IDOT contract 80B15 bid tabulation
Section 2025-1089-RS. Let by Illinois DOT on February 27, 2026, Dupage, District 01. 4 bids received; low bid $4,255,555 by R. W. Dunteman Company.
- Owner
- Illinois DOT
- Letting
- 27 FEB 2026
- Pay items
- 100
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | R. W. Dunteman Company | $4,255,555 | Low |
| 2 | K-Five Construction Corporation | $4,711,301 | +11% |
| 3 | Plote Construction, Inc. | $4,781,387 | +12% |
| 4 | Schroeder Asphalt Services, Inc. | $5,259,987 | +24% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. R. W. Dunteman Company | 2. K-Five Construction Corporation | 3. Plote Construction, Inc. | 4. Schroeder Asphalt Services, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $5,000.00 | $2,200.00 | $30,000 | $30,000 |
| 2 | Rem & rein bric paver (X0327611) | SF | 895 | $15.00 | $15.00 | $15.00 | $25.00 |
| 3 | PCC surf rem var DP (X4400100) | SY | 1,386 | $7.72 | $8.78 | $15.80 | $8.95 |
| 4 | CC&G RMVL repl > 10FT (X4400503) | LF | 1,505 | $61.10 | $48.00 | $67.00 | $75.00 |
| 5 | Long par dep rem 2 (X4405020) | LF | 3,500 | $8.80 | $1.00 | $2.80 | $6.50 |
| 6 | PCC surf rem 2 3/4 (X4406822) | SY | 1,918 | $5.97 | $15.00 | $11.50 | $8.95 |
| 7 | SS cleaned 12 (X5537800) | LF | 2,500 | $2.00 | $2.00 | $2.00 | $3.00 |
| 8 | FR & lids adjust SPL (X6030310) | EACH | 52 | $1,050.00 | $1,050.00 | $1,050.00 | $1,400.00 |
| 9 | Maint traff ill tlwy (X7010005) | LS | 1 | $6,000.00 | $1.00 | $10,000 | $100,000 |
| 10 | Traf cont-prot TC8 (X7010808) | EACH | 4 | $975.00 | $750.00 | $2,000.00 | $1,000.00 |
| 11 | Temp info signing (X7200061) | SF | 282.70 | $13.00 | $15.00 | $15.00 | $18.00 |
| 12 | Accessible ped signal (X8760200) | EACH | 4 | $2,447.35 | $2,686.50 | $2,447.35 | $3,200.00 |
| 13 | Det loop repl (X8860105) | LF | 1,705 | $29.91 | $28.17 | $29.91 | $32.00 |
| 14 | Drainage STR adj (Z0018400) | EACH | 122 | $450.00 | $450.00 | $450.00 | $525.00 |
| 15 | Drainage STR cleaned (Z0018500) | EACH | 20 | $350.00 | $350.00 | $350.00 | $375.00 |
| 16 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 1 | $864.00 | $855.00 | $864.00 | $1,100.00 |
| 17 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 | $0.80 | $0.80 |
| 18 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 | $15.00 |
| 19 | Nitrogen fert nutr (20101400) | LB | 83 | $1.50 | $1.50 | $1.50 | $2.00 |
| 20 | Phosphorus fert nutr (20101500) | LB | 83 | $1.50 | $1.50 | $1.50 | $2.00 |
| 21 | Potassium fert nutr (20101600) | LB | 83 | $1.50 | $1.50 | $1.50 | $2.00 |
| 22 | Earth excavation (20200100) | CY | 1,213 | $35.19 | $77.95 | $115.00 | $60.00 |
| 23 | Geotech fab F/GR stab (21001000) | SY | 475 | $2.63 | $1.37 | $5.50 | $3.00 |
| 24 | Topsoil F & P 4 (21101615) | SY | 4,417 | $5.00 | $5.00 | $5.00 | $5.80 |
| 25 | Sodding salt tolerant (25200110) | SY | 4,417 | $11.00 | $11.00 | $11.00 | $12.50 |
| 26 | Supple watering (25200200) | UNIT | 45 | $0.01 | $0.01 | $0.01 | $20.00 |
| 27 | Agg subgrade improve (30300001) | CY | 159 | $65.00 | $70.00 | $100.00 | $70.00 |
| 28 | Agg subgrade impr 12 (30300112) | SY | 1,898 | $19.00 | $31.74 | $40.75 | $22.00 |
| 29 | HMA base cse 8 (35501316) | SY | 410 | $56.00 | $75.00 | $100.00 | $43.70 |
| 30 | HMA base cse 11 (35501328) | SY | 1,845 | $66.72 | $65.00 | $95.00 | $60.00 |
| 31 | HMA BC wid 11 (35600720) | SY | 53 | $71.55 | $65.00 | $95.00 | $70.00 |
| 32 | Bit matls tack CT (40600290) | LB | 48,369 | $0.90 | $0.01 | $0.01 | $0.01 |
| 33 | Long joint sealant (40600370) | LF | 39,175 | $2.50 | $2.50 | $3.15 | $3.10 |
| 34 | Mix CR JTS flangewys (40600400) | TON | 108 | $377.60 | $350.00 | $100.00 | $290.00 |
| 35 | PCC surf rem butt JT (40600985) | SY | 463 | $23.28 | $35.00 | $22.00 | $15.00 |
| 36 | P HMA BC IL-4.75 N50 (40603200) | TON | 3,942 | $102.79 | $131.00 | $118.00 | $109.00 |
| 37 | HMA SC IL-9.5 D N50 (40604060) | TON | 46 | $160.09 | $300.00 | $350.00 | $100.00 |
| 38 | P HMA SC SMA 9.5 F N80 (40605026) | TON | 7,023 | $115.24 | $132.00 | $140.00 | $145.00 |
| 39 | Protective coat (42001300) | SY | 8,975 | $0.01 | $0.01 | $0.01 | $0.20 |
| 40 | PCC driveway pavt 8 (42300400) | SY | 219 | $78.06 | $109.00 | $98.00 | $146.00 |
| 41 | PC conc sidewalk 5 (42400200) | SF | 1,125 | $9.22 | $11.50 | $12.22 | $10.15 |
| 42 | Detectable warnings (42400800) | SF | 90 | $44.11 | $30.00 | $27.00 | $43.50 |
| 43 | Drive pavement rem (44000200) | SY | 629 | $24.02 | $21.54 | $40.00 | $16.00 |
| 44 | Comb curb gutter rem (44000500) | LF | 15,804 | $8.38 | $7.50 | $8.00 | $9.00 |
| 45 | Sidewalk rem (44000600) | SF | 1,125 | $4.51 | $2.00 | $2.50 | $4.00 |
| 46 | Median removal (44003100) | SF | 49,523 | $2.02 | $4.00 | $2.80 | $4.50 |
| 47 | CL D patch T1 11 (44201773) | SY | 108 | $134.98 | $42.00 | $175.00 | $120.00 |
| 48 | CL D patch T2 11 (44201777) | SY | 860 | $112.65 | $42.00 | $175.00 | $119.00 |
| 49 | CL D patch T3 11 (44201781) | SY | 645 | $105.03 | $42.00 | $170.00 | $115.00 |
| 50 | CL D patch T4 11 (44201783) | SY | 538 | $99.09 | $42.00 | $170.00 | $113.00 |
| 51 | Comb CC&G TB6.12 (60603800) | LF | 6,780 | $31.67 | $33.00 | $35.00 | $44.00 |
| 52 | Comb CC&G TY B-6.24 (60605000) | LF | 12,645 | $41.14 | $36.00 | $34.50 | $52.00 |
| 53 | Conc median surf 4 (60618300) | SF | 22,251 | $8.24 | $6.00 | $6.40 | $8.15 |
| 54 | Conc med TSB6.12 (60619600) | SF | 3,930 | $22.77 | $22.50 | $21.50 | $22.75 |
| 55 | Non SPL waste disposl (66900200) | CY | 1,213 | $86.26 | $61.92 | $25.00 | $108.00 |
| 56 | Soil disposal analy (66900530) | EACH | 10 | $1,020.00 | $1,020.00 | $900.00 | $950.00 |
| 57 | Reg sub P-const plan (66901001) | LS | 1 | $6,900.00 | $6,900.00 | $2,000.00 | $7,500.00 |
| 58 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $500.00 | $900.00 | $565.00 |
| 59 | Reg sub mon (66901006) | CAL DAY | 20 | $715.00 | $715.00 | $450.00 | $850.00 |
| 60 | Mobilization (67100100) | LS | 1 | $252,393 | $283,000 | $287,000 | $190,000 |
| 61 | Traf cont-prot 701421 (70100310) | LS | 1 | $1.00 | $2,638.00 | $1.00 | $10,000 |
| 62 | Traf cont-prot 701422 (70100320) | LS | 1 | $1.00 | $2,638.00 | $1.00 | $10,000 |
| 63 | Traf cont-prot 701411 (70100420) | EACH | 4 | $1.00 | $750.00 | $1.00 | $10,000 |
| 64 | TR cont & prot 701606 (70102625) | LS | 1 | $9,000.00 | $2,638.00 | $1.00 | $10,000 |
| 65 | TR cont & prot 701601 (70102630) | LS | 1 | $9,000.00 | $390,641 | $89,000 | $10,000 |
| 66 | TR cont & prot 701602 (70102632) | LS | 1 | $1.00 | $2,638.00 | $1.00 | $10,000 |
| 67 | TR cont & prot 701611 (70102634) | LS | 1 | $1.00 | $2,638.00 | $1.00 | $10,000 |
| 68 | TR cont & prot 701701 (70102635) | LS | 1 | $9,000.00 | $2,638.00 | $1.00 | $20,000 |
| 69 | TR cont & prot 701801 (70102640) | LS | 1 | $8,500.00 | $2,638.00 | $1.00 | $30,000 |
| 70 | Night work zone light (70200100) | LS | 1 | $1,000.00 | $1.00 | $2,000.00 | $40,000 |
| 71 | Short term pavt mking (70300100) | LF | 18,582 | $0.15 | $1.00 | $0.99 | $3.00 |
| 72 | SHRT TRM pavt MK rem (70300150) | SF | 3,097 | $4.91 | $2.00 | $0.01 | $4.00 |
| 73 | Temp PVT MK LTR & sym paint (70300211) | SF | 1,858 | $1.50 | $1.75 | $0.01 | $2.00 |
| 74 | Temp PVT MK line 4 - paint (70300221) | LF | 25,334 | $0.27 | $0.35 | $0.01 | $0.45 |
| 75 | Temp PVT MK line 6 - paint (70300241) | LF | 6,740 | $0.40 | $0.53 | $0.01 | $0.60 |
| 76 | Temp PVT MK line 8 - paint (70300251) | LF | 1,464 | $0.55 | $0.70 | $0.01 | $0.80 |
| 77 | Temp PVT MK line 12 - paint (70300261) | LF | 799 | $0.85 | $1.06 | $0.01 | $1.20 |
| 78 | Temp PVT MK line 24 - paint (70300281) | LF | 752 | $1.50 | $1.60 | $0.01 | $1.75 |
| 79 | Temp PVT MK L4 T4 tape (70307120) | LF | 9,291 | $1.00 | $1.20 | $0.01 | $1.50 |
| 80 | THPL PVT MK LTR & sym (78000100) | SF | 1,858 | $5.20 | $5.20 | $5.25 | $6.00 |
| 81 | THPL PVT MK line 4 (78000200) | LF | 19,913 | $0.78 | $0.78 | $0.90 | $0.88 |
| 82 | THPL PVT MK line 6 (78000400) | LF | 6,740 | $1.20 | $1.20 | $1.35 | $1.35 |
| 83 | THPL PVT MK line 8 (78000500) | LF | 1,464 | $1.60 | $1.60 | $1.60 | $1.80 |
| 84 | THPL PVT MK line 12 (78000600) | LF | 799 | $2.50 | $2.50 | $2.26 | $3.00 |
| 85 | THPL PVT MK line 24 (78000650) | LF | 752 | $5.20 | $5.20 | $5.25 | $6.00 |
| 86 | Pref PL PM TD STD L4 (78004620) | LF | 5,421 | $4.25 | $4.25 | $5.30 | $4.90 |
| 87 | GRV RCSD PVT MRKG 5 (78011025) | LF | 5,421 | $0.60 | $0.60 | $0.50 | $0.85 |
| 88 | Raised refl pavt MKR (78100100) | EACH | 1,054 | $42.00 | $42.00 | $39.00 | $48.00 |
| 89 | Raised ref PVT MK rem (78300200) | EACH | 1,054 | $10.95 | $6.56 | $19.00 | $15.00 |
| 90 | Undrgrd C galvs 2 (81028200) | LF | 147 | $58.22 | $65.30 | $58.22 | $75.00 |
| 91 | HD handhole (81400200) | EACH | 2 | $5,892.91 | $4,634.50 | $5,892.91 | $5,300.00 |
| 92 | Main EX TR sig instal (85000200) | EACH | 1 | $4,345.88 | $3,500.00 | $4,345.88 | $4,000.00 |
| 93 | Elcbl C signal 14 2C (87301215) | LF | 464 | $5.69 | $3.56 | $5.69 | $4.25 |
| 94 | Elcbl C lead 14 1PR (87301305) | LF | 115 | $5.89 | $4.52 | $5.89 | $5.25 |
| 95 | Drill EX handhole (87900200) | EACH | 2 | $451.38 | $550.00 | $451.38 | $625.00 |
| 96 | Det loop T1 (88600100) | LF | 372 | $29.91 | $32.17 | $29.91 | $39.00 |
| 97 | Rem elcbl FR con (89502300) | LF | 464 | $5.16 | $1.50 | $5.16 | $2.50 |
| 98 | Rem & RE elcbl FR con (89502350) | LF | 92 | $5.16 | $2.65 | $5.16 | $3.00 |
| 99 | Remov EX TS equip (89502375) | EACH | 1 | $121.49 | $405.00 | $121.49 | $500.00 |
| 100 | Remov EX handhole (89502380) | EACH | 2 | $1,333.43 | $1,650.00 | $1,333.43 | $2,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.