IDOT contract 80B35 bid tabulation

Section 2025-2003-RS. Let by Illinois DOT on June 12, 2026, Cook, District 01. 4 bids received; low bid $2,873,926 by K-Five Construction Corporation.

Owner
Illinois DOT
Letting
12 JUN 2026
Pay items
116
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1K-Five Construction Corporation$2,873,926Low
2R. W. Dunteman Company$2,889,889+1.0%
3Builders Paving, LLC$2,920,609+2.0%
4Plote Construction, Inc.$2,934,000+2.0%
IDOT contract 80B35: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. K-Five Construction Corporation2. R. W. Dunteman Company3. Builders Paving, LLC4. Plote Construction, Inc.
1Prun safety/equip CLR (K1004595)LS1$3,500.00$17,000$17,000$3,500.00
2Constructn layout SPL (X0320050)LS1$5,600.00$10,500$10,000$60,000
3Rem & rein bric paver (X0327611)SF424$25.00$24.10$35.00$25.00
4Ped signal post 10 FT (X1400367)EACH3$2,270.00$2,774.34$2,270.00$2,270.00
5Ped signal post 5 FT (X1400378)EACH3$2,033.00$2,484.69$2,033.00$2,033.00
6Tree limb rem 4-10 (X2010100)EACH2$100.00$95.00$400.00$125.00
7Tree limb rem over 10 (X2010200)EACH3$150.00$110.00$800.00$300.00
8Detectable warn SPL (X4240800)SF118$60.00$46.61$50.00$46.00
9CC&G RMVL repl < = 10 (X4400501)LF209$45.00$86.80$55.00$51.98
10CC&G RMVL repl > 10FT (X4400503)LF4,123$40.00$59.37$55.00$49.75
11SS cleaned 12 (X5537800)LF2,175$2.00$2.00$2.00$2.00
12FR & lids adjust SPL (X6030310)EACH53$950.00$1,125.00$1,050.00$950.00
13Delineator removal (X6350120)EACH45$7.37$85.34$97.50$126.29
14Engrs FLD ofc TY A D1 (X6700407)CAL MO12$3,500.00$3,750.00$2,850.00$4,800.00
15Temp info signing (X7200061)SF154$15.00$15.00$15.00$15.00
16Accessible ped signal (X8760200)EACH32$2,666.00$3,258.32$2,666.00$2,666.00
17Conc FDN TY A 12D (X8780012)LF24$869.00$1,062.07$869.00$869.00
18LED SF lens cover (X8809005)EACH11$534.00$652.64$534.00$534.00
19Video veh det sys (X8891001)EACH2$16,384$20,024$16,384$16,384
20Drainage STR cleaned (Z0018500)EACH145$325.00$350.00$315.00$325.00
21RE-optimize TR sig sys 1 (Z0033044)EACH6$1,750.00$2,138.81$1,750.00$1,750.00
22RR prot liability ins (Z0048665)LS1$1,775.00$2,500.00$2,235.00$4,000.00
23Tree remov 6-15 (20100110)UNIT9$40.00$30.00$60.00$30.00
24Tree remov over 15 (20100210)UNIT22$60.00$45.00$100.00$40.00
25Earth excavation (20200100)CY57$55.00$101.37$65.00$57.89
26Topsoil F & P 4 (21101615)SY355$7.00$15.00$15.00$12.00
27Sodding salt tolerant (25200110)SY355$35.00$25.00$25.00$15.00
28Supple watering (25200200)UNIT6$50.00$40.00$40.00$100.00
29Agg base cse B 6 (35101800)SY27$10.00$44.05$50.00$55.00
30HMA base cse 6 (35501308)SY21$50.00$103.96$120.00$158.00
31Bit matls tack CT (40600290)LB22,951$0.01$0.67$0.01$0.01
32Long joint sealant (40600370)LF22,993$4.00$2.59$2.75$3.30
33Mix CR JTS flangewys (40600400)TON77$50.00$394.22$300.00$100.00
34HMA surf rem butt JT (40600982)SY441$0.01$29.74$25.00$12.00
35HMA SC IL-9.5 D N50 (40604060)TON2.40$75.00$487.29$3,335.00$350.00
36P HMA SC SMA 9.5 F N80 (40605026)TON4,998$150.00$129.76$110.00$130.00
37Protective coat (42001300)SY1,583$1.00$0.01$0.01$2.50
38PCC driveway pavt 6 (42300200)SY38$85.00$80.97$90.00$99.38
39PCC driveway pavt 8 (42300400)SY42$95.00$95.23$99.00$110.83
40PC conc sidewalk 5 (42400200)SF6,216$9.00$8.39$10.00$9.29
41PC conc sidewalk 8 (42400410)SF247$10.00$12.82$12.00$12.96
42Detectable warnings (42400800)SF343$32.00$37.28$40.00$46.00
43HMA surf rem 1 3/4 (44000156)SY51,003$5.00$2.79$7.00$2.50
44Drive pavement rem (44000200)SY101$15.00$30.60$27.00$25.50
45Sidewalk rem (44000600)SF6,190$2.00$2.07$5.00$2.85
46CL D patch T1 10 (44201761)SY15$29.00$155.00$168.00$140.00
47CL D patch T2 10 (44201765)SY492$29.00$124.00$133.00$80.00
48CL D patch T3 10 (44201769)SY41$29.00$115.00$119.00$80.00
49CL D patch T4 10 (44201771)SY84$29.00$106.50$104.00$80.00
50CB reconst (60252800)EACH8$1,175.00$1,185.00$1,200.00$1,175.00
51Man reconst (60257900)EACH3$1,175.00$1,450.00$1,175.00$1,175.00
52Inlets reconst (60262700)EACH2$990.00$880.00$990.00$990.00
53Valve box adj (60266600)EACH2$150.00$350.00$150.00$150.00
54FR & grates adjust (60300105)EACH32$450.00$450.00$450.00$450.00
55FR & lids adjust (60300305)EACH6$450.00$550.00$450.00$450.00
56FR & grates T24 (60404950)EACH1$460.00$485.00$460.00$460.00
57FR & lids T1 OL (60406000)EACH5$450.00$450.00$450.00$450.00
58FR & lids T1 CL (60406100)EACH30$450.00$450.00$450.00$450.00
59Non SPL waste disposl (66900200)CY60$117.34$111.51$145.00$53.13
60Soil disposal analy (66900530)EACH1$1,550.00$1,550.00$1,550.00$1,450.00
61Reg sub P-const plan (66901001)LS1$3,400.00$3,400.00$3,400.00$3,100.00
62Reg sub F con report (66901003)LS1$500.00$500.00$500.00$1,200.00
63Reg sub mon (66901006)CAL DAY15$700.00$700.00$700.00$680.00
64Mobilization (67100100)LS1$172,436$173,332$306,991$177,000
65TR cont & prot 701606 (70102625)LS1$193,023$53,733$3,730.00$191,616
66TR cont & prot 701602 (70102632)LS1$3,730.00$3,730.00$3,730.00$192,696
67TR cont & prot 701611 (70102634)LS1$3,730.00$3,730.00$3,730.00$6,000.00
68TR cont & prot 701701 (70102635)LS1$3,730.00$3,730.00$3,730.00$6,000.00
69TR cont & prot 701801 (70102640)LS1$3,730.00$3,730.00$3,730.00$6,000.00
70Short term pavt mking (70300100)LF7,910$1.00$1.46$1.65$0.01
71SHRT TRM pavt MK rem (70300150)SF2,637$2.00$1.40$0.01$0.01
72Temp PVT MK LTR & sym paint (70300211)SF973$1.75$1.75$1.75$0.01
73Temp PVT MK line 4 - paint (70300221)LF30,564$0.35$0.35$0.35$0.01
74Temp PVT MK line 6 - paint (70300241)LF2,822$0.53$0.53$0.53$0.01
75Temp PVT MK line 8 - paint (70300251)LF715$0.70$0.70$0.70$0.01
76Temp PVT MK line 12 - paint (70300261)LF2,959$1.06$1.06$1.06$0.01
77Temp PVT MK line 24 - paint (70300281)LF1,627$1.60$1.60$1.60$0.01
78Temp PVT MK L4 T4 tape (70307120)LF30,564$1.25$1.25$1.25$0.01
79THPL PVT MK LTR & sym (78000100)SF973$6.00$6.00$6.00$6.00
80THPL PVT MK line 4 (78000200)LF30,564$0.70$0.70$0.70$0.70
81THPL PVT MK line 6 (78000400)LF2,822$0.75$0.75$0.75$0.75
82THPL PVT MK line 8 (78000500)LF715$1.95$1.95$1.95$1.95
83THPL PVT MK line 12 (78000600)LF2,959$3.00$3.00$3.00$3.00
84THPL PVT MK line 24 (78000650)LF1,627$6.00$6.00$6.00$6.00
85Raised refl pavt MKR (78100100)EACH891$36.50$36.50$36.50$36.50
86Raised ref PVT MK rem (78300200)EACH891$7.37$13.49$13.81$12.00
87PVT MKG rem WTR blast (78300202)SF200$20.00$20.00$20.00$15.00
88Undrgrd C galvs 2 (81028200)LF429$85.20$104.13$85.20$85.20
89Undrgrd C galvs 3 (81028220)LF100$99.10$121.12$99.10$99.10
90HD handhole (81400200)EACH18$502.00$613.53$502.00$502.00
91Main EX TR sig instal (85000200)EACH6$10,000$12,222$10,000$10,000
92Elcbl C signal 14 2C (87301215)LF4,803$3.90$4.77$3.90$3.90
93Elcbl C signal 14 3C (87301225)LF1,367$4.10$5.01$4.10$4.10
94Elcbl C signal 14 5C (87301245)LF953$4.70$5.74$4.70$4.70
95Elcbl C signal 14 7C (87301255)LF881$5.50$6.72$5.50$5.50
96Elcbl C lead 14 1PR (87301305)LF1,777$4.10$5.01$4.10$4.10
97Elcbl C egrdc 6 1C (87301900)LF372$5.10$6.23$5.10$5.10
98S maa & P 30 (87700190)EACH1$18,933$23,139$18,933$18,933
99S maa & P 38 (87700230)EACH1$22,456$27,445$22,456$22,456
100Conc FDN TY E 30D (87800400)LF2$2,980.00$3,642.09$2,980.00$2,980.00
101Drill EX handhole (87900200)EACH9$1,217.00$1,487.39$1,217.00$1,217.00
102SH LED 1F 3S mam (88030020)EACH5$1,662.00$1,982.37$1,622.00$1,622.00
103SH LED 1F 3S BM (88030050)EACH2$1,462.00$1,786.83$1,462.00$1,462.00
104SH LED 1F 4S BM (88030070)EACH1$1,542.00$1,884.60$1,542.00$1,542.00
105SH LED 1F 4S mam (88030080)EACH1$1,712.00$2,092.37$1,712.00$1,712.00
106SH LED 1F 5S BM (88030100)EACH2$1,745.00$2,132.70$1,745.00$1,745.00
107SH LED 1F 5S mam (88030110)EACH2$1,929.00$2,357.58$1,929.00$1,929.00
108Ped SH LED 1F BM CDT (88102717)EACH11$1,915.00$2,340.47$1,915.00$1,915.00
109TS backplate L F plas (88200410)EACH1$645.00$788.30$645.00$645.00
110Inductive loop detect (88500100)EACH10$244.00$298.21$244.00$244.00
111Det loop T1 (88600100)LF3,195$50.70$61.96$50.70$50.70
112Mod EX contr cab (89502210)EACH3$3,775.00$4,613.72$3,775.00$3,775.00
113Rem elcbl FR con (89502300)LF5,295$0.80$0.98$0.80$0.80
114Remov EX TS equip (89502375)EACH6$3,200.00$3,910.97$3,200.00$3,200.00
115Rebuild EX handhole (89502376)EACH6$4,557.00$5,569.46$4,557.00$4,557.00
116Remov EX handhole (89502380)EACH17$1,200.00$1,466.61$1,200.00$1,200.00
IDOT contract 80B35: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy