IDOT contract 61L48 bid tabulation

Huntley, section 20-00050-00-PV. Let by Illinois DOT on April 24, 2026, Kane, District 01. 2 bids received; low bid $12,274,333 by William Charles Construction Company, LLC.

Owner
Illinois DOT
Letting
24 APR 2026
Pay items
214
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1William Charles Construction Company, LLC$12,274,333Low
2Plote Construction, Inc.$13,151,363+7.0%
IDOT contract 61L48: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. William Charles Construction Company, LLC2. Plote Construction, Inc.
1T-acerx frem AM 2-1/2 (A2000086)EACH11$640.48$590.00
2T-betul NG HRT CL 12' (A2002476)EACH9$434.22$400.00
3T-ginkgo bil PS 2-1/2 (A2004520)EACH6$939.01$865.00
4T-quer warei RP 2-1/2 (A2007170)EACH6$618.77$570.00
5E-junip virg can 5' (D2001660)EACH43$542.78$500.00
6E-picea abies 5' (D2001760)EACH3$542.78$500.00
7E-picea omorika 5' (D2002060)EACH6$542.78$500.00
8E-picea pungens 6' (D2002172)EACH9$651.33$600.00
9E-pinus strobus 6' (D2002972)EACH5$651.33$600.00
10E-thuja occ tec 6' (D2003872)EACH27$515.64$475.00
11Weed contr pre-EM GRN (K0029634)LB3$21.71$20.00
12Conc truck washout (XX006821)LS1$5,427.79$7,500.00
13Light unit A complete (XX007295)EACH49$7,671.61$7,020.00
14Light unit B complete (XX007296)EACH1$8,327.31$7,620.00
15Con G 3 galvs (XX007711)LF75$153.00$140.00
16Valve special (XX009725)EACH1$21,000$18,440
17Luminaire replacement SPL (X1400403)EACH1$1,639.23$1,500.00
18Selective clearing (X2010516)UNIT25$868.45$1,200.00
19Trench back watermain (X2080252)CY300$0.01$62.00
20Agg surf cse B 6 (X4020500)SY60$117.33$31.00
21Temp access- priv ent (X4021000)EACH5$439.87$700.00
22Temp access- com ent (X4022000)EACH9$942.49$770.00
23Temp access- road (X4023000)EACH3$907.00$750.00
24PCC driveway PVT 8 SP (X4230800)SY905$124.64$123.00
25Pavement patching SPL (X4420201)SY1,768$64.56$75.00
26Temporary patching (X4420210)SY1,768$0.01$13.00
27Agg column GRND imprv (X5020100)LS1$265,419$320,000
28Dewatering (X5021507)LS1$225,000$37,117
29Remov EX flar end sec (X5427602)EACH8$477.49$380.00
30Pro SS conn to EX man (X5510011)EACH2$4,226.06$3,770.00
31D I WTR MN fittings (X5610004)LB2,110$14.32$15.00
32Plug water main 12 (X5610649)EACH4$3,069.72$3,500.00
33Water main remov 10 (X5610710)LF55$105.91$106.00
34Water main remov 12 (X5610712)LF100$117.35$53.00
35Conn to EX W main 10 (X5630710)EACH13$2,836.80$5,780.00
36Conn to EX W main 12 (X5630712)EACH1$3,713.40$6,980.00
37Memb WTRPRF sys B STR (X5810103)SY329$61.94$39.73
38Pro man/CB con OV SS (X6025604)EACH4$2,969.61$7,740.00
39VV removed (X6026622)EACH1$1,953.26$480.00
40Engrs FLD ofc TY A D1 (X6700407)CAL MO24$3,350.00$6,000.00
41Traf cont & prot SPL (X7010216)LS1$108,556$185,000
42Temp info signing (X7200061)SF51$18.45$17.00
43Maint lighting systm (X8000003)CAL MO12$546.41$500.00
44Exp & rel EX unit DCT (X8161000)LF20$43.71$40.00
45Light pole FDN 24D OS (X8360215)LF98$273.21$250.00
46Det loop repl (X8860105)LF233$41.53$38.00
47Temp TR signal timing (X8900104)EACH5$764.98$700.00
48Construction layout (Z0013798)LS1$108,951$95,900
49Dust control watering (Z0019600)UNIT120$182.23$0.01
50RR prot liability ins (Z0048665)LS1$5,880.00$15,000
51SS 1 wat MN 12 (Z0056648)LF201$200.18$135.00
52SS 1 wat MN 15 (Z0056650)LF103$249.35$173.00
53SS 2 wat MN 12 (Z0056668)LF28$184.91$136.00
54SS 2 wat MN 15 (Z0056669)LF69$237.75$173.00
55SS 2 wat MN 18 (Z0056670)LF50$322.05$191.00
56Temp pavement (Z0062456)SY8,800$39.63$37.00
57Trainees (Z0076600)HR500$0.80$0.80
58Trainees TPG (Z0076604)HR500$15.00$15.00
59Tree remov 6-15 (20100110)UNIT103$37.99$35.00
60Tree remov over 15 (20100210)UNIT50$59.71$55.00
61Tree remov acres (20100500)ACRE1.25$11,941$11,000
62Earth excavation (20200100)CY18,070$34.50$37.00
63Rem & disp uns matl (20201200)CY12,435$20.53$32.00
64Furnished excavation (20400800)CY7,995$0.01$30.00
65Porous gran embank (20700220)CY1,165$68.75$93.75
66Trench backfill (20800150)CY1,651$0.01$68.00
67Geotech fab F/GR stab (21001000)SY16,934$2.09$7.25
68Topsoil exc & plac (21101505)CY2,820$36.50$42.00
69Explor trench 84 (21301084)LF100$50.80$89.00
70Seeding CL 1A (25000110)ACRE9$2,496.78$2,300.00
71Seeding CL 4B (25000314)ACRE0.50$5,427.79$5,000.00
72Seeding CL 7 (25000350)ACRE8.50$325.67$300.00
73Nitrogen fert nutr (25000400)LB771$1.09$1.00
74Potassium fert nutr (25000600)LB771$1.09$1.00
75Erosion contr blanket (25100630)SY42,641$1.47$1.35
76Supple watering (25200200)UNIT36$1.09$1.00
77Temp ditch checks (28000305)LF60$8.68$8.00
78Perimeter eros bar (28000400)LF3,682$2.71$2.50
79Inlet filters (28000510)EACH124$162.83$150.00
80Temp eros contr blank (28001100)SY41,033$0.54$0.50
81Stone riprap CL A3 (28100105)SY87$52.21$125.00
82Stone riprap CL A4 (28100107)SY205$104.93$237.89
83Filter fabric (28200200)SY205$1.65$27.49
84Articul block rev mat (28500400)SY31$759.89$457.47
85Agg subgrade improve (30300001)CY17,146$55.58$35.00
86Agg subgrade impr 12 (30300112)SY8,749$28.04$15.00
87Agg base cse B 6 (35101800)SY30,534$10.41$12.00
88Agg base cse B 8 (35102000)SY219$16.39$37.00
89HMA base cse 4 (35501300)SY384$31.46$49.00
90Bit matls PR CT (40600275)LB65,802$0.01$0.01
91Bit matls tack CT (40600290)LB22,643$0.01$0.01
92Long joint sealant (40600370)LF27,065$3.45$3.91
93HMA surf rem butt JT (40600982)SY159$14.22$10.00
94HMA BC IL-19.0 N50 (40603080)TON671$93.01$130.00
95P HMA BC IL-4.75 N50 (40603200)TON337$152.10$150.00
96HMA SC IL-9.5 D N50 (40604060)TON434$102.86$180.00
97HMA SC IL-9.5 D N70 (40604062)TON673$103.95$97.00
98HMA pavt FD 11 1/2 (40701911)SY24,144$52.52$67.00
99Protective coat (42001300)SY3,918$2.06$0.01
100PC conc sidewalk 5 (42400200)SF5,566$12.00$13.00
101Detectable warnings (42400800)SF572$34.24$32.00
102Pavement rem (44000100)SY27,133$8.82$9.75
103HMA surf rem 2 1/4 (44000158)SY8,009$4.16$3.70
104Drive pavement rem (44000200)SY998$10.84$26.00
105Comb curb gutter rem (44000500)LF772$5.10$7.00
106Rem exist struct (50100100)EACH1$36,162$26,863
107Conc struct (50300225)CY18$3,354.82$1,382.32
108Stud shear connectors (50500505)EACH86$24.53$93.16
109Reinf bars, epoxy CTD (50800205)LB2,100$5.57$3.96
110Name plates (51500100)EACH1$1,488.51$2,590.00
111Temp soil reten systm (52200020)SF1,407$80.00$123.77
112Fur soldier piles HP (52200100)LF324$161.14$313.00
113Drive soldier piles (52200150)LF324$114.85$15.00
114Untreated timber lag (52200250)SF329$53.42$115.00
115Box cul end sec C1 (54001001)EACH2$35,094$32,710
116Box cul end sec C2 (54001002)EACH2$77,266$29,871
117PCBC 10X7 (54011007)LF273$1,480.48$2,742.88
118PCBC 12X6 (54011206)LF84$1,994.44$2,839.30
119PRC flar end sec 12 (54213657)EACH5$1,658.19$1,950.00
120PRC flar end sec 18 (54213663)EACH1$2,596.52$2,760.00
121PRC flar end sec 24 (54213669)EACH1$1,896.48$2,960.00
122Storm sew CL A 1 12 (550A0050)LF2,290$92.42$68.00
123Storm sew CL A 1 15 (550A0070)LF908$90.56$70.00
124Storm sew CL A 1 18 (550A0090)LF659$89.35$76.00
125Storm sew CL A 1 24 (550A0120)LF807$118.58$117.00
126Storm sew CL A 2 12 (550A0340)LF742$104.75$70.00
127Storm sew CL A 2 15 (550A0360)LF1,022$97.80$70.00
128Storm sew CL A 2 18 (550A0380)LF142$114.46$83.00
129Storm sew CL A 2 24 (550A0410)LF198$109.49$117.00
130Storm sew CL A 2 30 (550A0430)LF226$222.39$141.00
131Storm sew CL A 2 36 (550A0450)LF247$279.97$168.00
132SS CL A 1 eqrs 24 (550A4100)LF227$172.29$179.00
133SS CL A 2 eqrs 24 (550A4900)LF142$200.72$179.00
134SS CL A 2 eqrs 30 (550A5100)LF170$228.60$230.00
135Storm sewer rem 6 (55100200)LF210$61.60$27.00
136Storm sewer rem 12 (55100500)LF523$61.80$33.00
137Storm sewer rem 15 (55100700)LF103$65.89$69.00
138Storm sewer rem 18 (55100900)LF523$74.10$53.00
139Storm sewer rem 60 (55102100)LF67$87.19$164.00
140Water main 6 (56100600)LF124$145.70$162.00
141Water main 10 (56100800)LF55$139.79$210.00
142Water main 12 (56100900)LF788$129.50$138.00
143Water valves 12 (56105200)EACH2$10,003$6,080.00
144Fire hydnts relocated (56400400)EACH1$4,916.85$5,490.00
145Fire hydnts to BE rem (56400500)EACH10$2,006.94$930.00
146Fire hyd W/aux V & VB (56400820)EACH11$8,591.41$11,530
147Geocomposite wall DR (59100100)SY15$120.00$49.91
148CB TA 4 dia T8G (60200805)EACH9$3,964.06$2,600.00
149CB TA 4 dia T23F&G (60201330)EACH73$4,303.91$3,590.00
150CB TA 5 dia T23F&G (60205030)EACH8$5,224.90$4,840.00
151Man TA 4 dia T1F CL (60218400)EACH1$4,103.54$3,800.00
152Man TA 5 dia T1F CL (60221100)EACH3$4,826.98$5,090.00
153Man TA 5 dia T8G (60221700)EACH1$4,512.76$4,590.00
154Man TA 6 dia T1F CL (60223800)EACH20$7,085.04$7,820.00
155Man TA 6 dia T23F&G (60224038)EACH1$7,788.36$7,800.00
156Man TA 7 dia T23F&G (60224439)EACH3$11,095$12,770
157Man TA 7 dia T1F CL (60224446)EACH11$11,095$12,820
158Man TA 8 dia T1F CL (60224459)EACH4$17,108$16,060
159Man TA 9 dia T1F CL (60224469)EACH1$24,702$22,910
160Inlets TA T23F&G (60237460)EACH40$3,605.91$2,120.00
161VV TA 5 dia T1F CL (60248900)EACH2$5,403.20$4,750.00
162Man adj new T1F CL (60255800)EACH48$1,551.74$1,290.00
163Remov manholes (60500040)EACH2$2,185.93$480.00
164Remov inlets (60500060)EACH5$1,419.32$200.00
165Comb CC&G TB6.12 (60603800)LF1,605$51.63$68.00
166Comb CC&G TB6.18 (60604400)LF11,662$30.44$35.00
167Comb CC&G TM4.12 (60608562)LF144$53.65$66.00
168Comb CC&G TM4.18 (60608572)LF7$57.85$153.00
169Conc median surf 4 (60618300)SF2,665$7.84$5.00
170Guardrail remov (63200310)LF14$33.20$75.00
171Reg sub P-const plan (66901001)LS1$4,233.67$3,400.00
172Reg sub F con report (66901003)LS1$1,085.56$500.00
173Reg sub mon (66901006)CAL DAY28$1,194.11$815.00
174Mobilization (67100100)LS1$735,000$789,000
175Changeable message SN (70107025)CAL DAY100$37.99$35.00
176Short term pavt mking (70300100)LF2,535$2.17$1.30
177SHRT TRM pavt MK rem (70300150)SF845$3.26$4.00
178Temp PVT MK LTR & sym paint (70300211)SF516$2.17$2.00
179Temp PVT MK line 4 - paint (70300221)LF36,855$0.38$0.35
180Temp PVT MK line 5 - paint (70300231)LF30,347$0.43$0.40
181Temp PVT MK line 6 - paint (70300241)LF2,400$0.81$0.75
182Temp PVT MK line 8 - paint (70300251)LF401$1.09$1.00
183Temp PVT MK line 12 - paint (70300261)LF1,405$0.81$0.75
184Temp PVT MK line 24 - paint (70300281)LF173$2.17$2.00
185Temp conc barrier (70400100)LF213$70.56$130.00
186Imp attn temp NRN TL2 (70600241)EACH2$5,427.79$5,000.00
187Sign panel T1 (72000100)SF175$27.14$25.00
188Remov sin pan assy TA (72400100)EACH33$162.83$150.00
189Remov sin pan assy TB (72400200)EACH5$162.83$150.00
190Teles STL sin support (72800100)LF410$21.17$19.50
191THPL PVT MK LTR & sym (78000100)SF906$5.43$5.00
192THPL PVT MK line 4 (78000200)LF20,351$0.85$0.78
193THPL PVT MK line 6 (78000400)LF985$1.09$1.00
194THPL PVT MK line 8 (78000500)LF645$1.63$1.50
195THPL PVT MK line 12 (78000600)LF3,786$2.33$2.15
196THPL PVT MK line 24 (78000650)LF132$5.43$5.00
197Raised refl pavt MKR (78100100)EACH130$57.53$53.00
198PVT MKG rem grinding (78300201)SF22,358$0.38$0.35
199Elect serv install (80400100)EACH1$2,732.06$2,500.00
200Elect util serv conn (80400200)LS1$10,000$10,000
201Undrgrd C galvs 2 (81028200)LF30$38.25$35.00
202Undrgrd C galvs 2 1/2 (81028210)LF1,510$49.18$45.00
203Undrgrd C CNC 1 1/4 (81028730)LF9,290$10.93$10.00
204Handhole C conc (81400730)EACH2$3,114.54$2,850.00
205EC C XLP use 1C 6 (81702130)LF47,405$1.31$1.20
206EC C XLP use 1C 2 (81702150)LF100$5.46$5.00
207LT cont basem 240V100 (82500350)EACH1$15,846$14,500
208LP F M 11BC 8" X 6' (83600350)EACH43$1,912.44$1,750.00
209Rem LT unit salv (84200500)EACH7$1,311.39$1,200.00
210Rem pole FDN (84200804)EACH7$546.41$500.00
211Remov lighting contr (84500110)EACH1$1,070.97$980.00
212Remov elect serv inst (84500120)EACH1$437.13$400.00
213Remov LTG contr FDN (84500130)EACH1$928.90$850.00
214Main EX TR sig instal (85000200)EACH1$9,288.99$8,500.00
IDOT contract 61L48: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy