IDOT contract 80B22 bid tabulation
Section 2025-2001-RS. Let by Illinois DOT on June 12, 2026, Cook, District 01. 4 bids received; low bid $7,389,202 by K-Five Construction Corporation.
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 129
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | K-Five Construction Corporation | $7,389,202 | Low |
| 2 | Plote Construction, Inc. | $7,931,346 | +7.0% |
| 3 | Builders Paving, LLC | $8,049,787 | +9.0% |
| 4 | Peter Baker & Son Co. | $8,622,774 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. K-Five Construction Corporation | 2. Plote Construction, Inc. | 3. Builders Paving, LLC | 4. Peter Baker & Son Co. |
|---|---|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $50,000 | $48,500 | $55,000 | $32,500 |
| 2 | Rem & rein bric paver (X0327611) | SF | 375 | $75.00 | $20.00 | $50.00 | $33.00 |
| 3 | Conn EX DRG structure (X1200160) | EACH | 1 | $850.00 | $1,200.00 | $850.00 | $850.00 |
| 4 | Ped signal post 10 FT (X1400367) | EACH | 2 | $1,444.38 | $1,444.38 | $1,750.00 | $1,760.00 |
| 5 | Ped signal post 5 FT (X1400378) | EACH | 34 | $1,182.47 | $1,182.47 | $1,350.00 | $1,385.00 |
| 6 | Rebld EX HD handhole (X1400450) | EACH | 3 | $2,864.06 | $2,864.06 | $2,865.00 | $4,100.00 |
| 7 | Detectable warn SPL (X4240800) | SF | 412 | $45.00 | $40.00 | $40.00 | $40.00 |
| 8 | CC&G RMVL repl < = 10 (X4400501) | LF | 1,078 | $40.00 | $45.00 | $50.00 | $42.00 |
| 9 | CC&G RMVL repl > 10FT (X4400503) | LF | 9,886 | $39.00 | $42.00 | $45.00 | $40.00 |
| 10 | SS cleaned 12 (X5537800) | LF | 5,730 | $2.00 | $1.75 | $2.00 | $1.50 |
| 11 | SS cleaned 18 (X5538000) | LF | 200 | $2.00 | $2.00 | $2.00 | $1.50 |
| 12 | SS cleaned 24 (X5538200) | LF | 200 | $2.00 | $2.00 | $2.00 | $1.50 |
| 13 | San man reconst (X6026051) | EACH | 1 | $1,650.00 | $1,150.00 | $1,650.00 | $1,450.00 |
| 14 | FR & lids adjust SPL (X6030310) | EACH | 309 | $1,050.00 | $1,150.00 | $1,150.00 | $1,125.00 |
| 15 | Corrugated med rem (X6060500) | SF | 3,365 | $3.00 | $2.00 | $2.00 | $2.00 |
| 16 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $3,500.00 | $4,500.00 | $5,500.00 | $2,500.00 |
| 17 | Traf cont & prot SPL (X7010216) | LS | 1 | $504,200 | $52,000 | $192,000 | $98,500 |
| 18 | TR C-prot expressways (X7011015) | LS | 1 | $1.00 | $2,400.00 | $30,000 | $14,100 |
| 19 | Temp info signing (X7200061) | SF | 126 | $18.00 | $18.00 | $25.00 | $18.00 |
| 20 | Rebld EX DBL handhole (X8140238) | EACH | 1 | $3,933.31 | $3,933.31 | $3,935.00 | $5,245.00 |
| 21 | Accessible ped signal (X8760200) | EACH | 75 | $1,763.60 | $1,763.60 | $1,865.00 | $1,825.00 |
| 22 | Conc FDN TY A 12D (X8780012) | LF | 144 | $334.79 | $334.79 | $335.00 | $330.00 |
| 23 | Det loop repl (X8860105) | LF | 963 | $25.60 | $25.60 | $28.00 | $35.50 |
| 24 | Temp TR signal timing (X8900104) | EACH | 2 | $864.00 | $864.00 | $864.00 | $330.00 |
| 25 | Drainage STR cleaned (Z0018500) | EACH | 382 | $350.00 | $315.00 | $350.00 | $340.00 |
| 26 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 10 | $576.00 | $576.00 | $576.00 | $550.00 |
| 27 | RR prot liability ins (Z0048665) | LS | 1 | $2,890.00 | $5,000.00 | $20,000 | $49,800 |
| 28 | SS 1 wat MN 12 (Z0056648) | LF | 27 | $350.00 | $120.00 | $350.00 | $300.00 |
| 29 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 | $0.80 | $0.80 |
| 30 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 | $15.00 |
| 31 | Earth excavation (20200100) | CY | 191 | $50.00 | $45.00 | $45.00 | $40.00 |
| 32 | Rem & disp uns matl (20201200) | CY | 95 | $75.00 | $100.00 | $120.00 | $150.00 |
| 33 | Trench backfill (20800150) | CY | 32 | $23.00 | $85.00 | $23.00 | $23.00 |
| 34 | Geotech fab F/GR stab (21001000) | SY | 284 | $1.10 | $1.00 | $5.00 | $5.00 |
| 35 | Topsoil F & P 4 (21101615) | SY | 149 | $27.00 | $27.00 | $25.00 | $27.00 |
| 36 | Sodding salt tolerant (25200110) | SY | 149 | $52.00 | $52.00 | $50.00 | $52.00 |
| 37 | Supple watering (25200200) | UNIT | 6 | $40.00 | $40.00 | $100.00 | $40.00 |
| 38 | Inlet filters (28000510) | EACH | 382 | $165.00 | $150.00 | $165.00 | $150.00 |
| 39 | Agg subgrade improve (30300001) | CY | 95 | $100.00 | $100.00 | $120.00 | $130.00 |
| 40 | Sub gran mat B 4 (31101200) | SY | 6,157 | $7.00 | $3.75 | $3.75 | $3.15 |
| 41 | Bit matls tack CT (40600290) | LB | 61,684 | $0.01 | $0.01 | $1.35 | $1.80 |
| 42 | Long joint sealant (40600370) | LF | 80,882 | $2.59 | $3.00 | $3.00 | $3.50 |
| 43 | Mix CR JTS flangewys (40600400) | TON | 213 | $50.00 | $85.00 | $650.00 | $200.00 |
| 44 | HMA surf rem butt JT (40600982) | SY | 1,176 | $6.00 | $20.00 | $5.00 | $1.00 |
| 45 | HMA repl over patch (40601005) | TON | 606 | $65.00 | $450.00 | $50.00 | $150.00 |
| 46 | P HMA SC SMA 9.5 F N80 (40605026) | TON | 13,432 | $150.00 | $160.00 | $128.00 | $156.00 |
| 47 | Protective coat (42001300) | SY | 7,400 | $0.01 | $0.75 | $0.80 | $0.50 |
| 48 | PCC driveway pavt 8 (42300400) | SY | 33 | $100.00 | $115.00 | $115.00 | $95.00 |
| 49 | PC conc sidewalk 5 (42400200) | SF | 47,996 | $8.25 | $11.00 | $12.00 | $10.25 |
| 50 | PC conc sidewalk 8 (42400410) | SF | 87 | $9.00 | $11.50 | $15.00 | $11.00 |
| 51 | HMA surf rem 1 3/4 (44000156) | SY | 137,059 | $6.00 | $4.10 | $8.50 | $5.10 |
| 52 | Drive pavement rem (44000200) | SY | 43 | $20.00 | $15.00 | $15.00 | $15.00 |
| 53 | Comb curb gutter rem (44000500) | LF | 2,421 | $8.00 | $9.00 | $9.00 | $9.00 |
| 54 | Sidewalk rem (44000600) | SF | 75,035 | $2.00 | $1.35 | $1.35 | $1.25 |
| 55 | HMA RM OV patch 3 (44002212) | SY | 6,177 | $0.01 | $0.50 | $1.00 | $6.00 |
| 56 | Median removal (44003100) | SF | 7,037 | $2.00 | $3.00 | $3.00 | $2.25 |
| 57 | CL D patch T2 10 (44201765) | SY | 2,059 | $45.00 | $155.00 | $45.00 | $125.00 |
| 58 | CL D patch T3 10 (44201769) | SY | 2,059 | $45.00 | $155.00 | $20.00 | $125.00 |
| 59 | CL D patch T4 10 (44201771) | SY | 2,059 | $45.00 | $155.00 | $10.00 | $125.00 |
| 60 | Saw cuts (44213200) | LF | 3,046 | $2.00 | $2.00 | $3.00 | $2.00 |
| 61 | Storm sew CL A 1 12 (550A0050) | LF | 8 | $335.00 | $135.00 | $350.00 | $315.00 |
| 62 | Pipe underdr T 1 6 (60108106) | LF | 106 | $65.00 | $32.00 | $65.00 | $65.00 |
| 63 | CB TA 4 dia T1F OL (60200105) | EACH | 1 | $6,950.00 | $3,200.00 | $6,950.00 | $6,500.00 |
| 64 | Man TA 4 dia T1F CL (60218400) | EACH | 2 | $14,255 | $5,075.00 | $14,500 | $14,255 |
| 65 | CB adjust (60250200) | EACH | 15 | $450.00 | $450.00 | $450.00 | $450.00 |
| 66 | CB reconst (60252800) | EACH | 15 | $1,100.00 | $925.00 | $1,100.00 | $1,000.00 |
| 67 | CB cleaned (60255410) | EACH | 4 | $350.00 | $300.00 | $350.00 | $350.00 |
| 68 | Man adjust (60255500) | EACH | 10 | $550.00 | $450.00 | $550.00 | $550.00 |
| 69 | Man reconst (60257900) | EACH | 10 | $1,200.00 | $1,150.00 | $1,200.00 | $1,100.00 |
| 70 | Inlets reconst (60262700) | EACH | 10 | $880.00 | $1,150.00 | $880.00 | $800.00 |
| 71 | FR & lids T1 OL (60406000) | EACH | 10 | $450.00 | $450.00 | $450.00 | $450.00 |
| 72 | FR & lids T1 ADA compl OL (60406001) | EACH | 3 | $450.00 | $475.00 | $450.00 | $450.00 |
| 73 | FR & lids T1 CL (60406100) | EACH | 10 | $450.00 | $450.00 | $450.00 | $450.00 |
| 74 | Conc med TSB6.12 (60619600) | SF | 7,038 | $17.00 | $15.75 | $16.00 | $15.00 |
| 75 | Corrugated med (60624600) | SF | 3,312 | $9.00 | $13.00 | $14.00 | $12.50 |
| 76 | Non SPL waste disposl (66900200) | CY | 191 | $132.15 | $95.00 | $185.00 | $165.00 |
| 77 | Soil disposal analy (66900530) | EACH | 1 | $1,450.00 | $1,785.00 | $1,785.00 | $1,785.00 |
| 78 | Reg sub P-const plan (66901001) | LS | 1 | $3,100.00 | $5,600.00 | $5,600.00 | $5,600.00 |
| 79 | Reg sub F con report (66901003) | LS | 1 | $1,200.00 | $500.00 | $500.00 | $500.00 |
| 80 | Reg sub mon (66901006) | CAL DAY | 90 | $680.00 | $655.00 | $655.00 | $655.00 |
| 81 | Mobilization (67100100) | LS | 1 | $400,000 | $475,000 | $628,000 | $697,580 |
| 82 | Traf cont-prot 701411 (70100420) | EACH | 4 | $500.00 | $1.00 | $1,250.00 | $500.00 |
| 83 | TR cont & prot 701606 (70102625) | LS | 1 | $1.00 | $1.00 | $230,000 | $236,790 |
| 84 | TR cont & prot 701601 (70102630) | LS | 1 | $1.00 | $1.00 | $1.00 | $100.00 |
| 85 | TR cont & prot 701602 (70102632) | LS | 1 | $1.00 | $1.00 | $1.00 | $85,000 |
| 86 | TR cont & prot 701611 (70102634) | LS | 1 | $1.00 | $1.00 | $1.00 | $100.00 |
| 87 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 | $1.00 | $1.00 | $100.00 |
| 88 | TR cont & prot 701801 (70102640) | LS | 1 | $1.00 | $1.00 | $1.00 | $100.00 |
| 89 | TR cont surveillance (70103815) | CAL DAY | 90 | $250.00 | $400.00 | $300.00 | $350.00 |
| 90 | Night work zone light (70200100) | LS | 1 | $1,000.00 | $10,000 | $45,000 | $12,000 |
| 91 | Short term pavt mking (70300100) | LF | 20,237 | $0.01 | $0.01 | $0.01 | $0.40 |
| 92 | SHRT TRM pavt MK rem (70300150) | SF | 3,376 | $0.01 | $4.70 | $0.01 | $0.50 |
| 93 | Temp PVT MK LTR & sym paint (70300211) | SF | 2,232 | $4.20 | $0.01 | $0.01 | $4.20 |
| 94 | Temp PVT MK line 4 - paint (70300221) | LF | 52,281 | $0.35 | $0.01 | $0.01 | $0.35 |
| 95 | Temp PVT MK line 6 - paint (70300241) | LF | 10,627 | $0.52 | $0.01 | $0.01 | $0.55 |
| 96 | Temp PVT MK line 8 - paint (70300251) | LF | 518 | $1.05 | $0.01 | $0.01 | $1.05 |
| 97 | Temp PVT MK line 12 - paint (70300261) | LF | 6,225 | $2.10 | $0.01 | $0.01 | $2.10 |
| 98 | Temp PVT MK line 24 - paint (70300281) | LF | 2,146 | $4.20 | $0.01 | $0.01 | $4.20 |
| 99 | Temp PVT MK L4 T4 tape (70307120) | LF | 10,127 | $1.40 | $1.65 | $0.01 | $1.40 |
| 100 | Sign panel T1 (72000100) | SF | 7 | $65.00 | $65.00 | $37.50 | $65.00 |
| 101 | Teles STL sin support (72800100) | LF | 15 | $35.00 | $4.85 | $25.00 | $35.00 |
| 102 | THPL PVT MK LTR & sym (78000100) | SF | 2,232 | $4.85 | $4.85 | $4.85 | $4.85 |
| 103 | THPL PVT MK line 4 (78000200) | LF | 42,669 | $0.75 | $0.75 | $0.80 | $0.75 |
| 104 | THPL PVT MK line 6 (78000400) | LF | 10,627 | $0.97 | $0.97 | $1.00 | $1.00 |
| 105 | THPL PVT MK line 8 (78000500) | LF | 518 | $1.40 | $1.40 | $1.40 | $1.40 |
| 106 | THPL PVT MK line 12 (78000600) | LF | 6,225 | $2.80 | $2.80 | $2.80 | $2.80 |
| 107 | THPL PVT MK line 24 (78000650) | LF | 2,146 | $4.85 | $4.85 | $4.85 | $4.85 |
| 108 | Pref PL PM TD STD L4 (78004620) | LF | 9,612 | $5.20 | $5.20 | $5.20 | $5.20 |
| 109 | Pref THPL PM LTR-sym (78006100) | SF | 587 | $14.50 | $14.50 | $14.50 | $14.50 |
| 110 | GRV RCSD PVT MRKG 5 (78011025) | LF | 9,612 | $0.50 | $0.50 | $0.50 | $0.50 |
| 111 | Raised refl pavt MKR (78100100) | EACH | 1,785 | $36.00 | $36.00 | $40.00 | $36.00 |
| 112 | Raised ref PVT MK rem (78300200) | EACH | 1,785 | $5.00 | $11.00 | $5.00 | $17.00 |
| 113 | Undrgrd C galvs 2 (81028200) | LF | 507 | $85.98 | $85.98 | $86.00 | $43.45 |
| 114 | Undrgrd C galvs 3 (81028220) | LF | 74 | $98.61 | $98.61 | $100.00 | $89.50 |
| 115 | Main EX TR sig instal (85000200) | EACH | 10 | $1,489.07 | $1,489.07 | $2,000.00 | $6,755.00 |
| 116 | Elcbl C signal 14 2C (87301215) | LF | 10,159 | $3.73 | $3.73 | $3.75 | $3.20 |
| 117 | Elcbl C signal 14 3C (87301225) | LF | 122 | $3.99 | $3.99 | $4.00 | $3.40 |
| 118 | Elcbl C signal 14 5C (87301245) | LF | 1,703 | $4.44 | $4.44 | $4.50 | $3.85 |
| 119 | Elcbl C lead 14 1PR (87301305) | LF | 3,140 | $3.96 | $3.96 | $4.00 | $3.35 |
| 120 | Elcbl C egrdc 6 1C (87301900) | LF | 697 | $4.73 | $4.73 | $4.75 | $5.00 |
| 121 | TS post galvs 16 (87502500) | EACH | 5 | $2,520.37 | $2,520.37 | $2,650.00 | $2,905.00 |
| 122 | Conc FDN TY A (87800100) | LF | 20 | $320.91 | $320.91 | $325.00 | $355.00 |
| 123 | Drill EX handhole (87900200) | EACH | 36 | $435.32 | $435.32 | $440.00 | $800.00 |
| 124 | SH LED 1F 3S BM (88030050) | EACH | 11 | $775.64 | $775.64 | $780.00 | $1,285.00 |
| 125 | Ped SH LED 1F BM CDT (88102717) | EACH | 2 | $659.48 | $659.48 | $660.00 | $875.00 |
| 126 | Det loop T1 (88600100) | LF | 6,684 | $25.60 | $25.60 | $28.00 | $35.45 |
| 127 | Mod EX contr (89502200) | EACH | 1 | $1,198.64 | $1,198.64 | $1,200.00 | $1,065.00 |
| 128 | Remov EX TS equip (89502375) | EACH | 4 | $162.31 | $162.31 | $165.00 | $1,540.00 |
| 129 | Rebuild EX handhole (89502376) | EACH | 8 | $2,217.70 | $2,217.70 | $2,400.00 | $3,980.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.