IDOT contract 80C45 bid tabulation
Section 2025-2102-RS. Let by Illinois DOT on June 12, 2026, Mchenry, District 01. 4 bids received; low bid $1,605,106 by Peter Baker & Son Co..
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 84
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Peter Baker & Son Co. | $1,605,106 | Low |
| 2 | Curran Contracting Company | $1,622,323 | +1.0% |
| 3 | Builders Paving, LLC | $1,701,980 | +6.0% |
| 4 | Plote Construction, Inc. | $1,741,374 | +8.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Peter Baker & Son Co. | 2. Curran Contracting Company | 3. Builders Paving, LLC | 4. Plote Construction, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Grading & shap SHLDRS (X2020110) | UNIT | 157 | $50.00 | $70.00 | $100.00 | $125.00 |
| 2 | CC&G RMVL repl < = 10 (X4400501) | LF | 15 | $222.00 | $222.00 | $100.00 | $200.00 |
| 3 | CC&G RMVL repl > 10FT (X4400503) | LF | 70 | $222.00 | $222.00 | $100.00 | $200.00 |
| 4 | SS cleaned 12 (X5537800) | LF | 270 | $1.00 | $15.00 | $1.00 | $1.00 |
| 5 | Centerln rum strip 16 (X6420114) | LF | 5,424 | $2.91 | $2.00 | $1.50 | $1.70 |
| 6 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $2,000.00 | $2,750.00 | $4,000.00 | $4,500.00 |
| 7 | Temp info signing (X7200061) | SF | 104 | $17.00 | $15.00 | $17.00 | $17.00 |
| 8 | HS THPL PM LN 4 (X7800815) | LF | 10,848 | $0.55 | $0.55 | $0.55 | $0.55 |
| 9 | Accessible ped signal (X8760200) | EACH | 3 | $2,150.00 | $3,403.23 | $3,500.00 | $3,403.23 |
| 10 | Drainage STR cleaned (Z0018500) | EACH | 18 | $315.00 | $500.00 | $320.00 | $315.00 |
| 11 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 1 | $1,150.00 | $864.00 | $865.00 | $864.00 |
| 12 | Topsoil F & P 4 (21101615) | SY | 8 | $100.00 | $100.00 | $50.00 | $40.00 |
| 13 | Grading & shap ditch (21400100) | LF | 1,200 | $19.30 | $18.00 | $28.00 | $9.00 |
| 14 | Sodding salt tolerant (25200110) | SY | 8 | $150.00 | $150.00 | $50.00 | $40.00 |
| 15 | Supple watering (25200200) | UNIT | 1 | $0.10 | $0.10 | $200.00 | $250.00 |
| 16 | Bit matls tack CT (40600290) | LB | 29,755 | $0.01 | $0.50 | $0.01 | $0.01 |
| 17 | Long joint sealant (40600370) | LF | 10,892 | $3.30 | $2.90 | $3.00 | $3.25 |
| 18 | Mix CR JTS flangewys (40600400) | TON | 69 | $120.00 | $200.00 | $300.00 | $95.00 |
| 19 | HMA surf rem butt JT (40600982) | SY | 191 | $1.00 | $24.00 | $30.00 | $45.00 |
| 20 | P HMA BC IL-4.75 N50 (40603200) | TON | 2,264 | $127.00 | $125.00 | $115.00 | $100.00 |
| 21 | HMA SC IL-9.5 D N50 (40604060) | TON | 369 | $102.00 | $92.00 | $95.00 | $120.00 |
| 22 | HMA SC IL-9.5 D N70 (40604062) | TON | 3,458 | $97.00 | $102.00 | $95.00 | $100.00 |
| 23 | Protective coat (42001300) | SY | 35 | $0.01 | $0.01 | $0.10 | $1.00 |
| 24 | HMA surf rem 1/2 (44000151) | SY | 4,388 | $2.00 | $1.70 | $3.00 | $2.30 |
| 25 | HMA surf rem 1 1/2 (44000155) | SY | 3,496 | $3.20 | $2.35 | $8.00 | $3.85 |
| 26 | HMA surf rem 2 1/2 (44000159) | SY | 37,659 | $3.95 | $3.50 | $5.00 | $2.90 |
| 27 | CL D patch T2 10 (44201765) | SY | 27 | $70.00 | $200.00 | $110.00 | $139.00 |
| 28 | CL D patch T3 10 (44201769) | SY | 40 | $70.00 | $160.00 | $110.00 | $139.00 |
| 29 | CL D patch T4 10 (44201771) | SY | 66 | $70.00 | $120.00 | $110.00 | $139.00 |
| 30 | CL D patch T2 19 (44201875) | SY | 247 | $85.00 | $275.00 | $110.00 | $170.00 |
| 31 | CL D patch T3 19 (44201879) | SY | 371 | $85.00 | $215.00 | $110.00 | $170.00 |
| 32 | CL D patch T4 19 (44201881) | SY | 618 | $85.00 | $150.00 | $110.00 | $170.00 |
| 33 | Agg wedge SHLD type B (48102100) | TON | 313 | $78.05 | $60.00 | $75.00 | $75.00 |
| 34 | CB adjust (60250200) | EACH | 5 | $1,180.00 | $750.00 | $1,250.00 | $1,250.00 |
| 35 | Conc median surf 6 (60618320) | SF | 70 | $30.00 | $30.00 | $15.00 | $60.00 |
| 36 | Box cul to BE cleaned (60905305) | LF | 72 | $50.00 | $127.00 | $50.00 | $50.00 |
| 37 | Pipe culv cleaned 12 (60920012) | LF | 718 | $4.00 | $12.00 | $4.00 | $4.00 |
| 38 | Pipe culv cleaned 15 (60920015) | LF | 374 | $5.00 | $17.30 | $5.00 | $5.00 |
| 39 | Pipe culv cleaned 24 (60920024) | LF | 300 | $7.00 | $26.90 | $7.00 | $7.00 |
| 40 | SPBGR TY A 6FT posts (63000001) | LF | 24 | $45.00 | $45.00 | $45.00 | $45.00 |
| 41 | Traf bar term T2 (63100045) | EACH | 2 | $3,200.00 | $3,200.00 | $3,200.00 | $3,200.00 |
| 42 | Guardrail remov (63200310) | LF | 24 | $10.00 | $10.00 | $10.00 | $10.00 |
| 43 | Shoulder rum strip 8 (64200108) | LF | 13,135 | $1.08 | $1.00 | $1.50 | $1.10 |
| 44 | Non SPL waste disposl (66900200) | CY | 60 | $131.00 | $100.00 | $150.00 | $160.00 |
| 45 | Soil disposal analy (66900530) | EACH | 1 | $1,560.00 | $900.00 | $1,560.00 | $1,560.00 |
| 46 | Reg sub P-const plan (66901001) | LS | 1 | $3,400.00 | $5,500.00 | $3,400.00 | $3,400.00 |
| 47 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $500.00 | $500.00 | $500.00 |
| 48 | Reg sub mon (66901006) | CAL DAY | 5 | $715.00 | $750.00 | $715.00 | $935.00 |
| 49 | Mobilization (67100100) | LS | 1 | $100,122 | $81,500 | $234,999 | $104,000 |
| 50 | Traf cont-prot 701421 (70100310) | LS | 1 | $104,181 | $5,000.00 | $5,000.00 | $80,000 |
| 51 | TR cont & prot 701501 (70102620) | LS | 1 | $5,000.00 | $10,000 | $5,000.00 | $77,000 |
| 52 | TR cont & prot 701601 (70102630) | LS | 1 | $7,000.00 | $5,000.00 | $5,000.00 | $77,000 |
| 53 | TR cont & prot 701701 (70102635) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 54 | TR cont & prot 701801 (70102640) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 55 | Short term pavt mking (70300100) | LF | 8,223 | $0.01 | $0.25 | $1.75 | $0.70 |
| 56 | SHRT TRM pavt MK rem (70300150) | SF | 371 | $5.25 | $7.50 | $0.01 | $5.50 |
| 57 | Temp PVT MK LTR & sym paint (70300211) | SF | 874 | $0.01 | $0.50 | $0.01 | $0.01 |
| 58 | Temp PVT MK line 4 - paint (70300221) | LF | 44,546 | $0.01 | $0.10 | $0.01 | $0.01 |
| 59 | Temp PVT MK line 6 - paint (70300241) | LF | 6,676 | $0.01 | $0.10 | $0.01 | $0.01 |
| 60 | Temp PVT MK line 8 - paint (70300251) | LF | 3,946 | $0.01 | $0.10 | $0.01 | $0.01 |
| 61 | Temp PVT MK line 12 - paint (70300261) | LF | 3,088 | $0.01 | $0.10 | $0.01 | $0.01 |
| 62 | Temp PVT MK line 24 - paint (70300281) | LF | 742 | $0.01 | $0.10 | $0.01 | $0.01 |
| 63 | Temp PVT MK L4 T4 tape (70307120) | LF | 1,122 | $1.11 | $0.10 | $1.00 | $1.60 |
| 64 | Sign panel T1 (72000100) | SF | 18 | $60.00 | $100.00 | $75.00 | $50.00 |
| 65 | Teles STL sin support (72800100) | LF | 45 | $25.00 | $50.00 | $30.00 | $30.00 |
| 66 | THPL PVT MK LTR & sym (78000100) | SF | 437 | $6.00 | $6.00 | $6.00 | $6.00 |
| 67 | THPL PVT MK line 4 (78000200) | LF | 22,273 | $0.90 | $0.90 | $0.90 | $0.90 |
| 68 | THPL PVT MK line 6 (78000400) | LF | 3,338 | $0.95 | $0.95 | $0.95 | $0.95 |
| 69 | THPL PVT MK line 8 (78000500) | LF | 1,973 | $2.00 | $2.00 | $2.00 | $2.00 |
| 70 | THPL PVT MK line 12 (78000600) | LF | 1,544 | $3.00 | $3.00 | $3.00 | $3.00 |
| 71 | THPL PVT MK line 24 (78000650) | LF | 371 | $6.00 | $6.00 | $6.00 | $6.00 |
| 72 | Pref PL PM TD STD L 6 (78004630) | LF | 2,157 | $8.90 | $8.90 | $8.90 | $8.90 |
| 73 | Mod ureth PM line 4 (78009004) | LF | 11,000 | $0.75 | $0.75 | $0.75 | $0.75 |
| 74 | Mod ureth PM line 24 (78009024) | LF | 26 | $15.00 | $15.00 | $15.00 | $15.00 |
| 75 | GRV RCSD PVT MRKG 7 (78011035) | LF | 2,157 | $2.20 | $2.20 | $2.20 | $2.20 |
| 76 | Raised refl pavt MKR (78100100) | EACH | 227 | $33.54 | $33.54 | $35.00 | $33.54 |
| 77 | Grdrail ref type A (78200005) | EACH | 4 | $25.00 | $25.00 | $25.00 | $25.00 |
| 78 | Raised ref PVT MK rem (78300200) | EACH | 227 | $34.00 | $13.50 | $20.00 | $12.00 |
| 79 | Main EX TR sig instal (85000200) | EACH | 2 | $9,500.00 | $2,377.08 | $2,500.00 | $2,377.08 |
| 80 | TS backplate (88200100) | EACH | 1 | $1,750.00 | $377.32 | $400.00 | $377.32 |
| 81 | TS backplate louvered (88200110) | EACH | 1 | $1,750.00 | $379.06 | $400.00 | $379.06 |
| 82 | Inductive loop detect (88500100) | EACH | 1 | $1,485.00 | $456.10 | $455.00 | $456.10 |
| 83 | Det loop T1 (88600100) | LF | 2,203 | $40.00 | $23.55 | $24.00 | $23.55 |
| 84 | Remov EX TS equip (89502375) | EACH | 2 | $480.00 | $68.55 | $70.00 | $68.55 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.