | $111.00 |
| 25 | Protective coat (42001300) | SY | 50 | $0.01 | $1.00 | $1.00 | $4.50 |
| 26 | PCC driveway pavt 8 (42300400) | SY | 60 | $90.00 | $100.00 | $115.00 | $95.00 |
| 27 | PC conc sidewalk 5 (42400200) | SF | 4,070 | $11.00 | $8.50 | $13.00 | $8.30 |
| 28 | Detectable warnings (42400800) | SF | 200 | $40.00 | $32.00 | $40.00 | $39.75 |
| 29 | HMA surf rem 2 1/4 (44000158) | SY | 96,100 | $2.50 | $0.01 | $2.80 | $4.90 |
| 30 | Drive pavement rem (44000200) | SY | 105 | $60.00 | $20.00 | $36.00 | $30.50 |
| 31 | Sidewalk rem (44000600) | SF | 4,070 | $5.00 | $2.00 | $2.00 | $2.25 |
| 32 | HMA RM OV patch 2 1/4 (44002209) | SY | 1,712 | $5.00 | $1.00 | $18.00 | $11.75 |
| 33 | CL D patch T1 10 (44201761) | SY | 48 | $80.00 | $31.00 | $170.00 | $138.00 |
| 34 | CL D patch T2 10 (44201765) | SY | 800 | $80.00 | $31.00 | $160.00 | $106.00 |
| 35 | CL D patch T3 10 (44201769) | SY | 550 | $80.00 | $31.00 | $160.00 | $105.50 |
| 36 | CL D patch T4 10 (44201771) | SY | 440 | $80.00 | $31.00 | $160.00 | $95.50 |
| 37 | CB adjust (60250200) | EACH | 1 | $400.00 | $450.00 | $450.00 | $450.00 |
| 38 | CB reconst (60252800) | EACH | 7 | $1,000.00 | $945.00 | $945.00 | $975.00 |
| 39 | Man adjust (60255500) | EACH | 3 | $400.00 | $450.00 | $450.00 | $450.00 |
| 40 | Man reconst (60257900) | EACH | 4 | $1,050.00 | $1,150.00 | $1,150.00 | $1,150.00 |
| 41 | FR & grates adjust (60300105) | EACH | 120 | $400.00 | $450.00 | $450.00 | $450.00 |
| 42 | FR & lids adjust (60300305) | EACH | 81 | $400.00 | $450.00 | $450.00 | $450.00 |
| 43 | FR & grates T24 (60404950) | EACH | 10 | $485.00 | $460.00 | $460.00 | $460.00 |
| 44 | FR & lids T1 OL (60406000) | EACH | 10 | $450.00 | $450.00 | $450.00 | $450.00 |
| 45 | FR & lids T1 CL (60406100) | EACH | 12 | $450.00 | $450.00 | $450.00 | $450.00 |
| 46 | Conc median surf 4 (60618300) | SF | 3,110 | $10.00 | $8.00 | $14.00 | $8.05 |
| 47 | Non SPL waste disposl (66900200) | CY | 25 | $145.00 | $100.00 | $95.00 | $120.00 |
| 48 | Soil disposal analy (66900530) | EACH | 3 | $825.00 | $825.00 | $825.00 | $825.00 |
| 49 | Reg sub P-const plan (66901001) | LS | 1 | $5,200.00 | $5,200.00 | $5,200.00 | $5,200.00 |
| 50 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $500.00 | $500.00 | $500.00 |
| 51 | Reg sub mon (66901006) | CAL DAY | 5 | $715.00 | $715.00 | $715.00 | $715.00 |
| 52 | Mobilization (67100100) | LS | 1 | $557,495 | $469,500 | $225,000 | $212,000 |
| 53 | TR cont & prot 701606 (70102625) | LS | 1 | $30,000 | $747,000 | $177,000 | $42,250 |
| 54 | TR cont & prot 701601 (70102630) | LS | 1 | $30,000 | $10,000 | $176,763 | $42,250 |
| 55 | TR cont & prot 701701 (70102635) | LS | 1 | $5,000.00 | $2,000.00 | $4,000.00 | $43,500 |
| 56 | TR cont & prot 701801 (70102640) | LS | 1 | $15,000 | $3,000.00 | $4,000.00 | $3,275.40 |
| 57 | Short term pavt mking (70300100) | LF | 16,000 | $0.01 | $0.01 | $0.01 | $1.30 |
| 58 | SHRT TRM pavt MK rem (70300150) | SF | 1,350 | $0.01 | $2.00 | $0.01 | $2.75 |
| 59 | Temp PVT MK LTR & sym paint (70300211) | SF | 110 | $0.01 | $0.01 | $0.01 | $4.70 |
| 60 | Temp PVT MK line 4 - paint (70300221) | LF | 12,100 | $0.01 | $0.01 | $0.01 | $0.80 |
| 61 | Temp PVT MK line 6 - paint (70300241) | LF | 600 | $0.01 | $0.01 | $0.01 | $1.20 |
| 62 | Temp PVT MK line 8 - paint (70300251) | LF | 300 | $0.01 | $0.01 | $0.01 | $1.55 |
| 63 | Temp PVT MK line 12 - paint (70300261) | LF | 250 | $0.01 | $0.01 | $0.01 | $2.35 |
| 64 | Temp PVT MK line 24 - paint (70300281) | LF | 500 | $0.01 | $0.01 | $0.01 | $4.70 |
| 65 | Temp PVT MK L4 T4 tape (70307120) | LF | 4,000 | $0.01 | $1.50 | $0.01 | $1.50 |
| 66 | THPL PVT MK LTR & sym (78000100) | SF | 110 | $5.50 | $6.00 | $5.50 | $6.00 |
| 67 | THPL PVT MK line 4 (78000200) | LF | 12,100 | $1.00 | $0.80 | $1.00 | $0.80 |
| 68 | THPL PVT MK line 6 (78000400) | LF | 600 | $1.50 | $1.50 | $1.50 | $1.50 |
| 69 | THPL PVT MK line 8 (78000500) | LF | 300 | $1.90 | $1.85 | $1.90 | $1.85 |
| 70 | THPL PVT MK line 12 (78000600) | LF | 250 | $3.45 | $3.00 | $3.45 | $3.00 |
| 71 | THPL PVT MK line 24 (78000650) | LF | 500 | $5.50 | $6.00 | $5.50 | $6.00 |
| 72 | Raised refl pavt MKR (78100100) | EACH | 700 | $38.50 | $47.00 | $38.50 | $47.00 |
| 73 | Raised ref PVT MK rem (78300200) | EACH | 640 | $5.00 | $11.00 | $9.00 | $18.79 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.